Reservoirs Act 1975, Section 10 is up to date with all changes known to be in force on or before 17 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

[F110 Periodical inspection of large raised reservoirs. E+W+S

(1)The undertakers shall have any [F2high-risk reservoir] inspected from time to time by an independent qualified civil engineer (“the inspecting engineer”) and obtain from him a report of the result of his inspection.

(2)Unless it is at the time under the supervision of a construction engineer (or of an engineer acting under section 8 or 9 above) a [F3high-risk reservoir must be inspected under this section at the times specified by regulations made by the Minister.]

(3)As soon as practicable after an inspection under this section, the inspecting engineer shall make a report of the result of the inspection, including in it any recommendations he sees fit to make as to—

[F4(a)the time of the next inspection;

(b)the maintenance of the reservoir;

(c)any measures required in the interests of safety and the period within which those measures must be taken.]

[F5(3A)If the inspecting engineer has not provided a report before the end of the period of 6 months beginning with the date of completion of the inspection, the engineer must—

(a)notify [F6the appropriate agency], and

(b)provide a written statement of the reasons.]

(4)An inspecting engineer shall consider the matters (if any) that need to be watched by the supervising engineer during the period before the next inspection of the reservoir under this section, and shall include in his report a note of any such matters.

(5)An inspecting engineer, when he makes his report, shall also give a certificate stating that the report does or does not include recommendations as to measures to be taken in the interests of safety [F7or as to the maintenance of the reservoir], if it includes a recommendation as to the time of the next inspection, stating also the period within which he recommends the inspection should be made.

[F8(5A)The undertaker must comply with a recommendation made under subsection (3)(b), unless the recommendation is the subject of a reference under section 19 and the reference has not been determined.]

(6)Where an inspecting engineer includes in his report any recommendation as to measures to be taken in the interests of safety, then subject to any reference of the matter to a referee in accordance with this Act the undertakers shall [F9, within the period specified in the report,] carry the recommendation into effect under the supervision of a qualified civil engineer; and that engineer shall give a certificate, as soon as he is satisfied it is so, that the recommendation has been carried into effect.

[F10(6A)The inspecting engineer must include in the report of the inspection—

(a)a statement as to whether all of the safety measures recommended in the previous report under subsection (3)(c) have been taken, and

(b)either (i) recommendations to take any safety measure that has not yet been taken or (ii) an explanation of why it is no longer required.]

(7)Where it appears to the enforcement authority, in the case of any [F11high-risk reservoir]

(a)that an inspection and report thereon have not been made as required by this section; or

(b)that the latest report of the inspecting engineer includes a recommendation as to measures to be taken in the interests of safety that has not been carried into effect as so required;

the authority may by written notice served on the undertakers require them within twenty-eight days after the date when the notice is served to appoint an independent qualified civil engineer to carry out an inspection under this section, unless an appointment has already been made, and (in either case) to notify the authority of the appointment or, as the case may be, require them to carry the recommendation into effect within a time specified in the notice.

(8)Where an enforcement authority propose to serve a notice under subsection (7) above requiring the undertakers to carry a recommendation into effect, the authority shall consult as to the time to be specified in the notice a civil engineer, being a qualified civil engineer for the purpose of supervising under subsection (6) above the carrying into effect of the recommendation.

(9)For purposes of this Act “independent” when used of a civil engineer in relation to a reservoir means—

(a)that he is not in the employment of the undertakers otherwise than in a consultant capacity; and

(b)that he was not the engineer responsible for the reservoir or any [F12alteration] to it as construction engineer, nor is connected with any such engineer as his partner, employer, employee or fellow employee in a civil engineering business.

The reference in this subsection to a construction engineer includes an engineer acting under section 8 or 9 above.]

Textual Amendments

F2Words in s. 10(1) substituted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(2) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F3Words in s. 10(2) substituted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(3) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F4S. 10(3)(a)-(c) substituted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(4) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F5S. 10(3A) inserted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(5) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F6Words in s. 10(3A) substituted by 2010 c. 29 Sch. 4 para. 12(5) (as amended (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 468(2)(b) (with Sch. 7))

F7Words in s. 10(5) inserted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(6) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F8S. 10(5A) inserted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(7) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F9Words in s. 10(6) substituted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(8) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F10S. 10(6A) inserted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(9) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F11Words in s. 10(7) substituted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. for specified purposes, otherwise on "the applicable day" for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 12(10) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, arts. 2(c), 3

F12Word in s. 10(9)(b) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(10) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

Modifications etc. (not altering text)

C1Ss. 6–10 modified by S.I. 1986/466, art. 2(2), Sch. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill