Town and Country Planning (Scotland) Act 1997, Chapter I is up to date with all changes known to be in force on or before 30 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

Chapter IS Trees

General duty of planning authorities as respects treesS

159 Planning permission to include appropriate provision for preservation and planting of trees.S

It shall be the duty of the planning authority—

(a)to ensure, whenever it is appropriate, that in granting planning permission for any development adequate provision is made, by the imposition of conditions, for the preservation or planting of trees, and

(b)to make such orders under section 160 as appear to the authority to be necessary in connection with the grant of such permission, whether for giving effect to such conditions or otherwise[F1, and

(c)of the planning authority from time to time to review any order made in exercise of their powers under that section and to consider whether it is requisite to vary or revoke the order in question.]

Textual Amendments

Modifications etc. (not altering text)

Tree preservation ordersS

160 Power to make tree preservation orders.S

[F2(1)A planning authority may, if it appears to them that the requirements of subsection (1A) are met, make an order specifying any trees, groups of trees or woodlands in their district and providing for their preservation.

(1A)Those requirements are (either or both)—

(a)that it is expedient in the interests of amenity to make that provision,

(b)that the trees, groups of trees or woodlands are of cultural or historical significance.]

(2)An order under subsection (1) is in this Act referred to as a “tree preservation order”.

(3)A tree preservation order may, in particular, make provision—

(a)for prohibiting (subject to any exemptions for which provision may be made by the order) the cutting down, topping, lopping, uprooting, wilful damage or wilful destruction of trees except with the consent of the planning authority, and for enabling that authority to give their consent subject to conditions;

(b)for securing the replanting, in such manner as may be prescribed by or under the order, of any part of a woodland area which is felled in the course of forestry operations permitted by or under the order;

(c)for applying, in relation to any consent under the order, and to applications for such consent, any of the provisions of this Act mentioned in subsection (4), subject to such adaptations and modifications as may be specified in the order.

(4)The provisions referred to in subsection (3)(c) are—

(a)the provisions of Part III relating to planning permission and to applications for planning permission, except sections 32, 34, 35, 36(2) and (3), 38, 58 to 62, 69 and 70 and Schedules 6 and 7, and section 65 of the M1Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997,

(b)sections 88 to 92, 94 and 95 (except so far as they relate to purchase notices served in consequence of such orders as are mentioned in section 88(1)(b) or (c)), and

(c)section 263.

(5)A tree preservation order may be made so as to apply, in relation to trees to be planted pursuant to any such conditions as are mentioned in section 159(a), as from the time when those trees are planted.

(6)Without prejudice to any other exemptions for which provision may be made by a tree preservation order, nothing in such an order shall prohibit the uprooting, felling or lopping of trees if—

(a)it is urgently necessary in the interests of safety,

(b)it is necessary for the prevention or abatement of a nuisance, or

[F3(ba)it is authorised by an order granting development consent,]

(c)it is in compliance with any obligation imposed by or under an Act of Parliament[F4or an Act of the Scottish Parliament],

so long asF5... notice in writing of the proposed operations is given to the planning authority as soon as practicable after the operations become necessary.

(7)This section shall have effect subject to—

(a)section 39(2) of the M2Housing and Planning Act 1986 (saving for effect of section 2(4) of the M3Opencast Coal Act 1958 on land affected by a tree preservation order despite its repeal), and

(b)section 15 of the M4Forestry Act 1967 (licences under that Act to fell trees comprised in a tree preservation order).

[F6(8)In relation to an application for consent under a tree preservation order the Scottish Ministers may by regulations make provision as to—

(a)the form and manner in which the application must be made,

(b)particulars of such matters as are to be included in the application,

(c)any documents or other materials which are to accompany the application.]

161 Form of and procedure applicable to orders.S

[F7(1)Subject to section 249, a tree preservation order—

(a)takes effect on such date as may be specified in the order, but

(b)expires 6 months after it is made unless it has, within that period, been confirmed by the planning authority.

(1A)An order may be confirmed under subsection (1)(b) without modification or subject to such modifications as the planning authority consider expedient.]

(2)As soon as a tree preservation order is confirmed, the planning authority shall record it in the appropriate Register of Sasines or, as the case may be, register it in the Land Register of Scotland.

(3)Provision may be made by regulations with respect to—

(a)the form of tree preservation orders, and

(b)the procedure to be followed in connection with the confirmation of such orders.

(4)Without prejudice to the generality of subsection (3), the regulations may make provision—

(a)that, before a tree preservation order is confirmed by the planning authority, notice of the making of the order shall be given to the owners, lessees and occupiers of land affected by the order and to such other persons, if any, as may be specified in the regulations,

(b)that objections and representations with respect to the order, if duly made in accordance with the regulations, shall be considered before the order is confirmed by the planning authority, and

(c)that copies of the order, when confirmed by the authority, shall be served on such persons as may be specified in the regulations.

Textual Amendments

F7S. 161(1)(1A) substituted for s. 161(1) (1.2.2011) by Planning etc. (Scotland) Act 2006 (asp 17), ss. 28(3), 59(2) (with S.S.I. 2010/431, arts. 1(1), 2); S.S.I. 2010/400, art. 3, sch.

[F8161AImminent danger to trees: entry to affix copy of tree preservation orderS

(1)If it appears to a planning authority that a tree, group of trees or woodlands—

(a)on land in their district, and

(b)in respect of which they have made a tree preservation order,

may be in imminent danger of being cut down, topped, lopped, uprooted, wilfully damaged or wilfully destroyed and accordingly that it is expedient that a copy of the order should be affixed conspicuously to the tree, group of trees or woodlands in question, a person duly authorised in writing by them may enter the land and so affix such a copy.

(2)Subsection (1) is without prejudice to any provision made by virtue of section 161(3)(b) and (4) as respects notice of the making of the order.]

[F9162Tree preservation: Forestry CommissionersS

(1)A tree preservation order does not have effect in respect of anything done—

(a)by or on behalf of the Forestry Commissioners on land placed at their disposal in pursuance of the Forestry Act 1967 or otherwise under their management or supervision;

(b)by or on behalf of any other person in accordance with a relevant plan which is for the time being in force.

(2)A relevant plan is a plan of operations or other working plan approved by the Forestry Commissioners under—

(a)a forestry dedication agreement within the meaning of section 5 of the Forestry Act 1967, or

(b)conditions of a grant or loan made under section 1 of the Forestry Act 1979.

(3)A reference to a provision of the Forestry Act 1967 or the Forestry Act 1979 includes a reference to a corresponding provision replaced by that provision or any earlier corresponding provision.]

Textual Amendments

F10163 Provisional tree preservation orders.S

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

164 Power for Secretary of State to make tree preservation orders.S

(1)If it appears to the Secretary of State that it is expedient that a tree preservation order, or an order amending or revoking such an order, should be made, he may himself make such an order.

(2)Such an order made by the Secretary of State shall have the same effect as if it had been made by the planning authority and [F11timeously] confirmed by them under this Chapter.

(3)The Secretary of State shall not make such an order without consulting the planning authority.

(4)The provisions of this Chapter and of any regulations made under it with respect to the procedure to be followed in connection with the making and confirmation of any order mentioned in subsection (1) and the service of copies of it as confirmed shall have effect, subject to any necessary modifications, in relation to any proposal by the Secretary of State to make such an order by virtue of subsection (1), its making by him and the service of copies of it.

Textual Amendments

Compensation for loss or damage caused by orders etc.S

165 Compensation in respect of tree preservation orders.S

(1)A tree preservation order may make provision for the payment by the planning authority, subject to such exceptions and conditions as may be specified in the order, of compensation in respect of loss or damage caused or incurred in consequence of—

(a)the refusal of any consent required under the order, or

(b)the grant of any such consent subject to conditions.

(2)Except in so far as may be otherwise provided by section 166(5), any tree preservation order or any regulations made under this Act, any question of disputed compensation under this section shall be referred to and determined by the Lands Tribunal.

(3)In relation to the determination of any such question, the provisions of sections 9 and 11 of the M5Land Compensation (Scotland) Act 1963 shall apply subject to any necessary modifications and to the provisions of any regulations made under this Act.

Marginal Citations

166 Compensation in respect of requirement as to replanting of trees.S

(1)This section applies where—

(a)a requirement is imposed by the planning authority or the Secretary of State under a tree preservation order for securing the replanting of all or any part of a woodland area which is felled in the course of forestry operations permitted by or under the order, and

(b)the Forestry Commissioners decide not to make any grant or loan under section 1 of the M6Forestry Act 1979 in respect of the replanting by reason that the requirement frustrates the use of the woodland area for the growing of timber or other forest products for commercial purposes and in accordance with the rules or practice of good forestry.

(2)Where this section applies, the planning authority exercising functions under the tree preservation order shall be liable, on the making of a claim in accordance with this section, to pay compensation in respect of such loss or damage, if any, as is caused or incurred in consequence of compliance with the requirement.

(3)The Forestry Commissioners shall, at the request of the person under a duty to comply with such a requirement as is mentioned in subsection (1)(a), give a certificate stating—

(a)whether they have decided not to make such a grant or loan as is mentioned in subsection (1)(b), and

(b)if so, the grounds for their decision.

(4)A claim for compensation under this section must be served on the planning authority—

(a)within 12 months from the date on which the requirement was made, or

(b)where an application has been made to the Secretary of State for the determination of any question relating to the reasonableness of a requirement, within 12 months from the date of the determination of the Secretary of State,

but subject in either case to such extension of that period as the planning authority may allow.

(5)Any question of disputed compensation under this section shall be determined in accordance with section 70 of the M7Countryside (Scotland) Act 1967.

Marginal Citations

Consequences of tree removal etc.S

167 Replacement of trees.S

(1)If any tree in respect of which a tree preservation order is for the time being in force—

(a)is removed, uprooted or destroyed in contravention of the order, or

(b)except in the case of a tree to which the order applies as part of a woodland, is removed, uprooted or destroyed or dies at a time when its felling or uprooting is authorised only by virtue of section 160(6)(a),

it shall be the duty of the owner of the land to plant another tree of an appropriate size and species at the same place as soon as he reasonably can.

(2)The duty imposed by subsection (1) does not apply to an owner if on application by him the planning authority dispense with it.

(3)In respect of trees in a woodland it shall be sufficient for the purposes of this section to replace the trees removed, uprooted or destroyed by planting the same number of trees—

(a)on or near the land on which the trees removed, uprooted or destroyed stood, or

(b)on such other land as may be agreed between the planning authority and the owner of the land,

and in such places as may be designated by the planning authority.

(4)In relation to any tree planted pursuant to this section, the relevant tree preservation order shall apply as it applied to the original tree.

(5)The duty imposed by subsection (1) on the owner of any land shall attach to the person who is from time to time the owner of the land.

168 Enforcement of duties as to replacement of trees.S

(1)If it appears to the planning authority that—

(a)the provisions of section 167, or

(b)any conditions of a consent given under a tree preservation order which require the replacement of trees,

are not complied with in the case of any tree or trees, the authority may serve on the owner of the land a notice requiring him, within such period as may be specified in the notice, to plant a tree or trees of such size and species as may be so specified.

(2)A notice under subsection (1) may be served by a planning authority only within 2 years from the date on which the failure to comply with those provisions or conditions came to the knowledge of the authority.

(3)A notice under subsection (1) shall specify a period at the end of which it is to take effect, being a period of not less than 28 days beginning with the date of service of the notice.

[F12(3A)In relation to any tree planted by virtue of a requirement such as is mentioned in subsection (1)(b), the relevant tree preservation order shall apply as it applied to the original trees.]

(4)The duty imposed by section 167(1) may only be enforced as provided by this section and not otherwise.

169 Appeal against section 168 notice.S

(1)A person on whom a notice under section 168(1) is served may appeal to the Secretary of State against the notice on any of the following grounds—

(a)that the provisions of section 167 or, as the case may be, the conditions mentioned in section 168(1)(b) are not applicable or have been complied with;

(b)that in all the circumstances of the case the duty imposed by section 167 should be dispensed with in relation to any tree;

(c)that the requirements of the notice are unreasonable in respect of the period or the size or species of trees specified in it;

(d)that the planting of a tree or trees in accordance with the notice is not required in the interests of amenity or would be contrary to the practice of good forestry;

(e)that the place on which the tree is or trees are required to be planted is unsuitable for that purpose.

(2)An appeal under subsection (1) may be made either by giving written notice to the Secretary of State before the end of the period specified in accordance with section 168(3), or by sending such notice to him in a properly addressed and prepaid letter posted to him at such time that, in the ordinary course of post, it would be delivered to him before the end of that period.

(3)A person who gives notice under subsection (2) shall submit to the Secretary of State, either when giving the notice or within such time as may be prescribed under subsection (4), a statement in writing—

(a)specifying the grounds on which he is appealing against the notice under section 168(1), and

(b)giving such further information as may be so prescribed.

(4)The Secretary of State may prescribe the procedure to be followed on appeals under this section, and (without prejudice to the generality of the foregoing provisions of this subsection) in so prescribing—

(a)may specify the time within which an appellant is to submit a statement under subsection (3) and the matters on which information is to be given in such a statement;

(b)may require the planning authority to submit, within such time as may be specified, a statement indicating the submissions which they propose to put forward on the appeal;

(c)may specify the matters to be included in such a statement;

(d)may require the authority or the appellant to give such notice of an appeal under this section as may be specified to such persons as may be specified;

(e)may require the authority to send to the Secretary of State, within such period from the date of the bringing of the appeal as may be specified, a copy of the notice and a list of the persons on whom the notice has been served.

(5)The Secretary of State may—

(a)dismiss an appeal if the appellant fails to comply with subsection (3) within the time prescribed under subsection (4)(a), and

(b)allow an appeal and quash the notice under section 168(1) if the planning authority fail to comply with any requirement imposed by virtue of paragraph (b), (c) or (e) of subsection (4).

F13(6). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(7)Where such an appeal is brought, the notice under section 168(1) shall be of no effect pending the final determination or the withdrawal of the appeal.

(8)On such an appeal the Secretary of State may—

(a)correct any defect, error or misdescription in the notice under section 168(1), or

(b)vary its terms,

if he is satisfied that the correction or variation will not cause injustice to the appellant or the planning authority.

(9)On the determination of such an appeal the Secretary of State shall give directions for giving effect to the determination including, where appropriate, directions for quashing the notice under section 168(1).

(10)Schedule 4 applies to appeals under this section.

170 Execution and cost of works required by section 168 notice.S

(1)If, within the period specified in a notice under section 168(1) for compliance with it, or within such extended period as the planning authority may allow, any trees which are required to be planted by a notice under that section have not been planted, the planning authority may—

(a)enter the land and plant those trees, and

(b)recover from the person who is then the owner or lessee of the land any expenses reasonably incurred by them in doing so.

(2)If the person mentioned in subsection (1)(b) was entitled to appeal to the Secretary of State but did not do so, he shall not be entitled in proceedings under that subsection to dispute the validity of the action taken in accordance with the notice by the planning authority.

(3)In computing the amount of the expenses which may be recovered by them under subsection (1), a planning authority may include in that amount such proportion of their administrative expenses as seems to them to be appropriate.

(4)Where a notice under section 168(1) has been served—

(a)any expenses incurred by the owner, lessee or occupier of any land for the purpose of complying with the notice, and

(b)any sums paid by the owner or lessee of any land under subsection (1) in respect of expenses incurred by the planning authority in planting trees required by such a notice to be planted,

shall be recoverable from the person responsible for the cutting down, destruction or removal of the original tree or trees.

(5)If on a complaint by the owner of any land it appears to the sheriff that the occupier of the land is preventing the owner from carrying out work required to be carried out by a notice under section 168(1), the sheriff may by warrant authorise the owner to go on to the land and carry out the work.

(6)A planning authority taking steps under subsection (1) may sell any materials removed by them from the land unless those materials are claimed by the owner within 3 days of their removal by the planning authority.

(7)Where such materials have been sold the planning authority shall pay the owner the proceeds of the sale after deducting any expenses recoverable by them from him.

(8)Where a planning authority seek under subsection (1) to recover any expenses from a person on the basis that he is the owner of any land, and such person proves that—

(a)he is receiving the rent in respect of that land merely as trustee, tutor, curator, factor or agent of some other person, and

(b)he has not, and since the date of the service on him of the demand for payment has not had, in his hands on behalf of that other person sufficient money to discharge the whole demand of the authority,

his liability shall be limited to the total amount of the money which he has or has had in his hands on behalf of that other person.

(9)A planning authority who by reason of subsection (8) have not recovered the whole of any such expenses from a trustee, tutor, curator, factor or agent may recover any unpaid balance from the person on whose behalf the rent is received.

(10)Any person who wilfully obstructs a person acting in the exercise of the power conferred by subsection (1) shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

171 Penalties for non-compliance with tree preservation order.S

(1)If any person, in contravention of a tree preservation order—

(a)cuts down, uproots or wilfully destroys a tree, or

(b)wilfully damages, tops or lops a tree in such a manner as to be likely to destroy it,

he shall be guilty of an offence.

(2)A person guilty of an offence under subsection (1) shall be liable—

(a)on summary conviction to a fine not exceeding £20,000, and

(b)on conviction on indictment, to a fine.

(3)In determining the amount of any fine to be imposed on a person convicted of an offence under subsection (1), the court shall in particular have regard to any financial benefit which has accrued or appears likely to accrue to him in consequence of the offence.

(4)If any person contravenes the provisions of a tree preservation order otherwise than as mentioned in subsection (1), he shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 4 on the standard scale.

Trees in conservation areasS

172 Preservation of trees in conservation areas.S

(1)Subject to the provisions of this section and section 173, any person who, in relation to a tree to which this section applies, does any act which might by virtue of section 160(3)(a) be prohibited by a tree preservation order shall be guilty of an offence.

[F14(1A)Subsection (1) does not apply so far as the act in question is authorised by an order granting development consent.]

(2)Subject to section 173, this section applies to any tree in a conservation area in respect of which no tree preservation order is for the time being in force.

(3)It shall be a defence for a person charged with an offence under subsection (1) to prove—

(a)that he served notice of his intention to do the act in question (with sufficient particulars to identify the tree) on the planning authority in whose area the tree is or was situated, and

(b)that he did the act in question—

(i)with the consent of the planning authority in whose area the tree is or was situated, or

(ii)after the expiry of the period of 6 weeks from the date of the notice but before the expiry of the period of 2 years from that date.

(4)Section 171 shall apply to an offence under this section as it applies to a contravention of a tree preservation order.

[F15(5)An emanation of the Crown must not, in relation to a tree to which this section applies, do an act mentioned in subsection (1) above unless—

(a)the first condition is satisfied, and

(b)either the second or third condition is satisfied.

[F16(5A)Subsection (5) does not apply so far as the act in question is authorised by an order granting development consent.]

(6)The first condition is that the emanation serves notice of an intention to do the act (with sufficient particulars to identify the tree) on the planning authority in whose area the tree is situated.

(7)The second condition is that the act is done with the consent of the authority.

(8)The third condition is that the act is done—

(a)after the end of the period of six weeks starting with the date of the notice, and

(b)before the end of the period of two years starting with that date.]

173 Power to disapply section 172.S

(1)The Secretary of State may by regulations direct that section 172 shall not apply in such cases as may be specified in the regulations.

(2)Without prejudice to the generality of subsection (1), the regulations may be framed so as to exempt from the application of that section cases defined by reference to all or any of the following matters—

(a)acts of such descriptions or done in such circumstances or subject to such conditions as may be specified in the regulations;

(b)trees in such conservation areas as may be so specified;

(c)trees of a size or species so specified; or

(d)trees belonging to persons or bodies of a description so specified.

(3)The regulations may, in relation to any matter by reference to which an exemption is conferred by them, make different provision for different circumstances.

(4)Regulations under subsection (1) may in particular, but without prejudice to the generality of that subsection, exempt from the application of section 172 cases exempted from section 160 by subsection (6) of that section.

174 Enforcement of controls as respects trees in conservation areas.S

(1)If any tree to which section 172 applies—

(a)is removed, uprooted or destroyed in contravention of that section, or

(b)is removed, uprooted or destroyed or dies at a time when its cutting down or uprooting is authorised only by virtue of the provisions of such regulations under subsection (1) of section 173 as are mentioned in subsection (4) of that section,

it shall be the duty of the owner of the land to plant another tree of an appropriate size and species at the same place as soon as he reasonably can.

(2)The duty imposed by subsection (1) does not apply to an owner if on application by him the planning authority dispense with it.

(3)The duty imposed by subsection (1) on the owner of any land attaches to the person who is from time to time the owner of the land and may be enforced as provided by section 168 and not otherwise.

175 Register of section 172 notices.S

It shall be the duty of a planning authority to compile and keep available for public inspection free of charge at all reasonable hours and at a convenient place a register containing such particulars as the Secretary of State may determine of notices under section 172 affecting trees in their district.

Rights of entryS

176 Rights to enter without warrant.S

(1)Any person duly authorised in writing by a planning authority may enter any land for the purpose of—

(a)surveying it in connection with making or confirming a tree preservation order with respect to the land,

(b)ascertaining whether an offence under section 171 or 172 has been committed on the land, or

(c)determining whether a notice under section 168(1) should be served on the owner of the land,

if there are reasonable grounds for entering for the purpose in question.

(2)Any person duly authorised in writing by the Secretary of State may enter any land for the purpose of surveying it in connection with making, amending or revoking a tree preservation order with respect to the land if there are reasonable grounds for entering for that purpose.

(3)Any person who is duly authorised in writing by a planning authority may enter any land in connection with the exercise of any functions conferred on the authority by or under sections 159 to 163 and 167 to 170.

(4)Any person who is an officer of the Valuation Office may enter any land for the purpose of surveying it, or estimating its value, in connection with a claim for compensation in respect of any land which is payable by the planning authority under section 165.

(5)Any person who is duly authorised in writing by the Secretary of State may enter any land in connection with the exercise of any functions conferred on the Secretary of State by or under sections 160 to 162, 168(1) to (3), 169 and 170.

(6)The Secretary of State shall not authorise any person as mentioned in subsection (2) without consulting the planning authority.

(7)Admission shall not be demanded as of right—

(a)by virtue of subsection (1) or (2) to any building used as a dwellinghouse, or

(b)by virtue of subsection (3), (4) or (5) to any land which is occupied,

unless 24 hours’ notice of the intended entry has been given to the occupier.

(8)Any right to enter by virtue of this section shall be exercised at a reasonable hour.

177 Right to enter under warrant.S

(1)If the sheriff is satisfied—

(a)that there are reasonable grounds for entering any land for any of the purposes mentioned in section 176(1) or (2), and

(b)that—

(i)admission to the land has been refused, or a refusal is reasonably apprehended, or

(ii)the case is one of urgency,

he may issue a warrant authorising any person duly authorised in writing by a planning authority or, as the case may be, the Secretary of State to enter the land.

(2)For the purposes of subsection (1)(b)(i) of this section admission to land shall be regarded as having been refused if no reply is received to a request for admission within a reasonable period.

(3)A warrant authorises entry on one occasion only and that entry must be—

(a)within one month from the date of the issue of the warrant, and

(b)at a reasonable hour, unless the case is one of urgency.

178 Rights of entry: supplementary provisions.S

(1)Any power conferred under or by virtue of section 176 or 177 to enter land (referred to in this section as “a right of entry”) shall be construed as including power to take samples from any tree and samples of the soil.

(2)A person authorised to enter land in the exercise of a right of entry—

(a)shall, if so required, produce evidence of his authority and state the purpose of his entry before so entering,

(b)may take with him such other persons as may be necessary, and

(c)on leaving the land shall, if the owner or occupier is not then present, leave it as effectively secured against trespassers as he found it.

(3)Any person who wilfully obstructs a person acting in the exercise of a right of entry shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

(4)If any damage is caused to land or moveable property in the exercise of a right of entry, compensation may be recovered by any person suffering the damage from the authority who gave the written authority for the entry or, as the case may be, the Secretary of State.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan

Y Ddeddf Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan heb Atodlenni

Y Ddeddf Gyfan heb Atodlenni you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill