The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about opening options

Dewisiadau Agor

Rhagor o Adnoddau

Changes over time for: PART IV

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998, PART IV. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART IVU.K.CLOSING OF OPENINGS IN ENCLOSED SUPERSTRUCTURES AND IN BULKHEADS ABOVE THE BULKHEAD DECK

Application and interpretationU.K.

21.—(1) This Part applies to—

(a)United Kingdom ro-ro passenger ships; and

(b)non-United Kingdom ro-ro passenger ships with the exception of—

(i)regulation 24(2) and (3);

(ii)regulation 26(2) to the extent that it relates to regulation 24(2);

(iii)regulation 27(1) and (2) to the extent that it relates to any berth which is not situated within a port in the United Kingdom; and

(iv)regulation 28(2).

(2) In this Part the following expressions have the following meanings—

  • “doors” includes bow visors and appliances described in regulation 22(1)(c);

  • “length” means the ship’s overall length; and

  • “loading doors” means the doors described in regulation 22(1)(a) to (d) inclusive.

(3) A door shall be deemed to be above the bulkhead deck if the sill of the opening with which it is associated is above that deck.

Commencement Information

I1Reg. 21 in force at 12.11.1998, see reg. 1

Closure of main loading doorsU.K.

22.—(1) Except in the cases specified in paragraphs (2) and (4) the following loading doors—

(a)gangway and cargo loading doors fitted in the shell or boundaries or enclosed superstructures;

(b)bow visors so fitted;

(c)weathertight ramps so fitted and used instead of doors for closing openings for cargo or vehicle loading; and

(d)cargo loading doors in the collision bulkhead;

shall be closed and locked before the ship leaves its berth and shall be kept closed and locked until the ship has been secured at its next berth.

(2) Where a bow visor or a weathertight ramp cannot be opened or closed while the ship is secured at its berth, it may so far as necessary and subject to paragraph (3) be opened or kept open while the ship approaches or draws away from its berth, as the case may be.

(3) In no case shall a loading door be open when the ship is more than one ship’s length from the cargo loading or discharging position of its berth.

(4) Paragraph (1) shall not apply to small doors intended to be used for pilot access, fuelling or other matters necessary for the operation of the ship and not intended to be used by passengers or for loading cargo.

Commencement Information

I2Reg. 22 in force at 12.11.1998, see reg. 1

Supervision and reporting of closureU.K.

23.—(1) Before the ship proceeds on a voyage an officer appointed for the purpose by the master shall—

(a)verify that every loading door has been closed and locked; and

(b)report the fact that they have been closed and locked to the master or other officer in charge of the bridge.

(2) Save as permitted by regulation 22(2) the ship shall not proceed on a voyage until the report referred to in sub-paragraph (1)(b) has been received by the master or other officer in charge of the bridge.

Commencement Information

I3Reg. 23 in force at 12.11.1998, see reg. 1

Closure of weathertight doors in bulkheadsU.K.

24.—(1) Weathertight doors above the bulkhead deck (except doors fitted in collision bulkheads to which regulation 22 applies) which are fitted in bulkheads which are required to be watertight or weathertight as the case may be and which separate or form the boundary of cargo spaces shall be closed and locked before the ship leaves its berth and be kept closed and locked until the ship has been secured at its next berth.

(2) Weathertight doors above the bulkhead deck fitted in the shell or in bulkheads which are required to be watertight or weathertight, other than those doors described in regulations 22(1) and 24(1), shall be kept closed whilst the ship is on any voyage except when opened on the express authority of the master.

(3) Any weathertight door which may be opened in accordance with the exception to paragraph (2) shall be kept clear of obstructions which might prevent its rapid closure.

Commencement Information

I4Reg. 24 in force at 12.11.1998, see reg. 1

Opening of doors in an emergencyU.K.

25.  Notwithstanding the provisions of regulations 22(1) and 24(1), gangway and cargo loading doors may be opened in an emergency but only when the master considers such opening will not put the safety of the ship at risk.

Commencement Information

I5Reg. 25 in force at 12.11.1998, see reg. 1

Entries in a record bookU.K.

26.  Entries shall be made in a book retained on board for recording the following—

(1) the times of the last closing, in accordance with regulations 22(1) and 24(1), of the weathertight doors referred to in those regulations and of the next opening of such doors; and

(2) the times of the opening and closing of any weathertight door pursuant to regulations 24(2) and 25.

Commencement Information

I6Reg. 26 in force at 12.11.1998, see reg. 1

Listing of loading and unloading berthsU.K.

27.—(1) The owner of the ship shall ensure that the ship is provided with a list (the Berth List) of all loading berths at which it is intended the ship shall load or discharge cargo or vehicles.

(2) The Berth List shall list separately for each port which the ship is intended to visit to load or discharge cargo or vehicles—

(a)the loading berths at which the ship in question can, when so loading or discharging, comply with the requirements of regulation 22(1) without relying on paragraph (2) of that regulation; and

(b)where it is intended that the ship shall so load or discharge in the manner permitted by regulation 22(2), the loading berths at which it will so load or discharge.

  • The berths of the type described in sub-paragraph (b) shall be listed separately from those of the type described in sub-paragraph (a).

(3) A copy of the ship’s Berth List shall be supplied to the Maritime and Coastguard Agency.

(4) No ro-ro passenger ship shall, except in an emergency, load or discharge cargo or vehicles through a loading door at any berth which is not listed in the ship’s Berth List (and in the copy thereof supplied to the Maritime and Coastguard Agency).

Commencement Information

I7Reg. 27 in force at 12.11.1998, see reg. 1

Written instructions regarding the opening of weathertight doorsU.K.

28.—(1) The owner of a ship shall ensure that the ship is provided with written instructions concerning the doors referred to in this Part.

(2) Such written instructions shall be approved by the Certifying Authority.

Commencement Information

I8Reg. 28 in force at 12.11.1998, see reg. 1

Compliance with written instructionsU.K.

29.  No door shall be opened or closed except in compliance with the written instructions provided in accordance with regulation 28.

Commencement Information

I9Reg. 29 in force at 12.11.1998, see reg. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.