Print Options
PrintThe Whole
Instrument
PrintThis
Schedule
only
Changes over time for: SCHEDULE 4


Llinell Amser Newidiadau
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Status:
Point in time view as at 31/12/2022.
Changes to legislation:
There are currently no known outstanding effects for the The Toys (Safety) Regulations 2011, SCHEDULE 4.

Changes to Legislation
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Regulations 3B and 17(3)
[SCHEDULE 4E+W+STECHNICAL DOCUMENTATION (Annex IV to the Directive)
This
Atodlen has no associated
Memorandwm Esboniadol
The technical documentation referred to in regulation 17(3) must contain so far as relevant for assessment:
(a)a detailed description of the design and manufacture, including a list of components and materials used in the toy as well as the safety data sheets on chemicals used, to be obtained from the chemical suppliers;
(b)the safety assessment(s) carried out in accordance with regulation 12.
(c)a description of the conformity assessment procedure followed;
(d)a copy of the declaration of conformity;
(e)the addresses of the places of manufacture and storage;
(f)copies of documents that the manufacturer has submitted to an approved body, if involved;
(g)test reports and description of the means whereby the manufacturer ensured conformity of production with designated standards, if the manufacturer followed the internal production control procedure set out in Module A; and
(h)a copy of the Type examination certificate, a description of the means whereby the manufacturer ensured conformity of the production with the product type as described in the Type examination certificate, and copies of the documents that the manufacturer submitted to the approved body, if the manufacturer submitted the toy to Type examination and followed the conformity to type procedure set out in Module C.]