- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y'i Deddfwyd)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
Section 4.
In the city of Westminster
Work No. 4 A passenger subway commencing by a junction with an existing subway serving the Piccadilly Line station/platform concourse beneath a point 27 metres south-east of the junction of Dover Street with Piccadilly and terminating by a junction with a cross-passage serving the Jubilee Line platform concourse beneath a point 37 metres south-east of the south-eastern end of Arlington Street.
Work No. 4a A passenger subway commencing by a junction with a cross-passage serving the Jubilee Line station platform concourse beneath a point 36 metres south of the south-eastern end of Arlington Street and terminating by a junction with Work No. 4 beneath a point 34 metres south of that end of Arlington Street.
Work No. 4b A shaft, incorporating a lift, with connecting subways commencing by a junction with a cross-passage serving the Jubilee Line station/platform concourse beneath a point 28 metres south of the south-eastern end of Arlington Street and terminating by a junction with Work No. 4 beneath a point 25 metres south of that end of Arlington Street.
Work No. 4c A subway including an emergency escape shaft commencing by a junction with Work No. 4 beneath a point 48 metres south-east of the junction of Bennett Street with Arlington Street and terminating by a junction with Work No. 4 beneath a point 65 metres south-east of that road junction.
Work No. 5 A passenger subway commencing by a junction with a cross-passage serving the Piccadilly Line station concourse beneath a point 31 metres south-west of the junction of Dover Street with Piccadilly and terminating by a junction with an existing subway serving the Piccadilly Line station/platform concourse beneath a point 32 metres south of that road junction.
Work No. 5a A shaft, incorporating a lift, with connecting subways commencing by a junction with a cross-passage serving the Piccadilly Line station concourse commencing beneath a point 19 metres south-west of the junction of Dover Street with Piccadilly and terminating by a junction with Work No. 5 beneath a point 25 metres south-west of that road junction.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys