Full project score: calculation

This adran has no associated Memorandwm Esboniadol

55.—(1) This article applies for the purpose of calculating the full project score to be given to an ECO4 project that meets the requirements of article 49.

(2) The full project score is the result of the following formula—

KP x (1+ F) x (C + OGR) + BH + ESH + IMP + BFR – L.

(3) In paragraph (2)—

“KP” is the determined cost savings for the ECO4 project;

“F” is—

(a)

0.2, where the floor area of the domestic premises is less than 73m2;

(b)

0.1, where the floor area of the premises is between 73m2 and 97m2 (both inclusive);

(c)

0, where the floor area of the premises is greater than 97m2;

“C” is—

(a)

1.1, where at least one qualifying action in the ECO4 project meets the condition in article 21 (measures accompanied by a declaration from a relevant authority or participant and Secretary of State approval);

(b)

otherwise, 1;

“OGR” is—

(a)

0.35, where the domestic premises are—

(i)

off-gas premises; and

(ii)

in a rural area in Scotland or Wales;

(b)

otherwise, 0;

“BH” is the amount determined in accordance with article 56 (addition to annual cost savings for projects including basic heating repair or replacement measures);

“ESH” is the amount determined in accordance with article 57 (addition to annual cost savings for projects including repairs and replacements of efficient electric storage heaters);

“IMP” is the “project innovation uplift” and is the amount determined in accordance with article 58 (addition to annual cost savings for projects that include certain innovation measures);

“BFR” is the “building fabric repair increase” and is the amount determined in accordance with article 61 (addition to annual cost savings for certain projects incurring building fabric repair expenditure);

“L” is—

(a)

the amount determined in accordance with article 64 (late completion penalty), where the ECO4 project consists of one or more qualifying actions which are not completed on time within the meaning of article 65(2);

(b)

otherwise, £0.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol Drafft

Mae Memorandwm Esboniadol Drafft yn nodi datganiad byr o ddiben Offeryn Statudol Drafft ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Eu nod yw gwneud yr Offeryn Statudol Drafft yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd yn fanwl gerbron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill