Chwilio Deddfwriaeth

The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about opening options

Dewisiadau AgorExpand opening options

Changes over time for: Cross Heading: SECTION 5.4

 Help about opening options

Alternative versions:

Changes to legislation:

The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, Cross Heading: SECTION 5.4 is up to date with all changes known to be in force on or before 05 March 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

SECTION 5.4N.I.DISPOSAL OR RECOVERY OF NON-HAZARDOUS WASTE

Commencement Information

I1Sch. 1 Pt. 1 section 5.4 in operation at 20.6.2013, see reg. 1

Part A

(a)Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, (but excluding activities covered by Council Directive 91/271/EEC(1) of 21 May 1991 concerning urban waste-water treatment [F1as last amended by Council Directive 2013/64/EU] )—

(i)biological treatment;

(ii)physico-chemical treatment;

(iii)pre-treatment of waste for incineration or co-incineration;

(iv)treatment of slags and ashes;

(v)treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.

(b)Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, (but excluding activities covered by Directive 91/271/EEC [F2as last amended by Council Directive 2013/64/EU] )—

(i)biological treatment;

(ii)pre-treatment of waste for incineration or co-incineration;

(iii)treatment of slags and ashes;

(iv)treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.

(c)When the only waste treatment activity carried out is anaerobic digestion, the capacity threshold for this activity shall be 100 tonnes per day.

Part B

Nil.

Part C

Nil.

(1)

O.J.L 135, 30.5.1991, p.40

Yn ôl i’r brig

Options/Cymorth