- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Pwynt Penodol mewn Amser (01/06/2022)
- Gwreiddiol (a wnaed Fel)
Version Superseded: 01/01/2024
Point in time view as at 01/06/2022.
There are currently no known outstanding effects for the The Flood Risk Management (Flood Protection Schemes, Potentially Vulnerable Areas and Local Plan Districts) (Scotland) Regulations 2010, SCHEDULE 2.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Regulation 6(2)(f)
Textual Amendments
1. A description of the scheme, including in particular:S
(a)a description of the location of the scheme;
(b)a description of the physical characteristics of all the works covered by the scheme, including, where relevant, demolition works, and the land use requirements during the construction and operational phases;
(c)a description of the main characteristics of the operational phase of the scheme (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used;
(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) and quantities and types of waste produced during the construction and operation phases.
2. A description of the reasonable alternatives (for example in terms of scheme design, technology, location, size and scale) studied by the local authority which proposed the scheme, which are relevant to the scheme and its specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.S
3. A description of the relevant aspects of the current state of the environment (the “baseline scenario”) and an outline of the likely evolution thereof without implementation of the scheme as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.S
4. A description of the factors specified in regulation 2A(3) likely to be significantly affected by the scheme: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape.S
5.—(1) A description of the likely significant effects of the scheme on the environment resulting from, inter alia:S
(a)the construction and existence of the scheme, including, where relevant, demolition works;
(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;
(c)the emission of pollutants, noise, vibration, light, heat and radiation, the creation of nuisances, and the disposal and recovery of waste;
(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);
(e)the cumulation of effects with other existing and/or approved projects taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;
(f)the impact of the proposed scheme on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the scheme to climate change;
(g)the technologies and the substances used.
(2) The description of the likely significant effects on the factors specified in regulation 2A(3) should cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the scheme. This description should take into account the environmental protection objectives [F2in retained EU law or otherwise under the law of any part of the United Kingdom] which are relevant to the scheme including in particular those established under [F3any law in Scotland which implemented] Council Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora and Directive 2009/147/EC of the European Parliament and of the Council on the conservation of wild birds.
(3) In sub-paragraph (1) “projects” means—
(a)the execution of construction works or of other installations or schemes; and
(b)other interventions in the natural surroundings and landscape including those involving the extraction of mineral resources.
Textual Amendments
6. A description of the forecasting methods or evidence, used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.S
7. A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-scheme analysis). That description should explain the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases.S
8. A description of the expected significant adverse effects of the scheme on the environment deriving from the vulnerability of the scheme to risks of major accidents and/or disasters which are relevant to the scheme. Relevant information available and obtained pursuant to [F4any law which implemented] Directive 2012/18/EU of the European Parliament and of the Council on the control of major-accident hazards involving dangerous substances, amending and subsequently repealing Council Directive 96/82/EC or Council Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations or relevant assessments may be used for this purpose provided that the requirements of these Regulations are met. Where appropriate, this description should include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.S
Textual Amendments
9. A non-technical summary of the information provided under paragraphs 1 to 8.S
10. A reference list detailing the sources used for the descriptions and assessments included in the EIA report in respect of the scheme.]S
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Mae Nodyn Gweithredol yn nodi datganiad byr o ddiben Offeryn Statudol yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys