Chwilio Deddfwriaeth

The Renewables Obligation (Scotland) Order 2009

Changes over time for: Section 25

 Help about opening options

Alternative versions:

Status:

Point in time view as at 22/03/2024.

Changes to legislation:

There are currently no known outstanding effects for the The Renewables Obligation (Scotland) Order 2009, Section 25. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F2Calculating a generating station’s RO eligible renewable output

This adran has no associated Nodyn Gweithredol

25.(1) Subject to article 26, the RO eligible renewable output of a generating station in any month is equal to—

(a)where the RO input electricity used by the generating station during that month does not exceed 0.5% of the RO output electricity of that station during that month, ; and

(b)in any other case, .

(2) In paragraph (1)—

(a)A is equal to

where—

(i)

C is the RO output electricity of the generating station during the month in question;

(ii)

D is the energy content of all of the renewable sources used in generating that station’s RO output electricity during that month, less the energy content of—

(a)

any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of sub-head (bb) or (cc) is in part composed);

(b)

any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass); and

(c)

except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than 2 megajoules per metre cubed; and

(iii)

E is the energy content of all of the fuels used in generating that station’s RO output electricity during that month;

(b)

B is the RO output electricity of that station during that month less the RO input electricity it uses during that month;

(c)

C has the same meaning as in sub-paragraph (a)(i); and

(d)

F is the total amount of electricity generated by that station from an ineligible renewable source during that month.

(3) Paragraphs (4) and (7) apply for the purposes of this Part and Part 6.

(4) Where during any month the RO eligible renewable output of a generating station is generated in two or more ways, the proportion of the station’s RO eligible renewable output which is generated in each of those ways is—

(a)in the case of electricity generated in the way described as “landfill gas heat recovery” in Schedule 2, ;

(b)in the case of electricity generated using mixed gas in the way described as “AD” in Schedule 2, ;

(c)in the case of electricity generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, ; and

(d)in the case of electricity generated in a way not falling within sub-paragraph (a), (b) or (c), .

(5) In paragraph (4)—

(a)G is the maximum capacity in that month at which the station could generate electricity—

(i)in the way described as “landfill gas heat recovery” in Schedule 2;

(ii)using RO capacity; and

(iii)for a sustained period without causing damage to the station (assuming the heat used by the station to generate electricity was available to it without interruption);

(b)H is the total installed capacity of the RO capacity of the station in that month;

(c)I is the energy content of the mixed gas used in generating the station’s RO output electricity during that month;

(d)J is the energy content of all of the renewable sources used in generating the station’s RO output electricity during that month;

(e)K is the dry mass of—

(i)any waste which constitutes a renewable source (other than sewage); and

(ii)any biomass (other than sewage);

from which the mixed gas used in generating the station’s RO output electricity during that month is formed, less the dry mass of any digestible fossil fuel from which that waste or biomass is in part composed;

(f)L is the dry mass of all of the material from which the mixed gas used in generating the station’s RO output electricity during that month is formed, less the dry mass of any digestible fossil fuel from which that material is in part composed;

(g)M is the dry mass of all the material from which the mixed gas used in generating the station’s RO output electricity during that month is formed, less the dry mass of any digestible fossil fuel from which that material is in part composed;

(h)N is the energy content of the renewable sources used when generating the station’s RO output electricity in that way during that month less the energy content of—

(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of head (ii) or (iii) is in part composed);

(ii)any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass); and

(iii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than 2 megajoules per metre cubed; and

(i)P is the energy content of all of the renewable sources used in generating the station’s RO output electricity during that month less the energy content of—

(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which fuel the energy content of which is deducted by virtue of head (ii) or (iii) is in part composed);

(ii)any of those renewable sources which is a Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass); and

(iii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals as the inlet to the station of less than 2 megajoules per metre cubed.

(6) References in paragraph (4) to a way of generating RO eligible renewable output are references to—

(a)one of the ways of generating electricity described in Schedule 2;

(b)generating electricity in the way described in article 28D(1)(c) (low-range co-firing of relevant energy crops);

(c)generating electricity in the way described in article 28E(1)(c) (low-range co-firing of relevant energy crops with CHP);

(d)generating electricity from renewable sources in a way not falling within sub-paragraph (a), (b) or (c).

(7) Where during any month two or more types of generating capacity form part of the RO capacity of a generating station, the proportion of the station’s RO eligible renewable output which is generated using each of those types of generating capacity is .

(8) In paragraph (7)—

(a)Q is the total installed capacity of that type of generating capacity of the station in that month (other than any of that type of generating capacity which forms part of the excluded capacity of the station); and

(b)R is the total installed capacity of the RO capacity of the station in that month.

(9) References in paragraph (7) to a type of generating capacity are references to one of the following—

(a)pre-2013 capacity;

(b)2013/14 capacity;

(c)2014/15 capacity;

(d)2015/16 capacity;

(e)post-2016 capacity.

(10) In this article—

“dry mass”, in relation to a fuel, means the mass of the fuel when any water present in it has been removed; and

“mixed gas” means gas formed by the anaerobic digestion of sewage together with—

(a)

waste which constitutes a renewable source (other than sewage); or

(b)

biomass (other than sewage).]

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Nodyn Gweithredol

Mae Nodyn Gweithredol yn nodi datganiad byr o ddiben Offeryn Statudol yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill