- Deddfwriaeth Ddrafft
This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Public Charge Point Regulations 2023 No. 1168
5.—(1) For a new public charge point with a power of 8 kilowatts or above, a charge point operator must, within one year from the date on which these Regulations come into force, ensure that a person using that charge point is able to pay by contactless payment to charge an electric vehicle.
(2) For a rapid charge point in operation before the date on which these Regulations come into force, a charge point operator must, within one year from the date on which these Regulations come into force, ensure that a person using that charge point is able to pay by contactless payment to charge an electric vehicle.
(3) Where an existing charge point becomes a public charge point after the coming into force of these Regulations, a charge point operator must, within one year from the date on which the charge point becomes a public charge point, ensure that a person using that charge point is able to pay by contactless payment to charge an electric vehicle.
(4) In this regulation—
(a)“contactless payment” means a payment made at a contactless payment terminal using the contactless payment facility of a payment card that does not require the payer to have entered into a pre-existing contract with the charge point operator;
(b)“existing charge point” means a charge point with a power of 8 kilowatts or above in operation before these Regulations come into force;
(c)“new public charge point” means a public charge point installed after the coming into force of these Regulations.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Mae Memorandwm Esboniadol Drafft yn nodi datganiad byr o ddiben Offeryn Statudol Drafft ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Eu nod yw gwneud yr Offeryn Statudol Drafft yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd yn fanwl gerbron y Senedd o Fehefin 2004 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys