- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
3.—(1) In this Order—
“barrage” includes a dam, weir, barrier, embankment, breakwater and any other structure for impounding, or diverting or controlling the flow of, water;
“bridge” includes a viaduct, an aqueduct and a gantry and the abutments of and approaches to a bridge;
“cable” means a telegraph, telephone or electric power cable (whether submerged or airborne), an aerial cableway or a cable or chain used to guide a ferry;
“land reclamation” means works for restoring or converting to dry land or to a polder areas of land which are continuously or intermittently covered by water and also means other works in, on or over such land;
“navigational aid” means any structure or device (whether fixed or floating) providing a light, sound or other signal or other aid for the safety of navigation in or over water or in the air;
“offshore installation” means an installation or device (whether fixed or floating) for the exploitation, or exploration with a view to exploitation, of the natural resources of any waters, the bed or subsoil thereof or the air-space thereover and also means any other installation or device performing, or intended to perform, or which has performed, any activity of a kind specified in section 1(2) of the Mineral Workings (Offshore Installations) Act 1971(1) in so far as the activity relates to such bed or subsoil;
“pier” includes a jetty, quay, wharf, mole, staging, slipway and any similar structure, device or facility (whether fixed or floating) used for the mooring, landing, launching or beaching of vessels or for promenading or other recreational purposes;
“pipeline” means a pipe or system of pipes for the conveyance of any thing and also means a sewer, drain, duct and any apparatus or works associated with such a pipe or system of a kind specified in paragraphs (a) to (f) of section 33(1) of the Petroleum and Submarine Pipe-lines Act 1975(2) and for the purposes of this definition references in those paragraphs to “the pipe or system” are to be construed accordingly;
“tunnel” means a tunnel for the passage of vehicles, persons on foot or animals and includes a submerged tube used for any of those purposes, the approaches to a tunnel and works for the operation or protection of a tunnel; and
“utilities structure” means a structure or plant, whether attached to dry land or otherwise and whether fixed or floating, used, or intended to be used, or which has been used, for a transport, communications, electricity generation, water extraction (including desalination), waste disposal or similar purpose.
(2) In this Order, references to “works” are to be construed as including the construction, emplacement, removal, demolition, alteration or modification of the works in question, or of any part thereof, and any works ancillary thereto.
1971 c. 61; section 1 was substituted by section 24 of the Oil and Gas (Enterprise) Act 1982 (c. 23).
1975 c. 74; section 33(1) was amended by the insertion of paragraph (aa) by section 25(1) of the Oil and Gas (Enterprise) Act 1982.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: