Chwilio Deddfwriaeth

The Electricity and Gas (Energy Company Obligation) Order 2022

Draft Legislation:

This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Electricity and Gas (Energy Company Obligation) Order 2022 No. 875

Time frame for completion of qualifying actions

This adran has no associated Memorandwm Esboniadol

65.—(1) This article applies for the purpose of determining whether a qualifying action in an ECO4 project is completed on time.

(2) A qualifying action in an ECO4 project is completed on time if—

(a)it is the only qualifying action in the ECO4 project; or

(b)where it is part of an ECO4 project which includes more than one qualifying action—

(i)it is the first qualifying action in the project to be completed;

(ii)it is completed on the same day as, or not more than three months after, the day on which the first qualifying action in the project is completed; or

(iii)following an application under paragraph (3) which has been accepted by the Administrator, it is completed within the period specified by the Administrator under paragraph (6)(a).

(3) A participant may apply to the Administrator in writing for an extension of time in which to complete a measure in an ECO4 project.

(4) An application under paragraph (3) must be made before the end of the five month period beginning with the day on which the first measure in the ECO4 project is completed.

(5) An application under paragraph (3) must include—

(a)details of why the participant is seeking an extension of time to complete the measure; and

(b)such other information relating to the measure or the ECO4 project as the Administrator may require.

(6) Following receipt of an application under paragraph (3), the Administrator must—

(a)accept the application and specify a period within which the measure must be completed, as it thinks fit, but ending not more than six months after the day on which the first qualifying action in the ECO4 project is completed; or

(b)reject the application.

(7) In relation to an ECO4 project which includes an ECO4 eligible measure which is the installation of a district heating connection—

(a)the reference to “three months” in paragraph (2)(b)(ii) is to be read as a reference to “six months”;

(b)the reference to “five month period” in paragraph (4) is to be read as a reference to “eight month period”; and

(c)the reference to “six months” in paragraph (6)(a) is to be read as a reference to “nine months”.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol Drafft

Mae Memorandwm Esboniadol Drafft yn nodi datganiad byr o ddiben Offeryn Statudol Drafft ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Eu nod yw gwneud yr Offeryn Statudol Drafft yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd yn fanwl gerbron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill