Changes to legislation:

Reservoirs Act 1975, Section 7 is up to date with all changes known to be in force on or before 16 August 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

Whole provisions yet to be inserted into this Act (including any effects on those provisions):

[F17 Certificates of construction engineers. E+W+S

(1)As soon as the construction engineer responsible for any reservoir or [F2alteration] to a reservoir considers that the construction of the reservoir or [F2alteration] has reached a stage at which the reservoir F3... can properly be filled wholly or partially with water, he shall give a certificate (“the preliminary certificate”) specifying the level up to which it may be filled and the conditions (if any) subject to which it may be so filled; and the construction engineer may from time to time supersede a preliminary certificate by the issue of a further preliminary certificate varying the previous certificate, whether as to water level or as to conditions.

(2)Where the construction engineer responsible for an [F4alteration] to a large raised reservoir considers at any time during the carrying out of the alteration to the reservoir that the reservoir ought not to be filled with water up to the level or subject to the conditions that would be lawful apart from this subsection, he may give a certificate (“an interim certificate”) specifying the level up to which it may be filled until the issue of a preliminary certificate, and the conditions (if any) subject to which it may be so filled; and the construction engineer may from time to time supersede an interim certificate by the issue of a further interim certificate varying the previous certificate, whether as to water level or as to conditions.

(3)If, at the end of three years after a preliminary certificate is first issued for a reservoir or [F5alteration] to a reservoir or at any time thereafter, the construction engineer is satisfied that the reservoir F6... is sound and satisfactory and may safely be used for the storage of water, he shall give a certificate (“the final certificate”) to that effect, and the final certificate shall specify the level up to which water may be stored and the conditions (if any) subject to which it may be so stored.

(4)If at the end of five years after a preliminary certificate is first issued for a reservoir or [F7alteration] to a reservoir the construction engineer has not issued his final certificate, he shall give the undertakers a written explanation of his reasons for deferring the issue of the final certificate.

(5)The construction engineer giving a final certificate for a reservoir [F8which is designated, or in the opinion of the engineer is likely to be designated, as a high-risk reservoir] shall consider the matters (if any) that need to be watched by a supervising engineer during the period before there is an inspection of the reservoir under this Act, and shall include in an annex to the certificate a note of any such matters.

(6)The construction engineer for any reservoir or [F9alteration] to a reservoir shall also, as soon as practicable after the completion of the works and in any event not later than the giving of the final certificate, give a certificate that the works have been efficiently executed in accordance with the drawings and descriptions annexed to the certificate, and shall annex to the certificate detailed drawings and descriptions giving full information of the works actually constructed, including dimensions and levels and details of the geological strata or deposits encountered in trail holes or excavations made in connection with the works.

(7)References in this Act to a final certificate or to a certificate under subsection (6) above include the annex to the certificate, where there is one.]

Textual Amendments

F2Word in s. 7(1) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(1)(a) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F3Words in s. 7(1) omitted (30.7.2013 for E., 1.4.2016 for W.) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(1)(b) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F4Word in s. 7(2) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(2) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F5Word in s. 7(3) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(3)(a) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F6Words in s. 7(3) omitted (30.7.2013 for E., 1.4.2016 for W.) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(3)(b) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F7Word in s. 7(4) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(4) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F8Words in s. 7(5) inserted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 8 (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F9Word in s. 7(6) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(4) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

Modifications etc. (not altering text)

C1Ss. 6–10 modified by S.I. 1986/466, art. 2(2), Sch. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill