Crossrail Act 2008

This adran has no associated Nodiadau Esboniadol

10U.K.In the case of land specified in columns (1) and (2) of the following table, the power conferred by section 6(1) shall be exercisable only in relation to so much of the land as falls within the description specified in relation to it in column (3) of the table—

(1)(2)(3)
AreaNo. on deposited plansDescription of land subject to power of acquisition
City of Westminster79 and 80Land comprised within car park, road off Orsett Terrace and adjoining railway facilities.
96, 102, 103, 124 and 125Operational works and land comprised within Paddington Station (main line and underground) and road off Praed Street.
105Basement level of building and subsoil beneath.
106Basement level of building.
324, 324a and 324bOperational works and land comprised within Bond Street Station.
323, 325a, 326a, 328, 339a and 693 to 709Operational works and land comprised within Bond Street Station together with such of the subsoil or under-surface of the land specified in columns (1) and (2) to which this description relates as lies beneath that station or as lies more than 9 metres below the level of the surface of the land.
London Borough of Camden8aGround floor, reception area, entrance, fire escape and paved area (Centre Point).
London Borough of Islington16Operational works and land comprised within Farringdon Station.
17Operational works and land comprised within Farringdon Station together with such of the subsoil or under-surface of the land specified in columns (1) and (2) to which this description relates as lies beneath that station or as lies more than 9 metres below the level of the surface of the land.
21Underground car park (Caxton House) and subsoil beneath.
22, 23 and 26Underground car parks (Caxton House and Snow Hill).
98Operational works and land comprised within Moorgate Station.
City of London5 and 6Underground car park (Snow Hill) and access road.
11Operational works and land comprised within Moorgate branch railway together with such of the subsoil or under-surface of the land specified in columns (1) and (2) to which this description relates as lies beneath that railway or as lies more than 9 metres below the level of the surface of the land.
12Operational works and land comprised within Moorgate Branch railway.
13Underground car park (Smithfield) and subsoil beneath.
14Underground car park (Smithfield).
49Operational works and land comprised within Barbican Station together with such of the subsoil or under-surface of the land specified in columns (1) and (2) to which this description relates as lies beneath that station or as lies more than 9 metres below the level of the surface of the land.
50Operational works and land comprised within Barbican Station.
75 and 90 to 92Operational works and land comprised within Moorgate Station.
76, 77 and 79Operational works and land comprised within Moorgate Station together with such of the subsoil or under-surface of the land specified in columns (1) and (2) to which this description relates as lies beneath that station or as lies more than 9 metres below the level of the surface of the land.
133, 139, 139a, 141, 141a, 146, 150 and 151Operational works and land comprised within Liverpool Street Station.
119, 120, 122, 142, 144, 148 and 149Operational works and land comprised within Liverpool Street Station together with such of the subsoil or under-surface of the land specified in columns (1) and (2) to which this description relates as lies beneath that station or as lies more than 9 metres below the level of the surface of the land.
London Borough of Tower Hamlets714a, 714b, 714c, 765b and 767bSubsoil or undersurface of the land between 5 metres and 20 metres beneath the level of the surface of the land.
717b, 727, 727a, 735b and 765aDock, bed thereof, dock wall (Banana Wall), operational works and land comprised within West India Dock (North).
London Borough of Hillingdon260 to 325Operational railway facilities (Heathrow Express Railway), including shafts and compounds together with access roads thereto.