Articles 2(1), 3(1) and (2) and 4
1. The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of the North Sea adjoining the coast at Clacton-on-Sea in the district of Tendring, county of Essex—
(a)up to 30 wind turbine generators fixed to the seabed by up to four piles for each wind turbine and extending to a height of up to 130.5 metres above the level of high water, fitted with rotating blades with a diameter of up to 110 metres and situated at the following reference points—
Wind turbine number | Reference Point Easting | Reference Point Northing |
---|---|---|
1 | 620259 | 208141 |
2 | 621150 | 206647 |
3 | 620937 | 207023 |
4 | 620717 | 207392 |
5 | 620497 | 207763 |
6 | 620992 | 208646 |
7 | 623927 | 210669 |
8 | 624814 | 209182 |
9 | 624591 | 209553 |
10 | 624371 | 209924 |
11 | 624151 | 210297 |
12 | 623193 | 210164 |
13 | 624080 | 208675 |
14 | 623860 | 209044 |
15 | 623641 | 209415 |
16 | 623419 | 209783 |
17 | 622459 | 209658 |
18 | 623346 | 208168 |
19 | 623125 | 208539 |
20 | 622906 | 208911 |
21 | 622682 | 209283 |
22 | 621726 | 209152 |
23 | 622614 | 207660 |
24 | 622393 | 208032 |
25 | 622174 | 208404 |
26 | 621951 | 208777 |
27 | 621881 | 207154 |
28 | 621663 | 207525 |
29 | 621442 | 207894 |
30 | 621222 | 208261 |
(b)a substation at reference point 622794E, 209097N with a height of 42 metres above the level of high water and a span of 24 metres (accommodating transformers, switch gear, back-up generators and other technical installations);
(c)a network of cables buried under the seabed connecting the wind turbines to the substation, to run in direct lines as follows—
between the wind turbines numbered 2, 3, 4, 5, 1, 6, 22, 17, 21 and the substation,
between the wind turbines numbered 28, 29, 30 and 6,
between the wind turbines numbered 27, 23, 24, 25, 26 and 21,
between the wind turbines numbered 18, 19, 20 and the substation,
between the wind turbines numbered 13, 14, 15, 16, 12 and 17, and
between the wind turbines numbered 8, 9, 10, 11, 7 and 12;
(d)a cable buried at a depth of 3 metres below the level of the seabed connecting the substation to the shore, commencing by a connection with that substation then proceeding in a north-north-westerly direction until it reaches the shore at Holland-on-Sea at reference point 621460E, 216855N.
2. In this schedule references to the location of a wind turbine or the substation are references to the centre point of that turbine or substation.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys