1990 No. 686

GAS

The Gas (Meters) (Variation of Fees) Regulations 1990

Made

20th March 1990

Laid before Parliament

23rd March 1990

Coming into force

16th April 1990

The Secretary of State, in exercise of the powers conferred upon him by section 17(8)(d) and section 48(1)(1) of the Gas Act 1986(2) and all other powers enabling him in that behalf, hereby makes the following Regulations:

1.—(1) These Regulations may be cited as the Gas (Meters) (Variation of Fees) Regulations 1990 and shall come into force on 16th April 1990.

(2) Nothing in these Regulations shall apply in relation to a case in relation to which, in pursuance of subsection (12) of section 17 of the Gas Act 1986, the preceding provisions of that section do not have effect.

2.  The Gas (Meters) Regulations 1983(3) (hereinafter referred to as “the Principal Regulations”) shall have effect subject to the amendments specified in regulations 3 and 4 below.

3.  In regulation 5 of the Principal Regulations (fees)—

(a)“£31.80” shall be substituted for “£13.70” in paragraphs (2)(b) and (6)(b);

(b)“£4.70” shall be substituted for “£2.70” in paragraph (3);

(c)“£469” shall be substituted for “£375” in paragraph (4)(a);

(d)“£34.50” shall be substituted for “£30” in paragraph (4)(b);

(e)“£3,125” shall be substituted for “£2,500” in paragraph (5)(a); and

(f)“£230” shall be substituted for “£200” in paragraph (5)(b).

4.  The following Schedule shall be substituted for Schedule 1 to the Principal Regulations—

Regulation 5(1) and (10)

SCHEDULE 1FEES

(1)(2)
MeterFee
£
Prototype, or modified prototype incorporating relevant alterations, submitted for approval of its pattern and construction, of—

(a)a diaphragm meter

562.50

(b)a rotary positive displacement meter

1312.50

(c)a turbine meter

1487.50

(d)any other kind of meter

2343.75
Modified prototype not incorporating relevant alterations so submitted, of—

(a)a diaphragm meter

112.50

(b)a rotary positive displacement meter

262.50

(c)a turbine meter

297.50

(d)any other kind of meter

468.75
Any meter (not being a prototype or modified prototype so submitted) with measuring capacity—

(a)not exceeding 13 cubic metres per hour

0.83

(b)exceeding 13 cubic metres per hour but not exceeding 19 cubic metres per hour

1.67

(c)exceeding 19 cubic metres per hour but not exceeding 53 cubic metres per hour

5.01

(d)exceeding 53 cubic metres per hour but not exceeding 228 cubic metres per hour

16.74

(e)exceeding 228 cubic metres per hour but not exceeding 1600 cubic metres per hour

41.87

(f)exceeding 1600 cubic metres per hour

100.00

Note

For the purposes of this Schedule—

(a)“a modified prototype” means a prototype which, prior to modification, has already been examined by a meter examiner;

(b)a modified prototype incorporates relevant alterations if the alterations made to it in the course of modification are such that a meter examiner considers that further tests are necessary to determine whether it conforms to the standard prescribed in paragraph (1)(b) or (c) of regulation 3 above;

(c)“a rotary positive displacement meter” means a meter constructed so that it contains a rotating partition; and

(d)“a turbine meter” means a meter constructed so that it contains a turbine wheel.

Peter Morrison

Minister of State,

Department of Energy

20th March 1990

Explanatory Note

(This note is not part of the Regulations)

These Regulations alter fees prescribed by the Gas (Meters) Regulations 1983 (as amended). The fees are payable to the Secretary of State for the examination of gas meters by examiners appointed by him, and for stamping meters as being in conformity with applicable standards. Regulation 3 increases fees payable in respect of time spent by examiners in travelling, preparatory work and dismantling equipment (paragraph (a)), and in respect of the examination of a disputed meter (paragraph (b)); it also increases supplementary fees payable in respect of the examination of certain special kinds of meter (paragraphs (c)—(e)).

Regulation 4 substitutes a Schedule setting out new fees for examining prototype meters and for examining or stamping meters which are not prototypes. The new fees relating to prototypes are 25% higher than those previously in force. The fees relating to other meters represent increases of 15%, except in the case of those meters with the smallest capacity (those generally used in connection with domestic gas supplies), the fee for which is reduced by 10%, and except also in the case of those meters with the largest capacity (exceeding 1600 cubic meters per hour), for which provision has not been made previously. The fee prescribed for meters with a capacity exceeding 1600 cubic metres per hour will not apply in cases where there is a supply agreement providing for a meter exceeding this capacity to be used; such cases are excluded from the scope of section 17 of the Gas Act 1986.

(1)

See the definition of “regulations”.

(3)

S.I. 1983/684, amended by S.I. 1988/980.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill