Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART 9E+WVARIATION AND TERMINATION OF AGREEMENTS

60.—(1) Subject to paragraph 32(3), no amendment or variation shall have effect unless it is in writing and signed by or on behalf of [F1the Board] and the contractor.E+W

(2) In addition to the specific provision made in paragraph 73, [F1the Board] may vary the agreement without the contractor's consent where it—

(a)is reasonably satisfied that it is necessary to vary the agreement so as to comply with the Act, any regulations made pursuant to that Act, or any direction given by the Secretary of State pursuant to that Act; and

(b)notifies the contractor in writing of the wording of the proposed variation and the date upon which that variation is to take effect,

and, where it is reasonably practicable to do so, the date that the proposed variation is to take effect shall be not less than 14 days after the date on which the notice under paragraph (b) is served on the contractor.

Variation of an agreement: activity under the agreementE+W

61.—(1) Where the contractor or [F2the Board] is of the opinion that there needs to be a variation to the number of—

(a)units of dental activity; or

(b)units of orthodontic activity,

to be provided under the agreement, sub-paragraphs (2) and (3) shall apply.

(2) The contractor or [F2the Board] shall notify the other party to the agreement in writing of its opinion of the need for a variation, specifying in that notice the variation that it considers necessary, together with its reasons.

(3) Following service of the notice referred to in sub-paragraph (2), both parties shall use their best endeavours to communicate and co-operate with each other with a view to determining what (if any) variation should be made to the number of—

(a)units of dental activity; or

(b)units of orthodontic activity,

and any related variations to the agreement, including to the monies to be paid to the contractor under the agreement, and shall where appropriate effect the variation in accordance with paragraph 60.

Termination by agreementE+W

62.  [F3The Board] and the contractor may agree in writing to terminate the agreement, and if the parties so agree, they shall agree the date upon which that termination should take effect and any further terms upon which the agreement should be terminated.

Termination on the death of an individualE+W

63.—(1) Where the agreement is with a single individual and that individual dies, the agreement shall terminate at the end of the period of [F428 days] after the date of his death unless, before the end of that period—

(a)subject to sub-paragraph (2), [F5the Board] has agreed in writing with that individual's personal representatives that the agreement should continue for a further period, [F6not exceeding 6 months] after the end of the period of [F428 days]; and

(b)that individual's personal representatives have confirmed in writing to [F5the Board] that they are employing or engaging one or more dental practitioners to assist in the provision of dental services under the agreement throughout the period for which it continues.

(2) Where [F7the Board] is of the opinion that another individual may wish to enter into an agreement in respect the mandatory services which were provided by the deceased, the [F86 month period] referred to in sub-paragraph (1)(a) may be extended by a period not exceeding six months as may be agreed.

(3) Sub-paragraph (1) does not affect any other rights to terminate the agreement which [F7the Board] may have under paragraphs 67 to 71.

Termination by the contractorE+W

64.—(1) A contractor may terminate the agreement by serving notice in writing on [F9the Board] at any time.

(2) Where a contractor serves notice pursuant to sub-paragraph (1), the agreement shall terminate three months after the date on which the notice is served (“the termination date”), save that if the termination date is not the last calendar day of a month, the agreement shall instead terminate on the last calendar day of the month in which the termination date falls.

(3) This paragraph and paragraph 65 are without prejudice to any other rights to terminate the agreement that the contractor may have.

Late payment noticesE+W

65.—(1) The contractor may give notice in writing (a “late payment notice”) to [F10the Board] if [F10the Board] has failed to make any payments due to the contractor in accordance with a term of the agreement that has the effect specified in regulation 17, and the contractor shall specify in the late payment notice the payments that [F10the Board] has failed to make in accordance with that regulation.

(2) Subject to sub-paragraph (3), the contractor may, at least 28 days after having served a late payment notice, terminate the agreement by a further written notice if [F10the Board] has still failed to make the payments that were due to the contractor and that were specified in the late payment notice served on [F10the Board] pursuant to sub-paragraph (1).

(3) If, following receipt of a late payment notice, [F10the Board] refers the matter to the NHS dispute resolution procedure within 28 days of the date upon which it is served with the late payment notice, and it notifies the contractor in writing that it has done so within that period of time, the contractor may not terminate the agreement pursuant to sub-paragraph (2) until—

(a)there has been a determination of the dispute pursuant to paragraph 56 and that determination permits the contractor to terminate the agreement; or

(b)[F10the Board] ceases to pursue the NHS dispute resolution procedure,

(c)whichever is the sooner.

Termination by [F11the Board]: general provisionsE+W

66.  [F12The Board] may only terminate the agreement in accordance with the provisions in this Part.

Termination by [F13the Board]: noticeE+W

67.—(1) [F14The Board] may terminate the agreement by serving notice in writing on the contractor at any time.

(2) Where a notice is served pursuant to sub-paragraph (1), the agreement shall terminate on the date provided for in the agreement.

Termination by [F15the Board] for the provision of untrue etc. informationE+W

68.  [F16The Board] may serve notice in writing on the contractor terminating the agreement forthwith, or from such date as may be specified in the notice if, after the agreement has been entered into, it comes to the attention of [F16the Board] that written information provided to it by the contractor before the agreement was entered into in relation to the conditions set out in regulation 4 or 5 (and compliance with those conditions) was, when given, untrue or inaccurate in a material respect.

Termination by [F17the Board] on grounds of suitability etc.E+W

69.—(1) [F18The Board] may serve notice in writing on the contractor terminating the agreement forthwith, or from such date as may be specified in the notice if—

(a)in the case of an agreement with an individual as a party, that individual;

[F19(b)in the case of an agreement with a dental corporation, any director, chief executive or secretary of that corporation;

(c)in the case of a company limited by shares, any director, chief executive or secretary of that company; or

(d)in the case of a limited liability partnership, any member of that partnership.]

(2) A person falls within this sub-paragraph if—

(a)he or it is the subject of a national disqualification;

(b)subject to sub-paragraph (3), he or it is disqualified or suspended (other than by an interim suspension order or direction pending an investigation or a suspension on the grounds of ill-health) from practising by any licensing body anywhere in the world;

(c)subject to sub-paragraph (4), he has been dismissed (otherwise than by reason of redundancy) from any employment by a health service body unless before [F20the Board] has served a notice terminating the agreement pursuant to this paragraph, he is employed by the health service body that dismissed him or by another health service body;

(d)he or it is removed from, or refused admission to, a primary care list by reason of inefficiency, fraud or unsuitability (within the meaning of section 49F(2), (3) and (4) of the Act M1 respectively) unless his name has subsequently been included in such a list;

(e)he has been convicted in the United Kingdom of—

(i)murder; or

(ii)a criminal offence other than murder, committed on or after 14th December 2001, and has been sentenced to a term of imprisonment of over six months;

(f)subject to sub-paragraph (5), he has been convicted outside the United Kingdom of an offence—

(i)which would, if committed in England and Wales, constitute murder; or

(ii)committed on or after 14th December 2001, which would if committed in England and Wales, constitute a criminal offence other than murder, and been sentenced to a term of imprisonment of over six months;

(g)he has been convicted of an offence referred to in Schedule 1 to the Children and Young Persons Act 1933 M2 (offences against children and young persons with respect to which special provisions of this Act apply) or Schedule 1 to the Criminal Procedure (Scotland) Act 1995 M3 (offences against children under the age of 17 years to which special provisions apply);

(h)he or it has—

(i)been [F21made] bankrupt or had sequestration of his estate awarded [F22or is a person in relation to whom a moratorium period under a debt relief order (under Part 7A of the Insolvency Act 1986) applies] unless F23... he has been discharged [F24from the bankruptcy or the sequestration] or the bankruptcy order has been annulled;

(ii)been made the subject of a bankruptcy restrictions order or an interim bankruptcy restrictions order under Schedule 4A[F25, or a debt relief restrictions order or interim debt relief restrictions order under Schedule 4ZB,] to the Insolvency Act 1986 M4, unless that order has ceased to have effect or has been annulled;

(iii)made a composition or arrangement with, or granted a trust deed for, his or its creditors unless he or it has been discharged in respect of it; or

(iv)been wound up under Part 4 of the Insolvency Act 1986;

(i)there is—

(i)an administrator, administrative receiver or receiver appointed in respect of it; or

(ii)an administration order made in respect of it under Schedule B1 to the Insolvency Act 1986 M5;

(j)he has been—

(i)removed from the office of charity trustee or trustee for a charity by an order made by the Charity Commissioners or the High Court on the grounds of any misconduct or mismanagement in the administration of the charity for which he was responsible or to which he was privy, or which he by his conduct contributed to or facilitated; or

(ii)removed under section 7 of the Law Reform (Miscellaneous Provisions) (Scotland) Act 1990 M6 (powers of the Court of Session to deal with management of charities) [F26or under section 34 of the Charities and Trustee Investment (Scotland) Act 2005 (powers of Court of Session)], from being concerned in the management or control of any body;

(k)he is subject to a disqualification order under the Company Directors Disqualification Act 1986 M7, the Companies (Northern Ireland) Order 1986 M8 or to an order made under section 429(2)(b) of the Insolvency Act 1986 (failure to pay under county court administration order); or

(l)he has refused to comply with a request by [F27the Board] for him to be medically examined on the ground that it is concerned that he is incapable of adequately providing services under the agreement.

(3) [F28The Board] shall not terminate the agreement pursuant to sub-paragraph (2)(b) where it is satisfied that the disqualification or suspension imposed by a licensing body outside the United Kingdom does not make the person unsuitable to be—

(a)a contractor; F29...

[F30(b)in the case of an agreement with a dental corporation, any director, chief executive or secretary of that corporation;

(c)in the case of a company limited by shares, any director, chief executive or secretary of that company; or

(d)in the case of a limited liability partnership, any member of that partnership.]

(4) [F31The Board] shall not terminate the agreement pursuant to sub-paragraph (2)(c)—

(a)until a period of at least three months has elapsed since the date of the dismissal of the person concerned; or

(b)if, during the period of time specified in paragraph (a), the person concerned brings proceedings in any competent tribunal or court in respect of his dismissal, until proceedings before that tribunal or court are concluded,

and [F31the Board] may only terminate the agreement at the end of the period specified in paragraph (b) if there is no finding of unfair dismissal.

(5) [F32The Board] shall not terminate the agreement pursuant to sub-paragraph (2)(f) where it is satisfied that the conviction does not make the person unsuitable to be—

(a)a contractor; F33...

[F34(b)in the case of an agreement with a dental corporation, any director, chief executive or secretary of that corporation;

(c)in the case of a company limited by shares, any director, chief executive or secretary of that company; or

(d)in the case of a limited liability partnership, any member of that partnership.]

Textual Amendments

Marginal Citations

M1Section 49F was inserted into the Act by section 25 of the 2001 Act and amended by the 2002 Act, Schedule 3, paragraph 21; and the 2003 Act, Schedule 14, Part 2.

M21933 c. 12; as amended by the Domestic Violence, Crime and Victims Act 2004 (c. 28), section 58(1), Schedule 10, paragraph 2; the Sexual Offences Act 2003 (c. 42), section 139 and Schedule 6, paragraph 7; the Criminal Justice Act 1988 (c. 33), section 170 and Schedule 15, paragraph 8 and Schedule 16, paragraph 16; and the Sexual Offences Act 1956 (c. 69), sections 48 and 51 and Schedules 3 and 4; as modified by the Criminal Justice Act 1988, section 170(1), Schedule 15, paragraph 9.

M41986 c. 45. Schedule 4A was inserted by section 257 of, and Schedule 3 to, the Enterprise Act 2002 (c. 40).

M5Schedule B1 was inserted by section 248 of, and Schedule 16 to, the Enterprise Act 2002.

Termination by [F35the Board]: patient safety and material financial lossE+W

70.  [F36The Board] may serve notice in writing on the contractor terminating the agreement forthwith or with effect from such date as may be specified in the notice if—

(a)the contractor has breached the agreement and as a result of that breach, the safety of the contractor's patients is at serious risk if the agreement is not terminated; or

(b)the contractor's financial situation is such that [F36the Board] considers that [F36the Board] is at risk of material financial loss.

Termination by [F37the Board]: remedial notices and breach noticesE+W

71.—(1) Where a contractor has breached the agreement other than as specified in paragraphs 68 to 70 and the breach is capable of remedy, [F38the Board] shall, before taking any action it is otherwise entitled to take by virtue of the agreement, serve a notice on the contractor requiring it to remedy the breach (“remedial notice”).

(2) A remedial notice shall specify—

(a)details of the breach;

(b)the steps the contractor must take to the satisfaction of [F39the Board] in order to remedy the breach; and

(c)the period during which the steps must be taken (“the notice period”).

(3) The notice period shall, unless [F40the Board] is satisfied that a shorter period is necessary to—

(a)protect the safety of the contractor's patients; or

(b)protect itself from material financial loss,

be no less than 28 days from the date that notice is given.

(4) Where [F41the Board] is satisfied that the contractor has not taken the required steps to remedy the breach by the end of the notice period, [F40the Board] may terminate the agreement with effect from such date as [F40the Board] may specify in a further notice to the contractor.

(5) Where a contractor has breached the agreement otherwise than as specified in paragraphs 68 to 70 and the breach is not capable of remedy, [F40the Board] may serve notice on the contractor requiring the contractor not to repeat the breach (“breach notice”).

(6) If, following a breach notice or a remedial notice, the contractor—

(a)repeats the breach that was the subject of the breach notice or the remedial notice; or

(b)otherwise breaches the agreement resulting in either a remedial notice or a further breach notice,

[F40the Board] may serve notice on the contractor terminating the agreement with effect from such date as may be specified in that notice.

(7) [F40The Board] shall not exercise its right to terminate the agreement under sub-paragraph (6) unless it is satisfied that the cumulative effect of the breaches is such that [F40the Board] considers that to allow the agreement to continue would be prejudicial to the efficiency of the services to be provided under the agreement.

(8) If the contractor is in breach of any obligation and a breach notice or a remedial notice in respect of that default has been given to the contractor, [F40the Board] may withhold or deduct monies which would otherwise be payable under the agreement in respect of that obligation which is the subject of the default.

[F42Termination by the Board: additional provisions specific to contracts with dental corporations, companies limited by shares and limited liability partnerships]E+W

72.—(1) Where a party to the agreement is a [F43dental corporation, company limited by shares, or limited liability partnership], if [F44the Board] becomes aware that the [F43dental corporation, company limited by shares, or limited liability partnership] is carrying on any business which [F44the Board] considers to be detrimental to the contractor's performance of its obligations under the agreement—

(a)[F44the Board] shall be entitled to give notice to the contractor requiring that the [F43dental corporation, company limited by shares, or limited liability partnership] ceases carrying on that business before the end of a period of not less than 28 days beginning on the day on which the notice is given (“the notice period”); and

(b)if the contractor has not satisfied [F44the Board] that the [F43dental corporation, company limited by shares, or limited liability partnership] has ceased carrying on that business by the end of the notice period, [F44the Board] may, by a further written notice, terminate the agreement forthwith or from such date as may be specified in the notice.

(2) Where the contractor is a [F45dental corporation or company limited by shares] and on or after the coming into force for all purposes of article 39 of the Dentists Act Order during the existence of the agreement—

(a)the majority of the directors of the [F45dental corporation or company limited by shares] cease to be either dental practitioners or dental care professionals;

(b)the [F45dental corporation or company limited by shares] has been convicted of an offence under section 43(1) of the Dentists Act M9 (directors of bodies corporate); or

(c)the [F45dental corporation or company limited by shares], or a director or former director of that [F45dental corporation or company limited by shares], has had a financial penalty imposed on it or him by the General Dental Council pursuant to section 43B (financial penalties in relation to bodies corporate) or 44 M10 (further financial penalties on bodies corporate) of the Dentists Act,

[F46the Board] may, by written notice, terminate the agreement if it considers that as a consequence the [F45dental corporation or company limited by shares] is no longer suitable to be a contractor.

[F47(3) Where the contractor is a company limited by shares and the company ceases—

(a)to be a company limited by shares; or

(b)to satisfy the conditions in section 108(1A) of the 2006 Act,

the Board shall serve notice in writing on the contractor terminating the contract forthwith.

(4) Where the contractor is a limited liability partnership and—

(a)the partnership ceases to be a limited liability partnership; or

(b)section 108(1B) or (1C) of the 2006 Act ceases to apply in respect of that partnership,

the Board shall serve notice in writing on the contractor terminating the contract forthwith.]

Textual Amendments

Marginal Citations

M9Section 43 of the Dentists Act 1984 is substituted by the Dentists Act Order 2005, article 39.

M10Section 43B is inserted into, and section 44 is, substituted by the Dentists Act Order, article 39.

Agreement sanctionsE+W

73.—(1) In this paragraph and paragraph 74, “agreement sanction” means—

(a)termination of specified reciprocal obligations under the agreement;

(b)suspension of specified reciprocal obligations under the agreement for a period of up to six months; or

(c)withholding or deducting monies otherwise payable under the agreement.

(2) Where [F48the Board] is entitled to terminate the agreement pursuant to paragraph 68, 69, 70, 71(4), 71(6) or 72, it may instead impose any of the agreement sanctions if [F48the Board] is reasonably satisfied that the agreement sanction to be imposed is appropriate and proportionate to the circumstances which provide grounds for [F48the Board] to terminate the agreement.

(3) If [F48the Board] decides to impose an agreement sanction, it must notify the contractor of the agreement sanction that it proposes to impose, the date upon which that sanction will be imposed and provide in that notice an explanation of the effect of the imposition of that sanction.

(4) Subject to paragraph 74, [F48the Board] shall not impose the agreement sanction until at least 28 days after it has served notice on the contractor pursuant to sub-paragraph (3) unless it is satisfied that it is necessary to do so in order to—

(a)protect the safety of the contractor's patients; or

(b)protect itself from material financial loss.

(5) Where [F48the Board] imposes an agreement sanction, it shall be entitled to charge the contractor the reasonable costs of additional administration that [F48the Board] has incurred in order to impose, or as a result of imposing, the agreement sanction.

Agreement sanctions and the NHS dispute resolution procedureE+W

74.—(1) If there is a dispute between [F49the Board] and the contractor in relation to an agreement sanction that [F49the Board] is proposing to impose, [F49the Board] shall not, subject to sub-paragraph (4), impose the proposed agreement sanction except in the circumstances specified in sub-paragraph (2).

(2) If the contractor refers the dispute relating to the agreement sanction to the NHS dispute resolution procedure within 28 days beginning on the date on which [F49the Board] served notice on the contractor in accordance with paragraph 73(3) (or such longer period as may be agreed in writing with [F49the Board]), and notifies [F49the Board] in writing that it has done so, [F49the Board] shall not impose the agreement sanction unless—

(a)there has been a determination of the dispute pursuant to paragraph 56 and that determination permits [F49the Board] to impose the agreement sanction; or

(b)the contractor ceases to pursue the NHS dispute resolution procedure,

whichever is the sooner.

(3) If the contractor does not invoke the NHS dispute resolution procedure within the time specified in sub-paragraph (2), [F49the Board] shall be entitled to impose the agreement sanction forthwith.

(4) If [F49the Board] is satisfied that it is necessary to impose the agreement sanction before the NHS dispute resolution procedure is concluded in order to—

(a)protect the safety of the contractor's patients; or

(b)protect itself from material financial loss,

[F49the Board] shall be entitled to impose the agreement sanction forthwith, pending the outcome of that procedure.

Termination and the NHS dispute resolution procedureE+W

75.—(1) Where [F50the Board] is entitled to serve written notice on the contractor terminating the agreement pursuant to paragraph 68, 69, 70, 71(4), 71(6) or 72, it shall, in the notice served on the contractor pursuant to those provisions, specify a date on which the agreement terminates that is not less than 28 days after the date on which [F50the Board] has served that notice on the contractor unless sub-paragraph (2) applies.

(2) This sub-paragraph applies if [F50the Board] is satisfied that a period less than 28 days is necessary in order to—

(a)protect the safety of the contractor's patients; or

(b)protect itself from material financial loss.

(3) In a case falling with sub-paragraph (1), where—

(a)the exceptions in sub-paragraph (2) do not apply;

(b)the contractor invokes the NHS dispute resolution procedure before the end of the period of notice referred to in sub-paragraph (1); and

(c)the contractor notifies [F50the Board] in writing that it has done so,

the agreement shall not terminate at the end of the notice period but instead shall only terminate in the circumstances specified in sub-paragraph (4).

(4) The agreement shall only terminate if and when—

(a)there has been a determination of the dispute pursuant to paragraph 56 and that determination permits [F51the Board] to terminate the agreement; or

(b)the contractor ceases to pursue the NHS dispute resolution procedure,

whichever is the sooner.

(5) If [F52the Board] is satisfied that it is necessary to terminate the agreement before the NHS dispute resolution procedure is concluded in order to—

(a)protect the safety of the contractor's patients; or

(b)protect itself from material financial loss,

sub-paragraphs (3) and (4) shall not apply and [F52the Board] shall be entitled to confirm, by written notice to be served on the contractor, that the agreement will nevertheless terminate at the end of the period of the notice it served pursuant to paragraph 68, 69, 70, 71(4), 71(6) or 72.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill