Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Rights to abstract or impoundE+W

26 Rights of navigation, harbour and conservancy authorities.E+W

(1)The restriction on abstraction shall not apply to any transfer of water from one area of inland waters to another in the course of, or resulting from, any operations carried out by a navigation authority, harbour authority or conservancy authority in the carrying out of their functions as such an authority.

(2)The restriction on impounding works shall not apply to the construction or alteration of impounding works in the course of the performance by a navigation authority, harbour authority or conservancy authority of their functions as such an authority.

[F127 Rights to abstract small quantities.E+W

(1)The restriction on abstraction shall not apply to any abstraction of a quantity of water not exceeding twenty cubic metres in any period of twenty-four hours, if the abstraction does not form part of a continuous operation, or of a series of operations, by which a quantity of water which, in aggregate, is more than twenty cubic metres is abstracted during the period.

(2)In the case of any abstraction of water from underground strata which falls within subsection (1) above, the restriction imposed by section 24(2) above shall not apply—

(a)to the construction or extension of any well, borehole or other work; or

(b)to the installation or modification of machinery or other apparatus,

if the well, borehole or other work is constructed or extended, or the machinery or apparatus is installed or modified, for the purpose of abstracting the water.

(3)Where a person is authorised by a licence under this Chapter to carry on a particular abstraction operation (or series of operations), this section does not permit him to carry it on beyond the authorisation conferred by the licence.

Textual Amendments

F1Ss 27, 27A substituted (1.4.2004 for the insertion of s. 27A, 1.4.2005 in so far as not already in force) for s. 27 by Water Act 2003 (c. 37), ss. 6(1), 105(3); S.I. 2004/641, art. 3(a) (with Sch. 3 paras. 1 7); S.I. 2005/968, art. 2(a)

27AVariation of small quantity thresholdE+W

(1)The Secretary of State may by order made by statutory instrument provide that section 27(1) above is to have effect in relation to—

(a)a geographical area; or

(b)a class of inland waters; or

(c)a class of underground strata; or

(d)a class of inland waters or of underground strata within a geographical area,

(in each case as specified in the order) as if for “twenty cubic metres” there were substituted another quantity specified in the order.

(2)The Secretary of State shall not make such an order except upon the application of the Agency; but he may direct the Agency to make such an application.

(3)Such an order may—

(a)make different provision in relation to the different paragraphs in subsection (1) above; and

(b)make different provision for different areas, waters or underground strata.

(4)Schedule 6 to this Act shall have effect with respect to applications for orders under subsection (1) above and with respect to the making of such orders.

(5)An order under subsection (1) above which specifies a greater quantity than the one which previously had effect in relation to the area, waters or strata in question may make provision for a licence to abstract water granted under this Chapter—

(a)which is for the time being in force; but

(b)which by virtue of the order has become wholly or partly unnecessary,

to cease to have effect, or to cease to have effect to the extent specified in the order.

(6)An order under subsection (1) above may include provision for or in relation to the payment by the Agency of compensation, in cases specified in the order, to a person who—

(a)immediately before the making of an order under subsection (1) above, had been in a position to carry out an abstraction to which, by virtue of section 27(1) above, the restriction on abstraction did not apply;

(b)following the making of that order, requires a licence under this Chapter in order to carry out that abstraction; and

(c)has suffered loss or damage as a result of his having been—

(i)refused such a licence in respect of that abstraction; or

(ii)granted such a licence, but in respect of an abstraction of more limited extent than the one he had been in a position to carry out.

(7)Paragraphs (e) and (f) of section 219(2) below apply in relation to orders under subsection (1) above as they apply to regulations made under this Act.

(8)A statutory instrument containing an order under subsection (1) above shall be subject to annulment in pursuance of a resolution of either House of Parliament.]

Textual Amendments

F1Ss 27, 27A substituted (1.4.2004 for the insertion of s. 27A, 1.4.2005 in so far as not already in force) for s. 27 by Water Act 2003 (c. 37), ss. 6(1), 105(3); S.I. 2004/641, art. 3(a) (with Sch. 3 paras. 1 7); S.I. 2005/968, art. 2(a)

28 Curtailment of rights under section 27.E+W

[F2(1)The provisions of this section shall have effect where a person (“the occupier") is entitled, by virtue of subsection (6) of section 27 above, to a protected right for the purposes of this Chapter by reason of his being the occupier of such a holding as is mentioned in subsection (4) of that section in relation to an abstraction falling within that subsection (“the holding").

(2)If it appears to the [F3Agency] that the occupier is entitled, as against other occupiers of land contiguous to the inland waters in question, to abstract water from those waters for use on part of the holding (“the relevant part"), but is not so entitled to abstract water for use on other parts of the holding—

(a)the [F3Agency] may serve on him a notice specifying the relevant part of the holding; and

(b)subject to the following provisions of this section, the notice shall have effect so as to require subsections (3) and (4) of section 27 above to be construed in relation to the holding as if the references in subsection (4) to use on the holding were references to use on the part of the holding specified in the notice.

(3)Where a notice is served under subsection (2) above and the occupier objects to the notice on the grounds—

(a)that he is entitled, as against other occupiers of land contiguous to the inland waters in question, to abstract water from those waters for use on every part of the holding; or

(b)that he is so entitled to abstract water for use on a larger part of the holding than that specified in the notice,

he may, within such period (not being less than twenty-eight days from the date of service of the notice) and in such manner as may be prescribed, appeal to the court against the notice.

(4)On any appeal under subsection (3) above, the court shall determine the matter in dispute and, in accordance with its decision, confirm, quash or vary the [F3Agency’s] notice and—

(a)where the court quashes a notice served under subsection (2) above, paragraph (b) of that subsection shall not have effect; and

(b)where the court varies such a notice, that paragraph shall have effect, but with the substitution, for the reference to the part of the holding specified in the notice, of a reference to the part specified in the notice as varied by the court.

(5)In this section—

  • the court” means the county court for the district in which the holding, or the part of the holding which is contiguous to the inland waters in question, is situated; and

  • entitled” (except in subsection (1) above) means entitled apart from this Chapter or any other statutory provision.]

Textual Amendments

F3Words in s. 28 substituted (subject to other provisions of the amending Act) (1.4.1996) by 1995 c. 25, s. 120, Sch. 22 para. 128 (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3

29 Rights to abstract for drainage purposes etc.E+W

(1)The restriction on abstraction shall not apply to any abstraction of water from a source of supply in the course of, or resulting from, any operations for purposes of land drainage.

(2)The restriction on abstraction shall not apply to any abstraction of water from a source of supply in so far as the abstraction (where it does not fall within subsection (1) above) is necessary—

(a)to prevent interference with any mining, quarrying, engineering, building or other operations (whether underground or on the surface); or

(b)to prevent damage to works resulting from any such operations.

(3)Where—

(a)water is abstracted, in the course of any such operations as are mentioned in subsection (2) above, from any excavation into underground strata in a case in which the level of water in the underground strata depends wholly or mainly on water entering it from those strata; and

(b)the abstraction is necessary as mentioned in that subsection,

the exemption conferred by that subsection shall apply notwithstanding that the water is used for the purposes of the operations.

(4)In the case of any abstraction of water from underground strata which falls within subsection (1) or (2) above, the restriction imposed by section 24(2) above shall not apply—

(a)to the construction or extension of any well, borehole or other work; or

(b)to the installation or modification of machinery or other apparatus,

if the well, borehole or other work is constructed or extended, or the machinery or apparatus is installed or modified, for the purpose of abstracting the water.

(5)In this section, “land drainage” includes the protection of land against erosion or encroachment by water, whether from inland waters or from the sea, and also includes warping and irrigation other than spray irrigation.

30 Notices with respect to borings not requiring licences.E+W

(1)Where any person—

(a)proposes to construct a well, borehole or other work which is to be used solely for the purpose of abstracting, to the extent necessary to prevent interference with the carrying out or operation of any underground works, water contained in underground strata; or

(b)proposes to extend any such well, borehole or other work,

he shall, before he begins to construct or extend the work, give to the [F4Agency] a notice of his intention in the prescribed form.

(2)Where a notice under subsection (1) above is given to the [F4Agency] by any person, the [F4Agency] may (subject to section 31 below) by notice to that person require him, in connection with the construction, extension or use of the work to which that person’s notice relates, to take such reasonable measures for conserving water as are specified in the notice.

(3)The measures that may be specified in a notice under subsection (2) above shall be measures which, in the opinion of the [F4Agency], will not interfere with the protection of the underground works in question.

(4)Any person who contravenes subsection (1) above or fails to comply with a notice under subsection (2) above shall be guilty of an offence and liable—

(a)on summary conviction, to a fine not exceeding the statutory maximum;

(b)on conviction on indictment, to a fine.

Textual Amendments

F4Words in s. 30 substituted (subject to other provisions of the amending Act) (1.4.1996) by 1995 c. 25, s. 120, Sch. 22 para. 128, (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3

Modifications etc. (not altering text)

C1S. 30 restricted (18.12.1996) by 1996 c. 61, s. 52, Sch. 15 Pt. III para. 11

31 Appeals against conservation notices under section 30.E+W

(1)The person on whom a notice under section 30(2) above (“a conservation notice") is served may, by notice to the Secretary of State, appeal to him against the conservation notice on either or both of the following grounds, that is to say—

(a)that the measures required by the conservation notice are not reasonable;

(b)that those measures would interfere with the protection of the underground works in question.

(2)Any notice of appeal against a conservation notice shall be served within such period (not being less than twenty-eight days from the date of service of the conservation notice) and in such manner as may be prescribed.

(3)Before determining an appeal against a conservation notice, the Secretary of State may, if he thinks fit-

(a)cause a local inquiry to be held; or

(b)afford to the appellant and the [F5Agen cy] an opportunity of appearing before, and being heard by, a person appointed by the Secretary of State for the purpose;

and the Secretary of State shall act as mentioned in paragraph (a) or (b) above if a request is made by the appellant or the [F5Agency] to be heard with respect to the appeal.

(4)On an appeal against a conservation notice the Secretary of State may confirm, quash or vary the notice as he may consider appropriate.

(5)The decision of the Secretary of State on any appeal against a conservation notice shall be final.

(6)The Secretary of State may by regulations make provision as to the manner in which appeals against conservation notices are to be dealt with, including provision requiring the giving of notices of, and information relating to, the making of such appeals or decisions on any such appeals.

Textual Amendments

F5Words in s. 31 substituted (subject to other provisions of the amending Act) (1.4.1996) by 1995 c. 25, s. 120, Sch. 22 para. 128 (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3

32 Miscellaneous rights to abstract.E+W

(1)The restriction on abstraction shall not apply to any abstraction by machinery or apparatus installed on a vessel, where the water is abstracted for use on that, or any other, vessel.

(2)The restriction on abstraction and the other restrictions imposed by section 24 above shall not apply to the doing of anything—

(a)for [F6extinguishing fires or protecting life and property in the event of fire] ; or

(b)for the purpose of testing apparatus used for [F7either of ] those purposes or of training or practice in the use of such apparatus.

(3)The restriction on abstraction and the other restrictions imposed by section 24 above shall not apply—

(a)to any abstraction of water;

(b)to the construction or extension of any well, borehole or other work; or

(c)to the installation or modification of machinery or other apparatus,

if the abstraction, construction, extension, installation or modification is for any of the purposes specified in subsection (4) below and takes place with the consent of the [F8Agency] and in compliance with any conditions imposed by the [F8Agency].

(4)The purposes mentioned in subsection (3) above are—

(a)the purpose of ascertaining the presence of water in any underground strata or the quality or quantity of any such water; and

(b)the purpose of ascertaining the effect of abstracting water from the well, borehole or other work in question on the abstraction of water from, or the level of water in, any other well, borehole or other work or any inland waters.

Textual Amendments

F6Words in s. 32(2)(a) substituted (1.10.2004 except in relation to W., 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), s. 61, Sch. 1 para. 79(a); S.I. 2004/2304, art. 2; S.I. 2004/2917, art. 2

F7Words in s. 32(2)(b) inserted (1.10.2004 except in relation to W., 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), s. 61, Sch. 1 para. 79(b); S.I. 2004/2304, art. 2; S.I. 2004/2917, art. 2

F8Words in s. 32 substituted (subject to other provisions of the amending Act) (1.4.1996) by 1995 c. 25, s. 120, Sch. 22 para. 128 (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3

F933 Power to provide for further rights to abstract.E+W

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

F9S. 33 repealed with a saving (1.4.2004) by Water Act 2003 (c. 37), ss. 10(11), 105(3), Sch. 9 Pt. 1; S.I. 2004/641, art. 3(c)(z)

[F1033APower to provide for further exemptionsE+W

(1)The Secretary of State may make regulations providing for further cases in which—

(a)the restriction on abstraction (and, in the case of abstractions from underground strata, the other restrictions imposed by section 24 above); or

(b)the restriction on impounding works,

shall not apply; and in this section such a case is referred to as an “exemption”.

(2)The regulations may, in particular, make provision, in relation to an exemption—

(a)for the exemption to apply only for a prescribed period;

(b)for the exemption not to apply unless prescribed conditions are satisfied, or continue to be satisfied;

(c)for the Agency to be notified, or its consent obtained—

(i)before any particular abstraction operation or series of such operations begins; or

(ii)in connection with such an operation or series of operations relating to the abstraction of water in underground strata, before any other thing which is mentioned in section 24(2) above is done; or

(iii)before any impounding works are constructed or altered,

in reliance on the exemption.

(3)The regulations may provide for an exemption to apply generally or to relate to—

(a)a prescribed geographical area;

(b)a prescribed source of supply (in the case of an exemption from the restriction on abstraction or the other restrictions imposed by section 24 above); or

(c)prescribed inland waters (in the case of an exemption from the restriction on impounding works).

(4)Subject to subsection (5) below, if regulations under this section provide for an exemption falling within subsection (1)(a) above, the regulations shall—

(a)if appropriate, make provision for the exemption not to permit a person who is authorised by a licence under this Chapter to carry on an abstraction operation (or series of operations) to carry it on beyond the authorisation conferred by the licence; and

(b)make provision as to whether or not, in relation to any abstraction, the exemption provided for by the regulations is to be counted cumulatively with any other exemption which a person has by virtue of this section or section 27 above.

(5)The regulations may make provision for a licence granted under this Chapter and which is for the time being in force to cease to have effect, or to cease to have effect to the extent specified in the regulations, if it authorises an activity which falls to any extent within the exemption provided for by the regulations.]

Textual Amendments

Yn ôl i’r brig

Options/Cymorth

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan

Y Ddeddf Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan heb Atodlenni

Y Ddeddf Gyfan heb Atodlenni you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill