Introductory Text
1.The new highway which the Secretary of State proposes to...
2.The centre line of the new trunk road is identified...
3.The length of trunk road described in Schedule 2 to...
4.The Secretary of State is authorised to construct the bridge...
5.In this Order:— (1) All measurements of distance are measured...
6.This Order shall come into force on 19th December 1996...
Signature
SCHEDULE 1
ROUTE OF THE NEW TRUNK ROAD
The route of the new trunk road is a route...
SCHEDULE 2
LENGTH OF THE EXISTING TRUNK ROAD CEASING TO BE A TRUNK ROAD
The length of the existing trunk road ceasing to be...
SCHEDULE 3
Plans and specifications of new bridge over the River Towy,...