5.  The works authorised by this Order are the following works in the District of Penwith in the county of Cornwall:—

  • Work No. 1. An extension to the jetty authorised by article 4 (Power to construct works) of the Newlyn Pier and Harbour Order 1978 increasing, in a straight line, the length of the said jetty by 90 metres or thereabouts and there terminating, the breadth of the extended jetty being 15 metres or thereabouts.

  • Work No. 2. A quay and jetty, including an area for the laying out and repairing of fishing nets, formed within that part of the bed and foreshore of the harbour which is to be or has been reclaimed in an area adjacent to the harbour wall in Fore Street commencing at a point 5 metres or thereabouts from the junction of the Strand with Fore Street and extending in a south easterly direction for 75 metres or thereabouts and thence in a north easterly direction for 15 metres or thereabouts and thence in a south easterly direction for 70 metres or thereabouts and thence in a south westerly direction for 20 metres or thereabouts and there terminating at the said harbour wall.

  • Work No. 3. A reclamation and filling in of that part of the bed and foreshore of the harbour which is to be or has been reclaimed in an area adjacent to the harbour wall in the Strand commencing at a point 38 metres or thereabouts from the junction of the Strand with Fore Street and extending in an easterly direction for 30 metres and thence in a southerly direction for 40 metres or thereabouts and thence in a north westerly direction for 30 metres or thereabouts and there terminating at the top of the slipway between the Strand and Fore Street.