xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"
7. The protecting signals shall be controlled from the signalling control centre containing the crossing control point.N.I.
Commencement Information
I1Sch. 2 para. 7 in operation at 20.2.2023, see art. 1(1)