- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
Article 3
WORK No. 1
A footbridge across the River Thames, together with new caissons and islands, incorporating stairs, lifts and lighting upstream of and supported by Charing Cross Railway Bridge together with associated structures between the northern bank of the River Thames at Ordnance Survey reference point TQ 30388031 and the southern bank of the River Thames at Ordnance Survey reference point TQ 30688017 incorporating stairs from Ordnance Survey reference point TQ 30688017 to Ordnance Survey reference point TQ 30688015.
WORK No. 2
A footbridge across the River Thames, together with new caissons and islands, incorporating stairs, lifts and lighting downstream of and supported by Charing Cross Railway Bridge together with associated structures between the northern bank of the River Thames at Ordnance Survey reference point TQ 30428035 and the southern bank of the River Thames at Ordnance Survey reference point TQ 30708022 incorporating stairs from Ordnance Survey reference point TQ 30428035 to Ordnance Survey reference point TQ 30428036, from Ordnance Survey reference point TQ 30708022 to Ordnance Survey reference point TQ 30718023 and from Ordnance Survey reference point TQ 30708022 to Ordnance Survey reference point TQ 30718021.
WORK No. 3
A footbridge over the River Thames upstream of Charing Cross Railway Bridge together with associated supports, works to the river wall and structures between the southern bank of the River Thames at Ordnance Survey reference point TQ 30658013 and the Surrey Pier of Charing Cross Railway Bridge at Ordnance Survey reference point TQ 30618020.
WORK No. 4
A footbridge over the River Thames downstream of Charing Cross Railway Bridge together with associated supports, works to the river wall and structures between the southern bank of the River Thames at Ordnance Survey reference point TQ 30728026 and the Surrey Pier of Charing Cross Railway Bridge at Ordnance Survey reference point TQ 30648025.
WORK No. 5
Renovation and replacement of existing footbridge west of Work No. 2 and above the existing Embankment Station, between Embankment Place and Victoria Embankment together with the construction of a lift in Embankment Place such works being between Ordnance Survey reference points TQ 30398037 and TQ 30428035.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys