- Deddfwriaeth Ddrafft
This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Electricity and Gas (Energy Company Obligation) Order 2022 No. 875
12.—(1) The requirements referred to in article 11(2)(a) in relation to Condition A are that the measure—
(a)is installed at domestic premises;
(b)results in the reduction in the cost of heating those premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas, or in the case of a data light measure, is reasonably expected to result in such a reduction;
(c)is completed on or after 1st April 2022 and before 1st April 2026;
(d)except in the case of a repair, is installed at—
(i)premises erected before 1st April 2022; or
(ii)premises which were first occupied as domestic premises before the day on which the installation is completed;
(e)is not funded by any grant from public funds; and
(f)either—
(i)forms part of an ECO4 project which—
(aa)meets the requirement concerning the assessment of energy efficiency in paragraph (2); and
(bb)does not include an in-fill measure, ECO3 interim delivery action or surplus action; or
(ii)is an in-fill measure which meets the requirement concerning the assessment of energy efficiency in paragraph (3).
(2) An ECO4 project meets the requirement concerning the assessment of energy efficiency if—
(a)where the project is an ECO4 project which consists of a district heating connection only or a district heating connection and one or more novel data light measures only—
(i)a SAP assessment is performed before the day on which the first measure in the project is completed for the purpose of calculating the SAP rating of the premises; and
(ii)a pre-installation EPC is issued for the premises;
(b)where the project is an ECO4 project which consists of one or more novel data light measures only—
(i)an RdSAP assessment is performed before the day on which the first measure in the project is completed for the purpose of calculating the SAP rating of the premises; and
(ii)a pre-installation EPC is issued for the premises;
(c)where the project is an ECO4 project which does not fall within sub-paragraph (a) or (b), an RdSAP assessment is performed before the day on which the first measure in the project is completed for the purpose of calculating the SAP rating of the premises.
(3) An in-fill measure meets the requirement concerning the assessment of energy efficiency if—
(a)where the in-fill measure is a district heating connection—
(i)a SAP assessment is performed before the day on which the in-fill measure is completed for the purpose of calculating the SAP rating of the premises; and
(ii)a pre-installation EPC is issued for the premises;
(b)where the in-fill measure does not fall within sub-paragraph (a), an RdSAP assessment is performed before the day on which the in-fill measure is completed for the purpose of calculating the SAP rating of the premises.
(4) In paragraphs (2) and (3), references to a “district heating connection” do not include a connection to a district heating system that uses a shared ground loop.
(5) In this article, “grant from public funds” means a grant made by a public authority or by any person distributing funds on behalf of a public authority.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Mae Memorandwm Esboniadol Drafft yn nodi datganiad byr o ddiben Offeryn Statudol Drafft ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Eu nod yw gwneud yr Offeryn Statudol Drafft yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd yn fanwl gerbron y Senedd o Fehefin 2004 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys