The Renewables Obligation (Scotland) Order 2009

Changes over time for: Section 28

 Help about opening options

Alternative versions:

Status:

Point in time view as at 31/03/2023.

Changes to legislation:

There are currently no known outstanding effects for the The Renewables Obligation (Scotland) Order 2009, Section 28. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F1Electricity generated by qualifying combined heat and power generating stations

This adran has no associated Nodyn Gweithredol

28.(1) This article applies to electricity—

(a)which is generated by a qualifying combined heat and power generating station in a way described in the first column of Part 2B of Schedule 2;

(b)to which none of articles 28A to 28E apply; and

(c)which is generated by a generating station to which article 29 does not apply.

(2) Subject to paragraphs (3) to (6), the amount of electricity to be stated in each SROC issued in respect of electricity to which this article applies is to be determined in accordance with article 27(4) to (8).

(3) Where electricity to which this article applies is generated using pre-2013 capacity, the amount of electricity to be stated in each SROC is—

(a)in respect of the qualifying proportion of that electricity, the amount of electricity in the second column of Part 2B of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule; and

(b)in respect of the remainder of that electricity, the amount of electricity in the third column of Part 2B of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule.

(4) Where a declaration has been made in accordance with paragraph (7) in respect of the 2013/15 capacity of a generating station, and electricity to which this article applies is generated by that station using 2013/15 capacity, the amount of electricity to be stated in each SROC is—

(a)in respect of the qualifying proportion of that electricity, the amount of electricity in the second column of Part 2B of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule; and

(b)in respect of the remainder of that electricity, the amount of electricity in the third column of Part 2B of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule.

(5) Where a declaration has been made in accordance with paragraph (7) in respect of the 2015/16 capacity of a generating station, and electricity to which this article applies is generated by that station using 2015/16 capacity, the amount of electricity to be stated in each SROC is—

(a)in respect of the qualifying proportion of that electricity, the amount of electricity in the second column of Part 2C of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule; and

(b)in respect of the remainder of that electricity, the amount of electricity in the third column of Part 2C of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule.

(6) Where a declaration has been made in accordance with paragraph (7) in respect of the post-2016 capacity of a generating station, and electricity to which this article applies is generated by that station using post-2016 capacity, the amount of electricity to be stated in each SROC is—

(a)in respect of the qualifying proportion of that electricity, the amount of electricity in the second column of Part 2D of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule; and

(b)in respect of the remainder of that electricity, the amount of electricity in the third column of Part 2D of Schedule 2 which corresponds to the description of the way in which the electricity is generated in the first column of that Part of that Schedule.

(7) A declaration is made in accordance with this paragraph if it meets the following conditions—

(a)it is made by the operator of the generating station to the Authority in writing;

(b)it is made in respect of the 2013/15 capacity, 2015/16 capacity or post-2016 capacity of the station;

(c)in the case of a declaration made in respect of the 2013/15 capacity of the station, it confirms that—

(i)2013/15 capacity forms part of the total installed capacity of the station; and

(ii)support has not been given under any relevant scheme for heat produced by the use of that generating capacity;

(d)in the case of a declaration made in respect of the 2015/16 capacity of the station, it confirms that—

(i)2015/16 capacity forms part of the total installed capacity of the station; and

(ii)none of the heat produced by the use of the 2015/16 capacity is eligible for support under a relevant scheme for reasons that include one or both of the following—

(aa)the way in which the station generates electricity;

(bb)the biomass, bioliquid or energy crops used by the station to generate electricity;

(e)in the case of a declaration made in respect of the post-2016 capacity of the station, it confirms that—

(i)post-2016 capacity forms part of the total installed capacity of the station; and

(ii)none of the heat produced by the use of the post-2016 capacity is eligible for support under a relevant scheme for reasons that include one or both of the following—

(aa)the way in which the station generates electricity;

(bb)the biomass, bioliquid or energy crops used by the station to generate electricity; and

(f)it states that, for so long as the station generates electricity in respect of which SROCs may be issued, the operator of the station will not claim support under any relevant scheme for heat produced by the station using the type of generating capacity in respect of which the declaration is made.

(8) A declaration made in accordance with paragraph (7) cannot be withdrawn.

(9) In this article “relevant scheme” means a scheme established by the Secretary of State in exercise of the power in section 100(1)(a) of the Energy Act 2008.

(10) This article is subject to article 32.]

Textual Amendments

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Nodyn Gweithredol

Mae Nodyn Gweithredol yn nodi datganiad byr o ddiben Offeryn Statudol yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill