The Landfill (Scotland) Regulations 2003

Changes over time for: SCHEDULE 3

 Help about opening options

Version Superseded: 28/02/2019

Alternative versions:

Status:

Point in time view as at 01/08/2013.

Changes to legislation:

There are currently no known outstanding effects for the The Landfill (Scotland) Regulations 2003, SCHEDULE 3. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulations 5 and 10(3)(a)(i)

SCHEDULE 3SGENERAL REQUIREMENTS FOR ALL LANDFILLS

LocationS

1.—(1) The location of a landfill must take into consideration requirements relating to–

(a)the distances from the boundary of the site to residential and recreational areas, waterways, water bodies and other agricultural or urban sites;

(b)the existence of groundwater, coastal water or nature protection zones in the area;

(c)the geological or hydrogeological conditions in the area;

(d)the risk of flooding, subsidence, landslides or avalanches on the site; and

(e)the protection of the natural or cultural heritage in the area.

(2) A landfill permit may be issued for the landfill only if–

(a)the characteristics of the site with respect to the requirements in sub-paragraph (1), or

(b)the corrective measures to be taken,

indicate that the landfill does not pose a serious environmental risk.

(3) In this paragraph “nature protection zone” means land which has been notified under section 28 of the Wildlife and Countryside Act 1981 M1 or a European site within the meaning of regulation 10(1) of the Conservation (Natural Habitats, &c.) Regulations 1994 M2.

Marginal Citations

Water control and leachate managementS

2.—(1) Subject to sub-paragraphs (2) and (3), appropriate arrangements shall be made having regard to the characteristics of the landfill and prevailing meteorological conditions in order to –

(a)control rainwater entering the landfill body;

(b)prevent surface water or groundwater from entering into landfilled waste;

(c)collect contaminated water and leachate and treat it to the appropriate standard so it can be discharged.

(2) Arrangements need not be made in accordance with sub-paragraph (1)(c) if SEPA decides that the landfill poses no potential hazard to the environment in view of its location and the kinds of waste to be accepted at the landfill.

(3) This paragraph does not apply to inert landfills.

Protection of soil and water and leachate collection and sealing systemsS

3.—(1) The landfill must be situated and designed so as to –

(a)provide the conditions for prevention of pollution of the soil, groundwater or surface water; and

(b)ensure efficient collection of leachate as and when required by paragraph 2.

(2) Soil, groundwater and surface water is to be protected by the use of a geological barrier combined with–

(a)a bottom liner during the operational phase of the landfill; and

(b)a top liner following closure and during the after-care phase.

(3) The geological barrier shall comply with the requirements of sub-paragraph (4) and shall also provide sufficient attenuation capacity to prevent a potential risk to soil and groundwater.

(4) The landfill base and sides shall consist of a mineral layer which provides protection of soil, groundwater and surface water at least equivalent to that resulting from the following permeability and thickness requirements–

(a)in a landfill for hazardous waste: K ≤ 1.0 × 10-9 metre/second: thickness ≥ 5 metres;

(b)in a landfill for non-hazardous waste: K ≤ 1.0 × 10-9 metre/second: thickness ≥ 1 metre;

(c)in a landfill for inert waste: K ≤ 1.0 × 10-7 metre/second: thickness ≥ 1 metre.

(5) Where the geological barrier does not meet the requirements of sub-paragraph (4) naturally, it may be completed artificially and reinforced by other means giving equivalent protection, but in any such case a geological barrier established by artificial means must be at least 0.5 metres thick.

(6) A leachate collection and sealing system to ensure that leachate accumulation at the base of the landfill is kept to a minimum must also be provided in any hazardous or non-hazardous landfill in accordance with the following table:

Leachate collection and bottom sealing

Landfill categoryNon-hazardousHazardous
Artificial sealing linerRequiredRequired
Drainage liner ≥ 0.5 metresRequiredRequired

(7) Where the potential hazards to the environment indicate that the prevention of leachate formation is necessary, surface sealing may be required taking account of the following guidelines:–

Landfill categoryNon-hazardousHazardous
Gas drainage layerRequiredNot required
Artificial sealing linerNot requiredRequired
Impermeable mineral layerRequiredRequired
Drainage layer > 0.5 metresRequiredRequired
Top soil cover > 1 metreRequiredRequired

(8) The requirements of sub-paragraphs (3) to (7) may be reduced to an appropriate extent if on the basis of an assessment of environmental risks, having regard in particular to Directive 80/68/EEC M3

(a)it has been decided in accordance with paragraph 2 that the collection and treatment of leachate is not necessary; or

(b)it is established that the landfill poses no potential hazard to soil, groundwater or surface water.

Marginal Citations

M3O.J. No. L 20, 26.1.80, p.43 as amended by Directive 91/692/EEC O.J. No. L 377, 31.12.91, p.48.

Gas controlS

4.—(1) Appropriate measures must be taken in order to control the accumulation and migration of landfill gas.

(2) Landfill gas must be collected from all landfills receiving biodegradable waste and the landfill gas must be treated and, to the extent possible, used.

(3) The collection, treatment and use of landfill gas under sub-paragraph (2) must be carried on in a manner which minimises damage to or deterioration of the environment and risk to human health.

(4) Landfill gas which cannot be used to produce energy must be flared.

Nuisances and hazardsS

5.—(1) Measures must be taken to minimise the nuisances and hazards arising from the landfill in relation to–

(a)emissions of odours and dust;

(b)wind-blown materials;

(c)noise and traffic;

(d)birds, vermin and insects;

(e)formation of aerosols; and

(f)fires.

(2) The landfill must be equipped so that dirt originating from the site is not dispersed onto public roads and the surrounding land.

StabilityS

6.—(1) The placement of waste must ensure stability of all the waste on the site, and associated structures, and in particular must avoid slippages.

(2) Where an artificial barrier is used, the geological substratum must be sufficiently stable, taking into account the morphology of the landfill, to prevent settlement that may cause damage to the barrier.

Site securityS

7.—(1) The landfill must be secured to prevent free access to the site.

(2) The gates of the landfill must be locked outside operating hours.

(3) The system of control and access to each facility must contain a programme of measures to detect and discourage illegal dumping in the facility.

[F1Temporary storage of metallic mercuryS

8.(1) The temporary storage of metallic mercury for more than one year must comply with the requirements in sub-paragraphs (2) to (7).

(2) Metallic mercury must be stored separately from other waste.

(3) Containers of metallic mercury must—

(a)be stored in collecting basins suitably coated so as to be free of cracks and gaps and impervious to metallic mercury; and

(b)have a containment volume adequate for the quantity of mercury stored.

(4) The storage site must—

(a)be provided with engineered or natural barriers that are adequate to protect the environment against mercury emissions; and

(b)have a containment volume adequate for the total quantity of mercury stored.

(5) The storage site floor must—

(a)be covered with mercury-resistant sealants; and

(b)have a slope and a collection sump.

(6) The storage site must be equipped with a fire protection system.

(7) Storage must be arranged in a way that ensures that all containers are easily retrievable.]

Textual Amendments

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill