Point in time view as at 22/04/2011.
There are currently no known outstanding effects for the The Management of Extractive Waste (Scotland) Regulations 2010, PART 1.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1.—(1) These Regulations may be cited as the Management of Extractive Waste (Scotland) Regulations 2010 and, other than regulation 3(1), come into force on 1st April 2010.
(2) Regulation 3(1) comes into force on 1st May 2012.
2.—(1) Subject to paragraph (2), in these Regulations—
“the 1997 Act” means the Town and Country Planning (Scotland) Act 1997(1);
“applicant” means the natural or legal person who makes an application for planning permission to which Part 4 applies;
“best available techniques” is as defined in Article 2(11) of Directive 96/61/EC concerning integrated pollution prevention and control(2);
“Category A waste facility” means a waste facility that does not fall within the scope of Directive 96/82/EC on the control of major-accident hazards involving dangerous substances(3)—
where a failure or incorrect operation, e.g. the collapse of a heap or the bursting of a dam, could give rise to a major accident, on the basis of a risk assessment taking into account factors such as the present or future size, the location and the environmental impact of the waste facility;
which contains waste classified as hazardous under [F1Articles 3(2) and 7 of Directive 2008/98/EC] (4) above a certain threshold; or
“competent person” means a natural person with sufficient training, experience, knowledge and other qualities to enable that person to undertake the duties assigned to them relative to these Regulations;
“dam” means an engineered structure designed to retain or confine water or waste or both within a pond;
“dangerous substance” means a substance, mixture or preparation which is dangerous within the meaning of Directive 67/548/EEC or Directive 1999/45/EC;
“Directive 67/548/EEC” means Council Directive 67/548/EEC on the approximation of laws, regulations and administrative provisions relating to the classification, packaging and labelling of dangerous substances(7);
“Directive 76/464/EEC” means Council Directive 76/464/EEC on pollution caused by certain dangerous substances discharged into the aquatic environment of the [F2EU] (8);
“Directive 80/68/EEC” means Council Directive 80/68/EEC on the protection of groundwater against pollution caused by certain dangerous substances(9).
F3...
“Directive 1999/45/EC” means Directive 1999/45/EC of the European Parliament and of the Council concerning the approximation of the laws, regulations and administrative provisions of the member States relating to the classification, packaging and labelling of dangerous preparations(10);
“Directive 2000/60/EC” means Directive 2000/60/EC of the European Parliament and of the Council establishing a framework for Community action in the field of water policy(11);
[F4“Directive 2008/98/EC” means Directive 2008/98/EC of the European Parliament and of the Council on waste;]
“extractive waste” means waste produced from an extractive industry and resulting from prospecting, extraction, treatment and storage of mineral resources and the working of quarries, but does not include—
waste which is generated by the prospecting, extraction and treatment of mineral resources and the working of quarries, but which does not directly result from those operations;
waste resulting from the offshore prospecting, extraction and treatment of mineral resources; or
the injection of water and re‑injection of pumped groundwater as defined in the first and second indents of Article 11(3)(j) of Directive 2000/60/EC, to the extent authorised by that Article;
“extractive waste area” means any area designated for the accumulation or deposit of extractive waste, whether in a solid or liquid state or in solution or suspension, for the following time periods—
a period of six months or less for areas for hazardous waste generated unexpectedly;
a period of one year or less for areas for non-hazardous non-inert waste;
a period of three years or less for areas for unpolluted soil, non‑hazardous prospecting waste, waste resulting from the extraction, treatment and storage of peat and inert waste,
but does not include any area which falls within a waste facility; and an extractive waste area is deemed to include—
excavation voids into which waste is replaced, after excavation of the mineral, for rehabilitation and construction purposes,
any dam or other structure serving to contain, retain, confine or otherwise support such a facility, and
heaps and ponds;
“financial guarantee” means the guarantee required by regulation 15(1);
[F5“hazardous waste” is as defined in Articles 3(2) and 7 of Directive 2008/98/EC;]
“heap” means an engineered facility for the deposit of solid waste on the surface;
“inert waste” means waste that does not undergo any significant physical, chemical or biological transformations; inert waste will not dissolve, burn or otherwise physically or chemically react, biodegrade or adversely affect other matter with which it comes into contact in a way likely to give rise to environmental pollution or harm human health; the total leachability and pollutant content of the waste and the ecotoxicity of the leachate must be insignificant, and in particular not such as to endanger the quality of either surface water or groundwater or both;
“leachate” means any liquid percolating through the deposited waste and emitted from or contained within an extractive waste area or waste facility, including polluted drainage, which may adversely affect the environment if not appropriately treated;
“local authority” means a council constituted under section 2 of the Local Government etc. (Scotland) Act 1994(12);
“major accident” means an occurrence on-site in the course of an operation involving the management of extractive waste in any establishment covered by these Regulations, leading to a serious danger to human health or the environment or both, whether immediately or over time, on‑site or off‑site;
“mineral resource” or “mineral” means a naturally occurring deposit in the earth’s crust of an organic or inorganic substance, such as energy fuels, metal ores, industrial minerals and construction materials, but excluding water;
“offshore” means that area of the sea and seabed extending from the low water mark of ordinary or median tides outwards;
“operator” means the natural or legal person responsible for the management of extractive waste at a waste facility, including in respect of temporary storage of extractive waste as well as the operational and after‑closure phases, and where an extractive waste area or waste facility has not been put into operation, means the person who will have control over the operation of the extractive waste area or waste facility when it is put into operation;
“planning authority” means the local authority responsible for planning permission where an extractive waste area or waste facility is located;
“pond” means a natural or engineered facility for disposing of fine‑grained waste, normally tailings, along with varying amounts of free water, resulting from the treatment of mineral resources and from the clearing and recycling of process water;
“prospecting” means the search for mineral deposits of economic value, including sampling, bulk sampling, drilling and trenching, but excluding any works required for the development of such deposits, and any activities directly associated with an existing extractive operation, and “prospecting waste” means waste generated by such activity;
“the public” means one or more natural or legal persons and associations, organisations or groups made up of such persons;
“the public concerned” means the public affected or likely to be affected by, or having an interest in, the environmental decision‑making under Parts 4 or 6 and non‑governmental organisations promoting environmental protection and meeting any requirements under legislation are deemed to have such an interest;
“receiving body of water” means surface waters, groundwater, transitional waters and coastal water as defined in Article 2(1), (2), (6) and (7) of Directive 2000/60/EC;
“rehabilitation” means the treatment of the land affected by a waste facility in such a way as to restore the land to a satisfactory state, with particular regard to soil quality, wildlife, natural habitats, freshwater systems, landscape and appropriate beneficial uses;
“SEPA” means the Scottish Environment Protection Agency;
“site” means all land at a distinct geographic location under the management control of an operator;
“substantial change” means a change in the structure or operation of an extractive waste area or waste facility that, in the opinion of the planning authority, may have significant negative effects on human health or the environment;
“tailings” means the waste solids or slurries that remain after the treatment of minerals by separation processes (e.g. crushing, grinding, size‑sorting, flotation and other physico‑chemical techniques) to remove the valuable minerals from the less valuable rock;
“treatment”, except where the context otherwise requires, means the mechanical, physical, biological, thermal or chemical process or combination of processes carried out on mineral resources, including from the working of quarries, with a view to extracting the mineral, including size change, classification, separation and leaching, and the re‑processing of previously discarded waste, but excluding smelting, thermal manufacturing processes (other than the burning of limestone) and metallurgical processes;
“unpolluted soil” means soil that is removed from the upper layer of the ground during extractive activities and that is not deemed to be polluted under national or [F2EU] law;
[F6“waste” is as defined in Article 3(1) of Directive 2008/98/EC;]
“waste facility” means any area designated for the accumulation or deposit of extractive waste, whether in a solid or liquid state or in solution or suspension; Category A waste facilities and facilities for waste characterised as hazardous in the waste management plan shall be waste facilities regardless of the period of accumulation or deposit, but any other area shall not be a waste facility unless the accumulation or deposit will exceed the following time periods—
six months for facilities for hazardous waste generated unexpectedly;
one year for facilities for non‑hazardous non‑inert waste;
three years for facilities for unpolluted soil, non‑hazardous prospecting waste, waste resulting from the extraction, treatment and storage of peat and inert waste,
and such a facility is deemed to include any dam or other structure serving to contain, retain, confine or otherwise support such a facility, and is also deemed to include, but not be limited to, heaps and ponds, but does not include excavation voids into which waste is replaced, after extraction of the mineral, for rehabilitation and construction purposes;
“waste management plan” has the meaning given by regulation 11; and
“weak acid dissociable cyanide” means cyanide and cyanide compounds that are dissociated with a weak acid at a defined pH.
(2) Notwithstanding paragraph (1), expressions used in these Regulations and in Directive 2006/21/EC on the management of waste from extractive industries(13), unless the context otherwise requires, have the same meaning for the purposes of these Regulations as in that Directive.
(3) Where these Regulations refer to—
(a)an application, notification or request which may be made by any person; or
(b)an approval, decision, determination, notification, permission or opinion to be issued by the planning authority,
any such application, notification or request shall be made in writing and any such approval, decision, determination, notification, permission or opinion shall be issued in writing (and these requirements may be fulfilled by electronic communication where regulation 32 applies).
Textual Amendments
F1Words in reg. 2(1) substituted (27.3.2011) by The Waste (Scotland) Regulations 2011 (S.S.I. 2011/226), reg. 1(1), sch. para. 26(a)
F2Words in Regulations substituted (22.4.2011) by The Treaty of Lisbon (Changes in Terminology) Order 2011 (S.I. 2011/1043), arts. 2, 3-6
F3Words in reg. 2(1) omitted (27.3.2011) by virtue of The Waste (Scotland) Regulations 2011 (S.S.I. 2011/226), reg. 1(1), sch. para. 26(b)
F4Words in reg. 2(1) inserted (27.3.2011) by The Waste (Scotland) Regulations 2011 (S.S.I. 2011/226), reg. 1(1), sch. para. 26(c)
F5Words in reg. 2(1) substituted (27.3.2011) by The Waste (Scotland) Regulations 2011 (S.S.I. 2011/226), reg. 1(1), sch. para. 26(d)
F6Words in reg. 2(1) substituted (27.3.2011) by The Waste (Scotland) Regulations 2011 (S.S.I. 2011/226), reg. 1(1), sch. para. 26(e)
Commencement Information
3.—(1) In the Town and Country Planning (General Permitted Development) (Scotland) Order 1992(14)—
(a)in article 3(10)(d) (permitted development) omit “or Class 64 of Part 18”;
(b)in article 3(10)(e) omit “or Class 63 of Part 18” and sub-paragraph (iii);
(c)in Schedule 1, Part 15 (mineral exploration), Class 53, before sub-paragraph (2)(a) insert “(za) it is contrary to the requirements of the Management of Extractive Waste (Scotland) Regulations 2010;”;
(d)in Schedule 1, Part 15, Class 54, before sub-paragraph (2)(a) insert “(za) it is contrary to the requirements of the Management of Extractive Waste (Scotland) Regulations 2010;”, and
(e)in Schedule 1 omit Part 18 (waste tipping at a mine).
(2) In Part 2 of Schedule 4 to the Water Environment (Controlled Activities) (Scotland) Regulations 2005(15) (relevant legislation for determination of applications), at the end insert “The Management of Extractive Waste (Scotland) Regulations 2010 (S.S.I. 2010/60)”.
(3) In paragraph (2)(d) of Schedule 3 to the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2008(16) (classes of development), at the end insert “, including management of extractive waste”.
(4) In regulation 4 of the Landfill (Scotland) Regulations 2003(17) (cases where those Regulations do not apply), after paragraph (b) insert “(ba) waste which falls within the scope of the Management of Extractive Waste (Scotland) Regulations 2010;”.
Commencement Information
I3Reg. 3(1) in force at 1.5.2012, see reg. 1(2)
I4Reg. 3(2)-(4) in force at 1.4.2010, see reg. 1(1)
1997 c.8, to which there are amendments which are not relevant to these Regulations.
O.J. No. L 156, 25.6.2003, p.17.
O.J. No. L 10, 14.1.1997, p.13.
O.J. No. L 377, 31.12.1991, p.20; as amended by Council Directive 94/31/EC (O.J. No. L 168, 2.7.1994, p.28) and Corrigendum to Directive 91/689/EC (O.J. L 23, 30.1.1998, p.39).
O.J. No. L 196, 16.8.1967, p.1.
O.J. No. L 200, 30.7.1999, p.1.
O.J. No. L 196, 16.8.67, p.1.
O.J. No. L 129, 18.5.76, p..23.
O.J. No. L 20, 26.1.80, p.43 as amended by Council Directive 91/692/EC (O.J. No. L 377, 31.12.1991, p.48).
O.J. No. L 200, 30.7.99, p.1.
O.J. No. L 327, 22.12.2000, p.1 as amended by Directive 2008/105/EC of the European Parliament and of the Council (O.J. No. L 348, 24.12.2008, p.84).
O.J. No. L 102/15, 11.4.2006, p.15.
S.I. 1992/223; paragraph 10 was added by S.I. 1997/1871 article 3(a). There are other amendments which are not relevant to these Regulations.
S.S.I. 2005/348, which is relevantly amended by S.S.I. 2008/170, regulation 20 (the amendment is not fully in force).
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Mae Nodyn Gweithredol yn nodi datganiad byr o ddiben Offeryn Statudol yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.