Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Prescribed standards for metersE+W+S

3.—(1) The standards with which a meter examiner is to be satisfied that a meter conforms so that he may stamp, or authorise the stamping of, the meter in accordance with section 30(2) of the Act are as follows:—

(a)the meter is such that no gas or air will escape from it;

(b)in the case of any diaphragm meter, the meter, when used for the purpose of ascertaining the quantity of either gas or air passing through it—

(i)at any rate of flow not less than 1/50th of the greatest rate of flow for which it is designed and not more than that greatest rate of flow, will register such quantity of gas or air as does not differ from the actual quantity of gas or air passing through the meter by more than 2 per cent of that actual quantity; and

(ii)at the rate of flow specified in column 1 of Table A below which corresponds to the greatest rate of flow for which it is designed specified in column 2 of the Table, will register the passage of gas or air;

Table A

Column 1Column 2
Rate of flow in cubic decimetres per hourGreatest rate of flow for which the meter is designed in cubic metres per hour
15Not exceeding 6
30Exceeding 6 but not exceeding 25
60Exceeding 25 but not exceeding 65
150Exceeding 65

(c)in the case of a meter other than a diaphragm meter, [F1where that meter is designed for a maximum rate of flow exceeding 10 cubic metres per hour,] the meter, when used for the purpose of ascertaining the quantity of either gas or air passing through it—

(i)at any rate of flow not less than 1/5th of the greatest rate of flow for which it is designed and not more than that greatest rate of flow, will register such quantity of gas or air as does not differ from the actual quantity of gas or air passing through the meter by more than 1 per cent of that actual quantity; and

(ii)at any rate of flow not less than the smallest rate of flow for which it is designed and less than 1/5th of the greatest rate of flow for which it is designed, will register such quantity of gas or air as does not differ from the actual quantity of gas or air passing through the meter by more than 2 per cent of that actual quantity;

[F2(cc)in the case of a meter other than a diaphragm meter, where that meter is designed for a maximum rate of flow which does not exceed 10 cubic metres per hour, the meter, when used for the purpose of ascertaining the quantity of gas or air passing through it—

(i)at any rate of flow not less than

of the greatest rate of flow for which it is designed and not more than the greatest rate of flow for which it is designed, will register such quantity of gas or air as does not differ from the actual quantity of gas or air passing through the meter by more than 2 per cent of that actual quantity; and

(ii)at any rate of flow less than

of the greatest rate of flow for which it is designed and not less than

of the greatest rate of flow for which it is designed, will register such quantity of gas or air as does not differ from the actual quantity of gas or air passing through the meter by more than 3 per cent of that actual quantity;]

(d)in the case of a diaphragm meter designed to operate at a pressure of not more than 1 bar, the mean difference between the pressure of air at the inlet of the meter and the pressure of air at the outlet of the meter, where air is passing through the meter at the greatest rate of flow for which it is designed, will not exceed the amount specified in column 1 of Table B below which corresponds to that greatest rate of flow specified in column 2 of the Table; and

Table B

Column 1Column 2
Mean difference in millibarsGreatest rate of flow for which the meter is designed in cubic metres per hour
2.0Not exceeding 16
3.0Exceeding 16 but not exceeding 65
4.0Exceeding 65

(e)in the case of any diaphragm meter, the difference between the pressure at the inlet of the meter and the pressure at the outlet of the meter, when air is passing through the meter at the rate of flow which is 1 per cent of the greatest rate of flow for which the meter is designed, will not exceed the amount specified in column 1 of Table C below which corresponds to that greatest rate of flow specified in column 2 of the Table.

Table C

Column 1Column 2
Mean difference in millibarsGreatest rate of flow for which the meter is designed in cubic metres per hour
0.6Not exceeding 65
1.0Exceeding 65

(2) A meter shall be deemed to conform with a standard prescribed by paragraph (1)(b) [F3(c) or (cc) above], notwithstanding that gas instead of air is passing through the meter, where the results of testing for that standard show that if it had been conducted with air passing through the meter—

(a)at a density of 1.2 kilograms per cubic metre, or

(b)in a case where the meter is marked in such manner as is approved by the Secretary of State so as to indicate that the meter is to be used only for the purpose of ascertaining the quantity of gas supplied to any person at a specified range of densities of which the lower limit exceeds 1.2 kilograms per cubic metre, at the higher and lower limits of that range,

the meter would have conformed with that standard.

(3) A meter shall be deemed to conform with a standard prescribed by paragraph (1)(d) or (e) above, notwithstanding that gas instead of air is passing through the meter, where the results of testing for that standard show that, if it had been conducted with air passing through the meter at a density of 1.2 kilograms per cubic metre, the meter would have conformed with that standard.

Textual Amendments

Commencement Information

I1Reg. 3 in force at 1.6.1983, see reg. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill