This is a draft item of legislation. This draft has since been made as a Northern Ireland Statutory Rule: The Renewables Obligation Order (Northern Ireland) 2009 No. 154
29.—(1) This Article applies to a generating station—
(a)which was accredited as at 31st March 2009;
(b)which has not ceased to be accredited since that date; and
(c)to which Articles 26 to 28 do not apply.
(2) This Article also applies to a generating station—
(a)which was accredited on or before 31st March 2011;
(b)which, since being accredited, has not ceased to be accredited at any time;
(c)in respect of which preliminary accreditation was held—
(i)as at 31st March 2009, and
(ii)from that date until the date on which the station was accredited; and
(d)to which Articles 26 to 28 do not apply.
(3) Subject to paragraphs (4) to (6), the amount of electricity to be stated in each NIROC issued in respect of electricity generated by a generating station to which this Article applies is to be determined in accordance with Article 25(4) and (5).
(4) Where the electricity generated by a generating station to which this Article applies is generated in a way described in the first column of Part 4 of Schedule 2, the amount of electricity to be stated in each NIROC issued in respect of that electricity is (subject to paragraph (5)) the amount which corresponds to that description in the second column of that Part of that Schedule.
(5) Where, at any time it generates electricity after 31st March 2011, the generating station’s total installed capacity is greater than it was on 31st March 2011, paragraph (4) applies only in relation to NIROCs which are to be issued in respect of—
(a)where electricity generated using the total installed capacity of the station as at 31st March 2011 (“the original capacity”) is measured separately from electricity generated using capacity which has been added to the station since that date, the electricity which is generated using the station’s original capacity;
(b)in any other case, the appropriate percentage of the electricity generated by the station (the appropriate percentage for these purposes being the total installed capacity of the station as at 31st March 2011 expressed as a percentage of the total installed capacity of the station as at the date of generation of the electricity).
(6) In relation to the remainder of the electricity generated by the generating station, the amount of electricity to be stated in each NIROC is to be determined in accordance with Article 25(4) and (5).
(7) This Article is subject to Article 30.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys