Chwilio Deddfwriaeth

The Town and Country Planning (General Permitted Development) Order 1995

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Rhagor o Adnoddau

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Town and Country Planning (General Permitted Development) Order 1995. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 2 Part 18:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

PART 18 E+WAVIATION DEVELOPMENT

Class A Development at an airportE+W

Permitted developmentE+W

A.  The carrying out on operational land by a relevant airport operator or its agent of development (including the erection or alteration of an operational building) in connection with the provision of services and facilities at a relevant airport.

Development not permittedE+W

A.1  Development is not permitted by Class A if it would consist of or include—

(a)the construction or extension of a runway;

(b)the construction of a passenger terminal the floor space of which would exceed 500 square metres;

(c)the extension or alteration of a passenger terminal, where the floor space of the building as existing at 5th December 1988 or, if built after that date, of the building as built, would be exceeded by more than 15%;

(d)the erection of a building other than an operational building;

(e)the alteration or reconstruction of a building other than an operational building, where its design or external appearance would be materially affected.

ConditionE+W

A.2  Development is permitted by Class A subject to the condition that the relevant airport operator consults the local planning authority before carrying out any development, unless that development falls within the description in paragraph A.4.

Interpretation of Class AE+W

A.3  For the purposes of paragraph A.1, floor space shall be calculated by external measurement and without taking account of the floor space in any pier or satellite.

A.4  Development falls within this paragraph if—E+W

(a)it is urgently required for the efficient running of the airport, and

(b)it consists of the carrying out of works, or the erection or construction of a structure or of an ancillary building, or the placing on land of equipment, and the works, structure, building, or equipment do not exceed 4 metres in height or 200 cubic metres in capacity.

Class B Air navigation development at an airportE+W

Permitted developmentE+W

B.  The carrying out on operational land within the perimeter of a relevant airport by a relevant airport operator or its agent of development in connection with—

(a)the provision of air traffic control services,

(b)the navigation of aircraft using the airport, or

(c)the monitoring of the movement of aircraft using the airport.

Class C Air navigation development near an airportE+W

Permitted developmentE+W

C.  The carrying out on operational land outside but within 8 kilometres of the perimeter of a relevant airport, by a relevant airport operator or its agent, of development in connection with—

(a)the provision of air traffic control services,

(b)the navigation of aircraft using the airport, or

(c)the monitoring of the movement of aircraft using the airport.

Development not permittedE+W

C.1  Development is not permitted by Class C if—

(a)any building erected would be used for a purpose other than housing equipment used in connection with the provision of air traffic control services, with assisting the navigation of aircraft, or with monitoring the movement of aircraft using the airport;

(b)any building erected would exceed a height of 4 metres;

(c)it would consist of the installation or erection of any radar or radio mast, antenna or other apparatus which would exceed 15 metres in height, or, where an existing mast, antenna or apparatus is replaced, the height of that mast, antenna or apparatus, if greater.

Class D Development by Civil Aviation Authority within an airportE+W

Permitted developmentE+W

D.  The carrying out by the Civil Aviation Authority or its agents, within the perimeter of an airport at which the Authority provides air traffic control services, of development in connection with—

(a)the provision of air traffic control services,

(b)the navigation of aircraft using the airport, or

(c)the monitoring of the movement of aircraft using the airport.

Class E Development by the Civil Aviation Authority for air traffic control and navigationE+W

Permitted developmentE+W

E.  The carrying out on operational land of the Civil Aviation Authority by the Authority or its agents of development in connection with—

(a)the provision of air traffic control services,

(b)the navigation of aircraft, or

(c)monitoring the movement of aircraft.

Development not permittedE+W

E.1  Development is not permitted by Class E if—

(a)any building erected would be used for a purpose other than housing equipment used in connection with the provision of air traffic control services, assisting the navigation of aircraft or monitoring the movement of aircraft;

(b)any building erected would exceed a height of 4 metres; or

(c)it would consist of the installation or erection of any radar or radio mast, antenna or other apparatus which would exceed 15 metres in height, or, where an existing mast, antenna or apparatus is replaced, the height of that mast, antenna or apparatus, if greater.

Class F Development by the Civil Aviation Authority in an emergencyE+W

Permitted developmentE+W

F.  The use of land by or on behalf of the Civil Aviation Authority in an emergency to station moveable apparatus replacing unserviceable apparatus.

ConditionE+W

F.1  Development is permitted by Class F subject to the condition that on or before the expiry of a period of six months beginning with the date on which the use began, the use shall cease, and any apparatus shall be removed, and the land shall be restored to its condition before the development took place, or to any other condition as may be agreed in writing between the local planning authority and the developer.

Class G Development by the Civil Aviation Authority for air traffic control etc.E+W

Permitted developmentE+W

G.  The use of land by or on behalf of the Civil Aviation Authority to provide services and facilities in connection with—

(a)the provision of air traffic control services,

(b)the navigation of aircraft, or

(c)the monitoring of aircraft,

and the erection or placing of moveable structures on the land for the purpose of that use.

ConditionE+W

G.1  Development is permitted by Class G subject to the condition that, on or before the expiry of the period of six months beginning with the date on which the use began, the use shall cease, and any structure shall be removed, and the land shall be restored to its condition before the development took place, or to any other condition as may be agreed in writing between the local planning authority and the developer.

Class H Development by the Civil Aviation Authority for surveys etc.E+W

Permitted developmentE+W

H.  The use of land by or on behalf of the Civil Aviation Authority for the stationing and operation of apparatus in connection with the carrying out of surveys or investigations.

ConditionE+W

H.1  Development is permitted by Class H subject to the condition that on or before the expiry of the period of six months beginning with the date on which the use began, the use shall cease, and any apparatus shall be removed, and the land shall be restored to its condition before the development took place, or to any other condition as may be agreed in writing between the local planning authority and the developer.

Class I Use of airport buildings managed by relevant airport operatorsE+W

Permitted developmentE+W

I.  The use of buildings within the perimeter of an airport managed by a relevant airport operator for purposes connected with air transport services or other flying activities at that airport.

Interpretation of Part 18E+W

J.  For the purposes of Part 18—

  • “operational building" means a building, other than a hotel, required in connection with the movement or maintenance of aircraft, or with the embarking, disembarking, loading, discharge or transport of passengers, livestock or goods at a relevant airport;

  • “relevant airport" means an airport to which Part V of the Airports Act 1986 M1 (status of certain airports as statutory undertakers etc.) applies; and

  • “relevant airport operator" means a relevant airport operator within the meaning of section 57 of the Airports Act 1986 (scope of Part V).

Marginal Citations

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.