Chwilio Deddfwriaeth

The Pollution Prevention and Control Regulations (Northern Ireland) 2003

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: SCHEDULE 3

 Help about opening options

Alternative versions:

Status:

This version of this schedule contains provisions that are prospective. Help about Status

Close

Status

The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section. A version of a provision is prospective either:

  1. where the provision (Part, Chapter or section) has never come into force or;
  2. where the text of the provision is subject to change, but no date has yet been appointed by the appropriate person or body for those changes to come into force.

Commencement Orders listed in the ‘Changes to Legislation’ box as not yet applied may bring this prospective version into force.

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Pollution Prevention and Control Regulations (Northern Ireland) 2003. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 3:

Changes and effects yet to be applied to the whole Rule associated Parts and Chapters:

Whole provisions yet to be inserted into this Rule (including any effects on those provisions):

Prospective

Regulations 9 and 10(13)

SCHEDULE 3N.I.PRESCRIBED DATE AND TRANSITIONAL ARRANGEMENTS

PART 1N.I.PART A INSTALLATIONS AND MOBILE PLANT

1.  The prescribed date for a new Part A installation or new Part A mobile plant is–N.I.

(a)where an application for a permit to operate the installation or mobile plant is duly made before 1st January 2004, the determination date for the installation or mobile plant;

(b)where no such application is made, 1st January 2004.

Commencement Information

I1Sch. 3 para. 1 in operation at 31.3.2003, see reg. 1

2.—(1) Subject to paragraph 4, the prescribed date for an existing Part A installation or existing Part A mobile plant is–N.I.

(a)where an application for a permit to operate the installation or mobile plant is duly made within the relevant period (or before the beginning of the relevant period where allowed under paragraph 5), the determination date for the installation or mobile plant;

(b)where no such application is made, the day after the date on which the relevant period expires.

(2) For the purpose of sub-paragraph (1) the relevant period for an existing Part A installation or existing Part A mobile plant is the period specified for that description of installation or mobile plant in the following table–

Any installation where an activity falling within the following Section of Part 1 of Schedule 1 is carried out or any mobile plant used to carry out such an activityRelevant Period
Section 1.11st – 30th April 2006
Section 1.21st – 31st July 2004
Section 2.11st – 31st July 2004
Section 2.21st – 31st July 2004
Section 2.31st – 30th April 2006
Section 3.11st – 31st July 2004
Section 3.21st – 30th April 2006
Section 3.31st – 31st July 2004
Section 3.41st – 31st July 2004
Section 3.51st – 31st July 2004
Section 3.61st – 31st July 2004
Section 4.11st – 30th April 2006
Section 4.21st – 30th April 2006
Section 4.31st – 30th September 2005
Section 4.41st – 30th April 2006
Section 4.51st – 30th April 2006
Section 4.61st – 30th April 2006
Section 4.71st – 30th September 2005
Section 5.11st – 30th September 2005
Section 5.21st January – 31st March 2007
Section 5.31st – 30th September 2005
Section 5.41st – 30th September 2005
Section 5.51st – 30th April 2006
Section 6.1 (a) – (c)1st – 31st July 2004
Section 6.1 (d)1st – 30th April 2006
Section 6.21st – 30th April 2006
Section 6.31st – 30th September 2005
Section 6.41st – 30thril 2006
Section 6.61st – 30th April 2006
Section 6.71st – 31st July 2004
Section 6.8 paragraphs (a), (b) and (c)1st – 28th February 2005
Section 6.8 paragraphs (d), (e) and (f)1st – 30th September 2005
Section 6.9

1st November 2006 to

31st January 2007

(3) For the purpose of sub-paragraph (2), where an activity falls within a description in Part A of more than one Section of Part 1 of Schedule 1 it shall be regarded as falling only within that description which fits it most aptly.

(4) Subject to sub-paragraph (5), where more than one activity falling within Part A of any Section in Part 1 of Schedule 1 is carried out in an existing Part A installation or using an existing Part A mobile plant, the relevant period for that installation or mobile plant shall be the period beginning with the earliest date listed against one of those activities in the table in sub-paragraph (2).

(5) Where more than one activity falling within Part A of any Section in Part 1 of Schedule 1 is carried out in an existing Part A installation, the operator of the installation may apply to the chief inspector to determine that the relevant period for the installation shall not be the period determined by sub-paragraph (4) but the later period listed in the table in sub-paragraph (2) against the primary activity of the installation.

(6) An application under sub-paragraph (5) shall be in writing and shall–

(a)identify the installation concerned;

(b)list the activities falling within Part A of any Section in Part 1 of Schedule 1 which are carried out in the installation;

(c)identify which of those activities the operator considers to be the primary activity,and shall be submitted at least 3 months before the beginning of the period which would be the relevant period for the installation concerned under sub-paragraph (4).

(7) Where the chief inspector receives a duly made application under sub-paragraph (5) he shall, if he agrees with the operator that the activity identified pursuant to sub-paragraph (6)(c) is the primary activity, serve notice of this determination on the operator, and the period listed against that activity in sub-paragraph (2) shall be the relevant period for the installation.

(8) Where the chief inspector does not agree with the operator as mentioned in sub-paragraph (7) he shall serve notice of this determination on the operator and the relevant period for the installation shall be the period determined by sub-paragraph (4).

(9) The chief inspector shall serve notice of his determination of any application made under sub-paragraph (5) within 2 months of receiving the application.

(10) Where there is more than one operator of an installation, an application under sub-paragraph (5) shall be made by the operators of the installation jointly and the references in sub-paragraphs (6) to (8) to the operator shall be construed as a reference to all of the operators.

(11) For the purpose of sub-paragraphs (5) to (9) the primary activity of an installation is the activity the carrying out of which constitutes the primary purpose for operating the installation.

Commencement Information

I2Sch. 3 para. 2 in operation at 31.3.2003, see reg. 1

3.  For the purpose of paragraphs 1 and 2, where separate applications are made to operate different parts of a Part A installation–N.I.

(a)the date by which applications have been made in relation to all parts of the installation shall be treated as the date on which an application for a permit to operate the installation is made;

(b)an application for a permit to operate the installation shall only be treated as having been duly made if each of the separate applications are duly made;

(c)the determination date for the installation shall be, in relation to each part of the installation which is covered by a separate application, the determination date for that part of the installation.

Commencement Information

I3Sch. 3 para. 3 in operation at 31.3.2003, see reg. 1

4.—(1) Where there is a substantial change in the operation of an existing Part A installation on or after 31 October 1999 and before 1st January 2004 the prescribed date for that part of the installation affected by the change shall be–N.I.

(a)where an application for a permit authorising the operation of that part of the installation is duly made before 1st January 2004, the determination date for that part of the installation;

(b)where no such application is made, 1st January 2004.

(2) Where there is a substantial change in the operation of an existing Part A installation on or after 1st January 2004, the prescribed date for that part of the installation affected by the change shall be the date on which the change is made if earlier than the date which would be the prescribed date for the installation under paragraph 2.

Commencement Information

I4Sch. 3 para. 4 in operation at 31.3.2003, see reg. 1

5.—(1) Subject to sub-paragraph (2), an application for a permit to operate an existing Part A installation or Part A mobile plant shall not be made before the beginning of the relevant period for that installation or mobile plant without the consent of the chief inspector.N.I.

(2) Where an operator of an existing Part A installation proposes to make a substantial change in the operation of the installation he may make an application before the beginning of the relevant period for a permit to operate that part of the installation that will be affected by the substantial change.

Commencement Information

I5Sch. 3 para. 5 in operation at 31.3.2003, see reg. 1

6.  In this Part of this Schedule –N.I.

“determination date” means–

(a)

for an installation, part of an installation or mobile plant in relation to which a permit is granted, the date on which it is granted, whether in pursuance of the application for the permit or following an appeal;

(b)

for an installation, part of an installation or mobile plant in relation to which a permit is refused and the applicant for the permit appeals against the refusal, the date of the determination of the appeal refusing the permit;

(c)

for an installation, part of an installation or mobile plant in relation to which a permit is refused and no appeal is made against the refusal, the date immediately following the last day, determined in accordance with paragraph 2 of Schedule 9, on which notice of appeal might have been given;

“existing” means, in relation to a Part A installation or a Part A mobile plant–

(a)

an installation or mobile plant which is put in to operation before 31st October 1999;or

(b)

an installation or mobile plant which is put into operation on or after that date but before 31st October 2000, provided that–

(i)

the operation of the installation or mobile plant was authorised by the relevant authorisation before 31st October 1999; or

(ii)

an application for such authorisation was duly made before that date;

“new” means, in relation to a Part A installation or a Part A mobile plant, an installation or plant which is put into operation on or after 31st October 1999 other than an existing Part A installation or Part A mobile plant;

“relevant authorisation” means, in relation to the operation of a Part A installation or Part A mobile plant–

(a)

where the operation of the installation or mobile plant immediately before 31st October 1999 requires an authorisation under the Industrial Pollution Control (Northern Ireland) Order 1997(1), an authorisation under that Order;

(b)

where the operation of the installation or mobile plant immediately before 31st October 1999 requires a disposal licence under the Pollution Control and Local Government (Northern Ireland)1978(2), a disposal licence under that Order;

(c)

in any other case, planning permission granted under the Planning (Northern Ireland) Order 1991(3);

“relevant period” shall be interpreted in accordance with paragraph 2.

Commencement Information

I6Sch. 3 para. 6 in operation at 31.3.2003, see reg. 1

PART 2N.I.PART B AND PART C INSTALLATIONS AND MOBILE PLANT

7.  The prescribed date for a new Part B or Part C installation or a new Part B or Part C mobile plant is the relevant date for that installation or mobile plant.N.I.

Commencement Information

I7Sch. 3 para. 7 in operation at 31.3.2003, see reg. 1

8.  The prescribed date for an existing Part B or Part C installation or existing Part B or Part C mobile plant is the determination date for that installation or mobile plant.N.I.

Commencement Information

I8Sch. 3 para. 8 in operation at 31.3.2003, see reg. 1

9.—(1) Subject to the following provisions of this paragraph, no application for a permit to operate an existing Part B or Part C installation or existing Part B or Part C mobile plant shall be made to the enforcing authority.N.I.

(2) Where an operator of a Part B or Part C installation or a Part B or Part C mobile plant proposes to put the installation or mobile plant into operation during the period of six months ending on the relevant date for the installation or mobile plant, he may make an application for a permit to operate that installation or mobile plant.

(3) The operator of an existing Part B or Part C installation or existing Part B or Part C mobile plant shall, unless he has made an application to operate the installation or mobile plant under sub-paragraph (2), be deemed to have made an application for a permit to operate that installation or mobile plant on the relevant date for that installation or mobile plant.

(4) Where sub-paragraph (3) applies in relation to an existing Part B or Part C installation and different parts of the installation are operated by different operators, each operator shall be deemed to have made an application to operate that part of the installation which he operates.

(5) Schedule 4 shall not apply to a deemed application under sub-paragraph (3).

(6) The enforcing authority shall give notice of its determination of a deemed application under sub-paragraph (3) to the applicant within the period of 12 months beginning with the date on which the application is deemed to have been made and if the enforcing authority fails to give notice of its determination within that period the application shall, if the applicant notifies the authority in writing that he treats the failure as such, be deemed to have been refused at the end of that period.

(7) Where sub-paragraph (3) applies the enforcing authority shall, within 2 months of the date on which the application is deemed to have been made, notify the operator of the installation or mobile plant of the deemed application and of the requirements of sub-paragraph (6).

(8) Where separate applications are deemed to have been made under sub-paragraph (4) to operate different parts of a Part B or Part C installation the prescribed date for the installation shall be, in relation to each part of the installation covered by a separate application, the determination date for that part of the installation.

Commencement Information

I9Sch. 3 para. 9 in operation at 31.3.2003, see reg. 1

10.  For the purpose of this Part of this Schedule the relevant date for a Part B installation or a Part B mobile plant is 1st April 2008.N.I.

Commencement Information

I10Sch. 3 para. 10 in operation at 31.3.2003, see reg. 1

11.—(1) For the purpose of this Part of this Schedule the relevant date for Part C installation or Part C mobile plant is the date specified for that description of installation or mobile plant in the following table–N.I.

Any installation where an activity falling within Part C of the following Sections of Part 1 of Schedule 1 is carried out or any mobile plant used to carry out such an activityRelevant Date
Section 1.11st April 2004
Section 1.21st April 2005
Section 2.11st April 2006
Section 2.21st April 2006
Section 3.11st April 2004
Section 3.51st April 2004
Section 3.61st April 2005
Section 5.11st April 2006
Section 6.41st April 2006
Section 6.51st April 2007
Section 6.61st April 2005
Section 6.71st April 2006
Section 6.81st April 2006

(2) For the purpose of sub-paragraph (1), where an activity falls within a description in Part C of more than one Section of Part 1 of Schedule 1 it shall be regarded as falling only within that description which fits it most aptly.

(3) Where more than one activity falling within Part C of any Section in Part 1 of Schedule 1 is carried out in an existing Part C installation or using an existing Part C mobile plant, and the activities have different relevant dates, the relevant date for that installation or mobile plant shall be the earliest of those dates.

Commencement Information

I11Sch. 3 para. 11 in operation at 31.3.2003, see reg. 1

12.  In this Part of this Schedule–N.I.

“determination date” means–

(a)

for an installation, part of an installation or mobile plant in relation to which a permit is granted, the date on which it is granted, whether in pursuance of the application for the permit or following an appeal;

(b)

for an installation, part of an installation or mobile plant in relation to which a permit is refused and the applicant for the permit appeals against the refusal, the date of the determination of the appeal refusing the permit;

(c)

for an installation, part of an installation or mobile plant in relation to which a permit is refused and no appeal is made against the refusal, the date immediately following the last day, determined in accordance with paragraph 2 of Schedule 9, on which notice of appeal might have been given;

“existing” means, in relation to a Part B or Part C installation or Part B or Part C mobile plant, an installation or mobile plant which is put into operation before the relevant date for that installation or mobile plant;

“new” means, in relation to a Part B or Part C installation or Part B or Part C mobile plant, an installation or mobile plant which is put into operation on or after the relevant date for that installation or mobile plant;

“relevant date” shall be interpreted in accordance with paragraphs 10 and 11.

Commencement Information

I12Sch. 3 para. 12 in operation at 31.3.2003, see reg. 1

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Rule as a PDF

The Whole Rule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Rheol Gyfan

Y Rheol Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill