Chwilio Deddfwriaeth

Water Industry Act 1991

Changes over time for: Cross Heading: Powers to discharge water

 Help about opening options

Version Superseded: 30/11/2017

Status:

Point in time view as at 29/03/2017.

Changes to legislation:

Water Industry Act 1991, Cross Heading: Powers to discharge water is up to date with all changes known to be in force on or before 28 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

Powers to discharge waterE+W

165 Discharges for works purposes.E+W

(1)Subject to the following provisions of this section and to section 166 below, where any water undertaker—

(a)is exercising or about to exercise any power conferred by section 158, 159, 161 or 163 above (other than the power conferred by section 161(3) above); or

(b)is carrying out, or is about to carry out, the construction, alteration, repair, cleaning, or examination of any reservoir, well, borehole, or other work belonging to or used by that undertaker for the purposes of, or in connection with, the carrying out of any of its functions,

the undertaker may cause the water in any relevant pipe or in any such reservoir, well, borehole or other work to be discharged into any available watercourse.

(2)Nothing in this section shall authorise any discharge which—

(a)damages or injuriously affects the works or property of any railway undertakers or navigation authority; or

(b)floods or damages any highway.

(3)If any water undertaker fails to take all necessary steps to secure that any water discharged by it under this section is as free as may be reasonably practicable from—

(a)mud and silt;

(b)solid, polluting, offensive or injurious substances; and

(c)any substances prejudicial to fish or spawn, or to spawning beds or food of fish,

the undertaker shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.

(4)In this section “relevant pipe” means any water main (including a trunk main), resource main, discharge pipe or service pipe.

Modifications etc. (not altering text)

C1S. 165 restricted (1.4.1996) by 1980 c. 66, s. 100(6B)(b) (as inserted (1.4.1996) by 1994 c. 19, s. 22(1), Sch. 7 Pt. I para. 9 (with ss. 54(5)(7), 55(5)); S.I. 1996/396, art. 3, Sch. 1)

166 Consents for certain discharges under section 165.E+W

(1)Except in an emergency, no discharge through any pipe the diameter of which exceeds two hundred and twenty-nine millimetres shall be made under section 165 above except with the consent of [F1the appropriate agency] and of any navigation authority which carries out functions in relation to—

(a)the part of the watercourse where the discharge is made; or

(b)any part of that watercourse which is less than three miles downstream from the place of the discharge.

(2)Where a water undertaker makes an application to any authority for a consent for the purposes of this section—

(a)that application shall be accompanied or supplemented by all such information as that authority may reasonably require; and

(b)the undertaker shall serve a copy of the application, and of any consent given on that application, on every person who—

(i)is registered with the undertaker in respect of any premises which are within three miles of the place where the discharge to which the application relates is proposed to be made and are not upstream from that place; and

(ii)has not agreed in writing that he need not be served with such a copy;

but, subject to subsection (4) below and without prejudice to the effect (if any) of any other contravention of the requirements of this section in relation to such an application, a failure to provide information in pursuance of the obligation to supplement such an application shall not invalidate the application.

(3)Subject to subsection (4) below, an application for a consent for the purposes of this section shall be determined—

(a)in the case of an application with respect to a particular discharge, before the end of the period of seven days beginning with the day after the application is made; and

(b)in any other case, before the end of the period of three months beginning with that day;

and, subject to that subsection, where an application for any consent is required to be determined within the period specified in paragraph (a) above and is not so determined, the consent applied for shall be deemed to have been given unconditionally.

(4)Where—

(a)an undertaker which has made an application to any authority for a consent for the purposes of this section has failed to comply with its obligation under subsection (2)(a) above to supplement that application with information required by that authority; and

(b)that requirement was made by that authority at such a time before the end of the period within which that authority is required to determine the application as gave the undertaker a reasonable opportunity to provide the required information within that period,

that authority may delay his determination of the application until a reasonable time after the required information is provided.

(5)A consent for the purposes of this section may relate to a particular discharge or to discharges of a particular description and may be made subject to such reasonable conditions as may be specified by the person giving it; but a consent for those purposes shall not be unreasonably withheld.

(6)Any dispute as to whether a consent for the purposes of this section should be given or withheld, or as to whether the conditions to which any such consent is made subject are reasonable, shall be referred to the arbitration of a single arbitrator appointed by agreement between the parties to the dispute or, in default of agreement, by the President of the Institution of Civil Engineers.

(7)Where any discharge under section 165 above is made in an emergency without the consent which, if there were no emergency, would be required by virtue of this section, the undertaker which made the discharge shall, as soon as practicable after making the discharge, serve a notice which—

(a)states that the discharge has been made; and

(b)gives such particulars of the discharge and of the emergency as the persons served with the notice might reasonably require,

on every person on whom that undertaker would have been required to serve the application for that consent or any copy of that application.

(8)If any water undertaker contravenes, without reasonable excuse, any of the requirements of this section or any condition of a consent given for the purposes of this section, it shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.

(9)Nothing in this section shall require any consent to be obtained, or any notice to be served, in respect of any discharge if the requirements of section 34 of the M1Water Act 1945 (temporary discharges into watercourses) in relation to that discharge had been satisfied before 1st September 1989.

[F2(10)In this section “the appropriate agency” means—

(a)the Environment Agency, in relation to discharges of water in England;

(b)the NRBW, in relation to discharges of water in Wales.]

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan

Y Ddeddf Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan heb Atodlenni

Y Ddeddf Gyfan heb Atodlenni you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill