3.Prohibition on granting consent without consideration of environmental information
5.When development is EIA development: directions by the Secretary of State
6.Procedure for establishing whether environmental impact assessment is required
9.Procedure to facilitate preparation of environmental statements
11.Pre-application publicity under section 48 (duty to publicise)
12.Obligations of Secretary of Stateon receipt of application
13.Accepted application - publicity and consultation for EIA development
16.Accepted application - effect of screening opinion not taking account of all relevant information
17.Accepted application - effect of environmental statement being inadequate
18A.Subsequent application where environmental information previously provided
19.Subsequent application not complying with EIA requirements
22.Availability of directions etc and notification of decisions
23.Duties to inform the consultees, public and the Secretary of State of final decisions
1.Crude-oil refineries (excluding undertakings manufacturing only lubricants from crude oil)...
2.(a) Thermal power stations and other combustion installations with a...
3.(a) Installations for the reprocessing of irradiated nuclear fuel.
4.(a) Integrated works for the initial smelting of cast-iron and...
5.Installations for the extraction of asbestos and for the processing...
6.Integrated chemical installations, that is to say, installations for the...
7.(a) Construction of lines for long-distance railway traffic and of...
8.(a) Inland waterways and ports for inland-waterway traffic which permit...
9.Waste disposal installations for the incineration, chemical treatment (as defined...
10.Waste disposal installations for the incineration or chemical treatment (as...
11.Groundwater abstraction or artificial groundwater recharge schemes where the annual...
12.(a) Works for the transfer of water resources, other than...
13.Waste water treatment plants with a capacity exceeding 150,000 population...
14.Extraction of petroleum and natural gas for commercial purposes where...
15.Dams and other installations designed for the holding back or...
16.Pipelines with a diameter of more than 800 millimetres and...
17.Installations for the intensive rearing of poultry or pigs with...
18.Industrial plants for— (a) the production of pulp from timber...
19.Quarries and open-cast mining where the surface of the site...
20.Construction of overhead electrical power lines with a voltage of...
21.Installations for storage of petroleum, petrochemical or chemical products with...
22.Any change to or extension of development listed in this...
23.Storage sites pursuant to Directive 2009/31/ EC of the European...
24.Installations for the capture of carbon dioxide streams for the...
Descriptions of development for the purposes of the definition of “Schedule 2 development”
1.Agriculture, silviculture and aquaculture (a) Projects for the restructuring of...
2.Extractive industry (a) Quarries, open-cast mining and peat extraction (where...
3.Energy industry (a) Industrial installations for the production of electricity,...
4.Production and processing of metals (a) Installations for the production...
7.Food industry (a) Manufacture of vegetable and animal oils and...
8.Textile, leather, wood and paper industries (a) Industrial plants for...
9.Rubber industry Manufacture and treatment of elastomer-based products.
10.Infrastructure projects (a) Industrial estate development projects;
11.Other projects (a) Permanent racing and test tracks for motorised...
12.Tourism and leisure (a) Ski-runs, ski-lifts and cable-cars and associated...
Information for inclusion in environmental statements
18.An outline of the main alternatives studied by the applicant...
19.A description of the aspects of the environment likely to...
20.A description of the likely significant effects of the development...
21.A description of the measures envisaged to prevent, reduce and...
22.A non-technical summary of the information provided under paragraphs 1...
23.An indication of any difficulties (technical deficiencies or lack of...
24.A description of the development comprising information on the site,...
25.A description of the measures envisaged in order to avoid,...
26.The data required to identify and assess the main effects...
27.An outline of the main alternatives studied by the applicant...
28.A non-technical summary of the information provided under paragraphs 1...