- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
Article 3(2)
(1) | (2) |
---|---|
Item | Length of Road |
New Road (A13)—north side | |
1. | Between the Borough boundary with the London Borough of Barking and Dagenham and a point opposite the western flank wall of No. 9 Beam Parade, New Road. |
2. | Between a point opposite the eastern flank wall of No. 13 Beam Parade, New Road and a point opposite the western flank wall of No. 167 New Road. |
3. | Between a point opposite the party wall of Nos. 169 and 171 New Road and a point 80.0 metres east of the eastern kerbline of Dovers Corner roundabout (A13). |
New Road (A13)—south side | |
4. | Between the Borough boundary with the London Borough of Barking and Dagenham and a point 5.0 metres east of the eastern flank wall of No. 99 New Road. |
5. | Between a point 31.0 metres west of the western flank wall of No. 125 New Road and a point 80.0 metres east of the eastern kerbline of Dovers Corner roundabout (A13). |
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: