Chwilio Deddfwriaeth

The Renewables Obligation (Scotland) Order 2009

Changes over time for: PART 5

 Help about opening options

Version Superseded: 01/04/2014

Status:

Point in time view as at 01/04/2013.

Changes to legislation:

There are currently no known outstanding effects for the The Renewables Obligation (Scotland) Order 2009, PART 5. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART 5SROCs to be issued by Authority in respect of renewable output

SROCs to be issued by Authority in respect of a generating station's renewable output

24.—(1) The Authority is to issue SROCs.

(2) Subject to paragraph (3) and article 60 (modification of this Order in relation to microgenerators in certain circumstances), SROCs–

(a)are to be issued in respect of a generating station's renewable output in a month; and

(b)must not be issued before the end of the second month following that month.

(3) When issuing SROCs in respect of electricity generated in a month by a generating station or, in the case of SROCs certifying the matters within section 32B(5), (6) or (8) of the Act, two or more generating stations, the Authority must–

(a)determine the renewable output of that generating station or, as the case may be, those generating stations in that month in accordance with article 25 or 26 (whichever is applicable);

[F1(aa)deduct from that station’s or those stations’ renewable output any electricity which is generated from landfill gas other than electricity—

(i)to be deducted by virtue of sub-paragraph (b);

(ii)generated by a generating station to which article 29 applies;

(iii)generated using pre-2013 capacity;

(iv)generated in the way described as “closed landfill gas” in Schedule 2; or

(v)generated using the heat from a turbine or engine;]

(b)where one or more of the criteria set out in articles 36 to 40 have to be satisfied before SROCs can be issued in respect of that station's or those stations' renewable output, deduct from that output any electricity in respect of which any of those criteria are not satisfied; and

(c)issue SROCs in respect of that station's or those stations' remaining renewable output, the amount of electricity to be stated in each SROC being determined in accordance with articles 27 to 32 (banding and grandfathering).

(4) Where a generating station generates electricity–

(a)wholly from renewable sources a proportion of which is composed of fossil fuel;

(b)wholly from renewable sources and the input electricity used by the generating station in generating that electricity exceeds 0.5 per cent of the total amount of that electricity; or

(c)partly from renewable sources and partly from fossil fuel,

SROCs are to be issued in respect of a proportion only of the electricity generated by the station.

(5) Where the number of megawatt hours of renewable output in respect of which SROCs are to be issued does not equate to a whole number of SROCs, the number of megawatt hours is to be rounded to the nearest figure which does so equate (and where there are two such figures, the number of megawatt hours is to be rounded upwards).

(6) In this article “input electricity”, in relation to a generating station, means–

(a)the total amount of electricity used by that station for purposes directly related to its operation (including for fuel handling, fuel preparation, maintenance and the pumping of water) whether or not that electricity is generated by the station or used while the station is generating electricity; and

(b)where the station generates electricity wholly or partly from hydrogen (other than hydrogen that constitutes fossil fuel), any electricity–

(i)in respect of which SROCs are or have been issued;

(ii)in respect of which SROCs cannot be issued by virtue of any provision of Part 4 (cases and circumstances when a SROC must not be issued); or

(iii)which was not generated from renewable sources,

and which is used in the production of that hydrogen (regardless of where or by whom the hydrogen is produced).

Calculating a generating station's renewable output

25.—(1) Subject to article 26, the renewable output of a generating station in any month is equal to–

(a)where the input electricity used by the generating station during that month does not exceed 0.5 per cent of the gross output of that station during that month, A; and

(b)in any other case,

.

(2) In paragraph (1)–

(a)A is equal to

where–

i

C is the gross output of the generating station during the month in question;

ii

D is the energy content of all of the renewable sources used in generating that station's gross output during that month, less the energy content of–

(aa)

any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of [F2sub-paragraphs (bb) and (dd)] is in part composed);

(bb)

any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass);

(cc)

F3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(dd)

except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than 2 megajoules per metre cubed;

iii

E is the energy content of all of the fuels used in generating that station's gross output during that month;

(b)B is the gross output of that station during that month less the input electricity it uses during that month.

[F4(3) Paragraphs (4) to (4E) apply for the purposes of article 24 and Part 6.

(4) In any month where the renewable output of the station is generated in a single way, the proportion of the station’s renewable output in that month which is generated using—

(a)pre-2013 capacity is ;

(b)2013/14 capacity is ;

(c)2014/15 capacity is ;

(d)2015/16 capacity is ;

(e)post-2016 capacity is .

(4A) In any month where pre-2013 capacity forms all or part of the total installed capacity of a generating station and the renewable output of the station is generated in two or more ways, the proportion of the station’s renewable output in that month which is generated in each of those ways using pre-2013 capacity—

(a)in the case of renewable output generated in the way described as “landfill gas heat recovery” in Schedule 2, is ;

(b)in the case of renewable output generated using mixed gas in the way described as “AD” in Schedule 2, is ;

(c)in the case of renewable output generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, is ;

(d)in the case of renewable output generated in a way not falling within sub-paragraph (a), (b) or (c), is .

(4B) In any month where 2013/14 capacity forms all or part of the total installed capacity of a generating station and the renewable output of the station is generated in two or more ways, the proportion of the station’s renewable output in that month which is generated in each of those ways using 2013/14 capacity—

(a)in the case of renewable output generated in the way described as “landfill gas heat recovery” in Schedule 2, is ;

(b)in the case of renewable output generated using mixed gas in the way described as “AD” in Schedule 2, is ;

(c)in the case of renewable output generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, is ;

(d)in the case of renewable output generated in a way not falling within sub-paragraph (a), (b) or (c), is .

(4C) In any month where 2014/15 capacity forms all or part of the total installed capacity of a generating station and the renewable output of the station is generated in two or more ways, the proportion of the station’s renewable output in that month which is generated in each of those ways using 2014/15 capacity—

(a)in the case of renewable output generated in the way described as “landfill gas heat recovery” in Schedule 2, is ;

(b)in the case of renewable output generated using mixed gas in the way described as “AD” in Schedule 2, is ;

(c)in the case of renewable output generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, is ;

(d)in the case of renewable output generated in a way not falling within sub-paragraph (a), (b) or (c), is .

(4D) In any month where 2015/16 capacity forms all or part of the total installed capacity of a generating station and the renewable output of the station is generated in two or more ways, the proportion of the station’s renewable output in that month which is generated in each of those ways using 2015/16 capacity—

(a)in the case of renewable output generated in the way described as “landfill gas heat recovery” in Schedule 2, is ;

(b)in the case of renewable output generated using mixed gas in the way described as “AD” in Schedule 2, is ;

(c)in the case of renewable output generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, is ;

(d)in the case of renewable output generated in a way not falling within sub-paragraph (a), (b) or (c), is .

(4E) In any month where post-2016 capacity forms all or part of the total installed capacity of a generating station and the renewable output of the station is generated in two or more ways, the proportion of the station’s renewable output in that month which is generated in each of those ways using post-2016 capacity—

(a)in the case of renewable output generated in the way described as “landfill gas heat recovery” in Schedule 2, is ;

(b)in the case of renewable output generated using mixed gas in the way described as “AD” in Schedule 2, is ;

(c)in the case of renewable output generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, is ;

(d)in the case of renewable output generated in a way not falling within sub-paragraph (a), (b) or (c), is .

(5) In paragraphs (4) to (4E)—

(a)F is the energy content of the renewable sources used when generating electricity in that way during that month less the energy content of—

(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of paragraphs (ii) or (iii) is in part composed);

(ii)any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass);

(iii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than two megajoules per metre cubed;

(b)G is the energy content of all of the renewable sources used in generating the station’s gross output during that month less the energy content of—

(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of paragraphs (ii) or (iii) is in part composed);

(ii)any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass);

(iii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than two megajoules per metre cubed;

(c)H is the energy content of the mixed gas used when generating the station’s renewable output during that month;

(d)I is the energy content of all of the renewable sources used in generating the station’s renewable output during that month;

(e)J is the dry mass of—

(i)any waste which constitutes a renewable source (other than sewage); and

(ii)any biomass (other than sewage),

from which the mixed gas used in generating the station’s renewable output during that month is formed, less the dry mass of any digestible fossil fuel from which that waste or biomass is in part composed;

(f)K is the dry mass of the sewage from which the mixed gas used in generating the station’s renewable output during that month is formed;

(g)L is the dry mass of all of the material from which the mixed gas used in generating the station’s renewable output during that month is formed, less the dry mass of any digestible fossil fuel from which that material is in part composed;

(h)M is the maximum capacity in that month at which the station could generate electricity in that way for a sustained period without causing damage to the station (assuming the heat used by the station to generate electricity was available to it without interruption);

(i)N is the total installed capacity of the station in that month;

(j)P is the total installed capacity of the pre-2013 capacity of the station in that month;

(k)Q is the total installed capacity of the 2013/14 capacity of the station in that month;

(l)R is the total installed capacity of the 2014/15 capacity of the station in that month;

(m)S is the total installed capacity of the 2015/16 capacity of the station in that month; and

(n)T is the total installed capacity of the post-2016 capacity of the station in that month.]

(6) In this article–

dry mass”, in relation to a fuel, means the mass of the fuel when any water present in it has been removed;

excepted generating station” means a generating station–

(a)

which is accredited on or before 31st March 2011;

(b)

which, since being accredited, has not ceased to be accredited at any time; and

(c)

in respect of which, if it was not accredited as at 31st March 2009, preliminary accreditation was held on and from that date until the date on which it was accredited;

gross output”, in relation to a generating station, means the total amount of electricity generated by that station;

input electricity” has the same meaning as in article 24; and

mixed gas” means gas formed by the anaerobic digestion of sewage together with–

(a)

waste which constitutes a renewable source (other than sewage); or

(b)

biomass (other than sewage).

[F5(7) Any reference in this article to a way of generating renewable output is a reference to—

(a)one of the ways of generating electricity described in Schedule 2;

(b)generating electricity in the way described in article 28D(1)(c);

(c)generating electricity in the way described in article 28E(1)(c);

(d)generating electricity from renewable sources in a way not falling within sub-paragraphs (a), (b) or (c).]

Renewable output of a qualifying combined heat and power generating station

26.—(1) For the purposes of determining the renewable output of a qualifying combined heat and power generating station in any month during which it generates electricity from waste (other than waste which constitutes biomass or is used for permitted ancillary purposes [F6or is an advanced fuel] or is in the form of a liquid or gaseous fuel produced by means of F7...anaerobic digestion), article 25 applies subject to the following modifications.

(2) For paragraph (2)(a)(ii) of article , substitute–

(ii)D is the energy content of all of the renewable sources used in generating that station's gross output during that month, less the energy content of–

(aa)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of [F8sub-paragraph (cc)] is in part composed);

F9(bb). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(cc)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than 2 megajoules per metre cubed,

multiplied by the proportion which the qualifying power output of that station bears to its total power output;.

[F10(3) For paragraphs (5)(a) and (5)(b) of that article, substitute—

(a)F is the energy content of the renewable sources used when generating electricity in that way during that month less the energy content of—

(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of paragraph (ii) is in part composed);

(ii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than two megajoules per metre cubed;

(b)G is the energy content of all of the renewable sources used in generating the station’s gross output during that month less the energy content of—

(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of paragraph (ii) is in part composed);

(ii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than two megajoules per metre cubed;.]

F11(4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Nodyn Gweithredol

Mae Nodyn Gweithredol yn nodi datganiad byr o ddiben Offeryn Statudol yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill