- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Pwynt Penodol mewn Amser (01/03/1996)
- Gwreiddiol (a wnaed Fel)
Point in time view as at 01/03/1996.
There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Town and Country Planning (General Permitted Development) Order 1995. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
A. Development consisting of—
(a)the setting up and the maintenance, improvement or other alteration of facilities for the collection of tolls;
(b)the provision of a hard surface to be used for the parking of vehicles in connection with the use of such facilities.
A.1 Development is not permitted by Class A if—
(a)it is not located within 100 metres (measured along the ground) of the boundary of a toll road;
(b)the height of any building or structure would exceed—
(i)7.5 metres excluding any rooftop structure; or
(ii)10 metres including any rooftop structure;
(c)the aggregate area of the floor space at or above ground level of any building or group of buildings within a toll collection area, excluding the floor space of any toll collection booth, would exceed 1,500 square metres.
A.2 In the case of any article 1(5) land, development is permitted by Class A subject to the following conditions—
(a)the developer shall, before beginning the development, apply to the local planning authority for a determination as to whether the prior approval of the authority will be required to the siting, design and external appearance of the facilities for the collection of tolls;
(b)the application shall be accompanied by a written description, together with plans and elevations, of the proposed development and any fee required to be paid;
(c)the development shall not be begun before the occurrence of one of the following—
(i)the receipt by the applicant from the local planning authority of a written notice of their determination that such prior approval is not required;
(ii)where the local planning authority give the applicant notice within 28 days following the date of receiving his application of their determination that such prior approval is required, the giving of such approval; or
(iii)the expiry of 28 days following the date on which the application was received by the local planning authority without the local planning authority making any determination as to whether such approval is required or notifying the applicant of their determination;
(d)the development shall, except to the extent that the local planning authority otherwise agree in writing, be carried out—
(i)where prior approval is required, in accordance with the details approved;
(ii)where prior approval is not required, in accordance with the details submitted with the application;
and
(e)the development shall be carried out—
(i)where approval has been given by the local planning authority, within a period of five years from the date on which the approval was given;
(ii)in any other case, within a period of five years from the date on which the local planning authority were given the information referred to in sub-paragraph (b).
A.3 For the purposes of Class A—
“facilities for the collection of tolls" means such buildings, structures, or other facilities as are reasonably required for the purpose of or in connection with the collection of tolls in pursuance of a toll order;
“ground level" means the level of the surface of the ground immediately adjacent to the building or group of buildings in question or, where the level of the surface of the ground on which it is situated or is to be situated is not uniform, the level of the highest part of the surface of the ground adjacent to it;
“rooftop structure" means any apparatus or structure which is reasonably required to be located on and attached to the roof, being an apparatus or structure which is–
so located for the provision of heating, ventilation, air conditioning, water, gas or electricity;
lift machinery; or
reasonably required for safety purposes;
“toll" means a toll which may be charged pursuant to a toll order;
“toll collection area" means an area of land where tolls are collected in pursuance of a toll order, and includes any facilities for the collection of tolls;
“toll collection booth" means any building or structure designed or adapted for the purpose of collecting tolls in pursuance of a toll order;
“toll order" has the same meaning as in Part I of the New Roads and Street Works Act 1991 M1 (new roads in England and Wales); and
“toll road" means a road which is the subject of a toll order.
Marginal Citations
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.