1.  The carriageway shall be approximately 6.15 metres wide at the crossing.

2.  The ground at the two edge of the carriageway over the crossing shall be made-up to the level of the carriageway for the distance of approximately 1.8 metres beyond the edge to the north west and 1.5 metres beyond the edge to the south east, forming footways to either side of the carriageway.

3.  The surface of the carriageway and footway/run-off areas over the crossing shall be maintained in good and even condition.

4.  The barriers shall be kept in the fully raised position except during the time when engines, carriages or other vehicles passing along the railway have occasion to cross the road.

5.  The electric lamps or equivalent (light emitting diodes) on each barrier mentioned in Schedule 1 shall be lit at all times except when the barriers are in the fully raised position.

6.  The crossing shall be illuminated during the hours of darkness to such a standard that the operator can ascertain in conditions of normal visibility that the crossing is clear before the barriers are fully lowered.

7.  The protecting signals shall be controlled from the signalling control centre containing the crossing control point.

8.  The picture of the crossing shall be exhibited on the television monitor before the sequence of events to close the crossing to road traffic begins. The picture shall continue to be exhibited until either the barriers are fully raised after the ‘raise’ push-button is pressed, or if automatic raising is in operation after the ‘crossing-clear’ push-button is pressed.

9.  Visual indictors and an audible alarm shall be provided at the control point. The indicators shall show when:

(a)the main power supply is available;

(b)all barriers are fully raised;

(c)all the barriers are fully lowered;

(d)at least one of the intermittent red lights of the traffic light signals on each side of the railway is showing along the carriageway.

10.  The audible alarm shall sound if:

(a)any barrier is horizontally dislocated when in the fully lowered position;

(b)the main power supply fails;

(c)all the red traffic light signals facing in one direction fail.

11.  When the ‘lower’ push-button is pressed, or the train initiates the automatic lower sequence, the sequence of events to close the crossing to road traffic shall begin. The sequence shall be:

(a)the amber lamps shall immediately show, and the audible warning shall begin. The lights shall show for approximately 3 seconds;

(b)immediately the amber lamps are extinguished the intermittent red lights shall show;

(c)4 to 6 seconds later, the left-hand side barriers shall begin to descend and shall take a further 6 to 10 seconds to reach the lowered position;

(d)all boom lights shall illuminate when the first barrier moves out of the fully raised position;

(e)once the entrance barriers have reached the down position the right-hand side barriers shall then begin to descend taking 6 to 10 seconds to reach the lowered position;

(f)the audible warning shall stop when all the barriers are fully lowered;

(g)the train can then approach and pass over the crossing.

12.  The arrangements shall be such that the protecting railway signals can only be cleared after the barriers are fully lowered and the ‘crossing clear’ push-button has been pressed. Unless the protecting signals have been cleared for another train, all the barriers shall rise simultaneously either after the ‘raise’ push-button has been pressed or automatically as soon as the train has passed clear of the crossing.

13.  If a train overruns a protecting signal the arrangements shall be such that the red lights will immediately show omitting the amber sequence, the audible warning shall sound and all barriers remain in the raised position.

14.  Stowmarket Controls will be provided for signal CE283 at Cullybackey Station. When the Automatic Lower/ Stowmarket sequence is initiated the normal traffic light sequence of amber followed by flashing red lights shall begin. If Automatic Lower is selected and the route is set, the crossing closure sequence shall continue by lowering the barriers. If Automatic Lower is not available and selected or the route not set, an audible alarm shall sound when the traffic light signals are initiated and the barriers shall not lower without the signaller’s intervention. The barriers can be lowered at any time by the operation of the ‘Lower’ button or the traffic light signals can be cancelled by pressing the ‘Stop’ or ‘Raise’ button after a period of time that will have proved the train at a stand.

15.  The intermittent red lights shall continue to show until the barriers have begun to rise and shall be extinguished before the barriers have risen to an angle of 45 degrees above the horizontal.

16.  If, during the lowering sequence, both red road lights on any RTL are failed before the point in the sequence that the barriers are due to start lowering, then the barriers shall remain in the raised position. In this situation, the barriers can only be lowered from the local control unit until the fault is rectified. Once the barriers have begun to lower a further red light failure shall not stop or prevent them lowering.

17.  If the barriers do not achieve the fully raised position within 10 seconds of starting to raise, then the barriers stop in their present positions. The red RTL’s shall re-illuminate and a failed indication and alarm is given at the supervising control centre. A further 2 seconds may be added if required to allow for relay operation.

18.  A failure indication can only be extinguished when the barriers are either in the fully raised or fully lowered position. In the fully raised position, the failure indication shall only extinguish if the RTL’s are also extinguished. RTL’s shall be taken to be extinguished if the controls are set for them to be extinguished. No light proving is required.

19.  If automatic lowering or raising should take an abnormally long time an audible and visual warning shall be given at the control point.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Rule and provides information about its policy objective and policy implications. They aim to make the Statutory Rule accessible to readers who are not legally qualified and accompany any Northern Ireland Statutory Rule or Draft Northern Ireland Statutory Rule laid before the UK Parliament during the suspension of the Northern Ireland Assembly.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill