Changes over time for: Cross Heading: SECTION 3.1

 Help about opening options

Alternative versions:

Changes to legislation:

The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, Cross Heading: SECTION 3.1 is up to date with all changes known to be in force on or before 05 March 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

SECTION 3.1N.I.PRODUCTION OF CEMENT AND LIME

Commencement Information

I1Sch. 1 Pt. 1 section 3.1 in operation at 20.6.2013, see reg. 1

Part A

(a)Producing cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day.

(b)Producing lime or magnesium oxide in kilns with a production capacity of more than 50 tonnes per day.

Part B

(a)Blending cement in bulk or using cement in bulk other than at a construction site, including the bagging of cement and cement mixtures, the batching of ready-mixed concrete and the manufacture of concrete blocks and other cement products where the activity is not related to an activity described in paragraph (a) of Part A of this section and is carried on at the same location as an activity described in paragraph (a) of Part B of section 3.5.

(b)Producing lime where the activity is not likely to involve the heating in any period of 12 months of 5,000 tonnes or more of calcium carbonate or calcium magnesium carbonate or, in aggregate, of both.

(c)Slaking lime for the purpose of making calcium hydroxide or calcium magnesium hydroxide when related to an activity described in paragraph (b) above.

(d)Grinding cement clinker not associated with production of cement clinker.

(e)Unless falling within Part A of section 2.1 or 2.2, grinding metallurgical slag in plant with a grinding capacity of more than 250,000 tonnes in any period of 12 months.

Part C

(a)Storing, loading or unloading cement or cement clinker in bulk prior to further transportation in bulk.

(b)Blending cement in bulk or using cement in bulk other than at a construction site, including the bagging of cement and cement mixtures, the batching of ready-mixed concrete and the manufacture of concrete blocks and other cement products where the activity is not related to an activity described in paragraph (a) of Part A of this section and is not described in paragraph (a) of Part B of this section.

(c)Slaking lime for the purpose of making calcium hydroxide or calcium magnesium hydroxide unless related to an activity described in another Part of this Schedule.