Chwilio Deddfwriaeth

The Town and Country Planning (General Permitted Development) Order 1995

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

Class A

A.    Permitted development

The carrying out of operations for the erection, extension, installation, rearrangement, replacement, repair or other alteration of any—

(a)plant or machinery,

(b)buildings,

(c)private ways or private railways or sidings, or

(d)sewers, mains, pipes, cables or other similar apparatus,

on land used as a mine.

A.1    Development not permitted

Development is not permitted by Class A—

(a)in relation to land at an underground mine—

(i)on land which is not an approved site; or

(ii)on land to which the description in paragraph D.1(b) applies, unless a plan of that land was deposited with the mineral planning authority before 5th June 1989;

(b)if the principal purpose of the development would be any purpose other than—

(i)purposes in connection with the winning and working of minerals at that mine or of minerals brought to the surface at that mine; or

(ii)the treatment, storage or removal from the mine of such minerals or waste materials derived from them;

(c)if the external appearance of the mine would be materially affected;

(d)if the height of any building, plant or machinery which is not in an excavation would exceed—

(i)15 metres above ground level; or

(ii)the height of the building, plant or machinery, if any, which is being rearranged, replaced or repaired or otherwise altered,

whichever is the greater;

(e)if the height of any building, plant or machinery in an excavation would exceed—

(i)15 metres above the excavated ground level; or

(ii)15 metres above the lowest point of the unexcavated ground immediately adjacent to the excavation; or

(iii)the height of the building, plant or machinery, if any, which is being rearranged, replaced or repaired or otherwise altered,

whichever is the greatest;

(f)if any building erected (other than a replacement building) would have a floor space exceeding 1,000 square metres; or

(g)if the cubic content of any replaced, extended or altered building would exceed by more than 25% the cubic content of the building replaced, extended or altered or the floor space would exceed by more than 1,000 square metres the floor space of that building.

A.2    Condition

Development is permitted by Class A subject to the condition that before the end of the period of 24 months from the date when the mining operations have permanently ceased, or any longer period which the mineral planning authority agree in writing—

(a)all buildings, plant and machinery permitted by Class A shall be removed from the land unless the mineral planning authority have otherwise agreed in writing; and

(b)the land shall be restored, so far as is practicable, to its condition before the development took place, or restored to such condition as may have been agreed in writing between the mineral planning authority and the developer.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill