- Deddfwriaeth Ddrafft
This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Renewable Heat Incentive Scheme (Amendment) Regulations 2014 No. 1413
10. For regulation 9 substitute—
9.—(1) This regulation applies if the plant is a CHP system which complies with the requirements in paragraphs (2) and (3).
(2) The requirements in this paragraph are that the CHP system generates heat and power from—
(a)one of the sources of energy set out in paragraph (5) alone, or
(b)solid biomass, solid biomass contained in waste or biogas, in combination with each other or with any other source of energy provided that—
(i)the combustion unit in which that solid biomass, solid biomass contained in waste or biogas is burned was first commissioned as part of a CHP system on or after 4th December 2013;
(ii)the combustion unit was new at the time of installation;
(iii)(except in relation to the use of solid biomass contaminated with fossil fuel) the combustion unit in which that solid biomass, solid biomass contained in waste or biogas is burned is a separate combustion unit from that in which any other fuel is burned.
(3) Where energy is supplied to the CHP system from a combustion unit in which solid biomass (excluding solid biomass contained in waste) is burned, the requirements in this paragraph are that—
(a)the combustion unit is specifically designed and installed to use solid biomass as its only primary fuel source, and
(b)where an application for accreditation relating to the combustion unit is made on or after the second relevant date, that combustion unit complies with the requirements in regulation 5(1)(d)(i) and (ii).
(4) The requirements in paragraph (2)(b)(i) and (ii) are deemed to be satisfied where the combustion unit was previously supplying energy for the generation of power only and the plant to which it supplies energy is first commissioned as a CHP system on or after 4th December 2013.
(5) The sources of energy referred to in paragraph (2)(a) are—
(a)solid biomass (excluding solid biomass contained in waste);
(b)solid biomass contained in waste;
(c)biogas, provided that the combustion unit in which the biogas is burned does not generate heat from solid biomass;
(d)deep geothermal energy.”.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Mae Memorandwm Esboniadol Drafft yn nodi datganiad byr o ddiben Offeryn Statudol Drafft ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Eu nod yw gwneud yr Offeryn Statudol Drafft yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd yn fanwl gerbron y Senedd o Fehefin 2004 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys