Chwilio Deddfwriaeth

The Storage of Carbon Dioxide (Access to Infrastructure) Regulations 2011

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: SCHEDULE

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Storage of Carbon Dioxide (Access to Infrastructure) Regulations 2011, SCHEDULE. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulation 22

SCHEDULEU.K.Amendments

This Atodlen has no associated Memorandwm Esboniadol

Pipe-lines Act 1962U.K.

1.  The Pipe-lines Act 1962 is amended as follows.U.K.

Commencement Information

I1Sch. para. 1 in force at 16.9.2011, see reg. 1

2.  In section 9 (provisions for securing that a pipe-line is so constructed as to reduce necessity for construction of others)(1), for subsection (6), substitute—U.K.

(6) This section does not apply where the application for the grant of a pipe-line construction authorisation relates to the construction of—

(a)a diversion, or

(b)a carbon dioxide pipe-line..

Commencement Information

I2Sch. para. 2 in force at 16.9.2011, see reg. 1

3.  In section 9A (provisions for securing that an additional pipe-line is so constructed as to reduce necessity for construction of other pipe-lines)(2), after subsection (1), insert—U.K.

(1ZA) This section does not apply where the application for the grant of planning permission relates to the construction of a carbon dioxide pipe-line..

Commencement Information

I3Sch. para. 3 in force at 16.9.2011, see reg. 1

4.  In section 10 (provisions for securing that a pipe-line is so used as to reduce necessity for construction of others)(3)—U.K.

(a)for paragraph (b) of subsection (1), substitute—

(b)any other pipe-line which—

(i)is constructed pursuant to a pipe-line construction authorisation; and

(ii)does not fall within subsection (1A);;

(b)after subsection (1), insert—

(1A) The following pipe-lines fall within this subsection—

(a)an upstream petroleum pipe-line;

(b)a carbon dioxide pipe-line;

(c)a pipe-line comprised in a gas interconnector.; and

(c)in subsection (2), for “the foregoing subsection”, substitute “subsection (1)”.

Commencement Information

I4Sch. para. 4 in force at 16.9.2011, see reg. 1

5.  In section 65 (meaning of “pipe-line”)(4)—U.K.

(a)in subsection (2), after paragraph (f), insert—

(fa)in relation only to a pipe, or system of pipes, which is used to convey carbon dioxide to a carbon dioxide storage site, apparatus for treating and cooling carbon dioxide which is to flow through, or through any part of, the pipe or system;; and

(b)after subsection (2), insert—

(3) In subsection (2)(fa), the reference to a pipe, or system of pipes, being used to convey carbon dioxide includes a pipe or system which is not being used for any purpose but which is intended to be used to convey carbon dioxide..

Commencement Information

I5Sch. para. 5 in force at 16.9.2011, see reg. 1

6.  In section 66(1) (interpretation)(5), after the definition of “agricultural unit”, insert—U.K.

“carbon dioxide pipe-line” means—

(a)

a pipe-line used to convey carbon dioxide to a carbon dioxide storage site; or

(b)

a pipe-line which is not being used for any purpose but which is intended to be used to convey carbon dioxide to such a site;

“carbon dioxide storage site” means a facility—

(a)

for the storage of carbon dioxide (with a view to its permanent disposal, or as an interim measure prior to its permanent disposal); and

(b)

in respect of the use of which a person is required to have a licence under section 18 of the Energy Act 2008;.

Commencement Information

I6Sch. para. 6 in force at 16.9.2011, see reg. 1

Petroleum Act 1998U.K.

7.  The Petroleum Act 1998 is amended as follows.U.K.

Commencement Information

I7Sch. para. 7 in force at 16.9.2011, see reg. 1

8.  In section 15 (authorisations)(6)—U.K.

(a)in subsection (3)(c)(i) and (iii), at the end insert “(subject to subsection (3A))”;

(b)after subsection (3), insert—

(3A) The power conferred by virtue of paragraph (c)(i) or (iii) of subsection (3) is not exercisable to the extent that the powers conferred by regulation 7 of the Storage of Carbon Dioxide (Access to Infrastructure) Regulations 2011 are exercisable.;

(c)in subsection (5), at the beginning insert “Subject to subsection (5A),”; and

(d)after subsection (5), insert—

(5A) Subsection (6) does not apply where the term is a variation condition imposed by virtue of regulation 7 of the Storage of Carbon Dioxide (Access to Infrastructure) Regulations 2011..

Commencement Information

I8Sch. para. 8 in force at 16.9.2011, see reg. 1

9.  In section 16 (compulsory modifications of pipelines)(7), before subsection (1), insert—U.K.

(A1) This section applies to controlled pipelines, other than those which are excepted from the operation of this section.

(A2) Controlled carbon dioxide pipelines are excepted from the operation of this section. .

Commencement Information

I9Sch. para. 9 in force at 16.9.2011, see reg. 1

10.  In section 17 (acquisition of rights to use pipelines)(8), after subsection (1A) insert—U.K.

(1B) This section also does not apply to controlled carbon dioxide pipelines..

Commencement Information

I10Sch. para. 10 in force at 16.9.2011, see reg. 1

11.  In section 28(1) (interpretation of Part 3 of the Petroleum Act 1998)(9)—U.K.

(a)in the appropriate place, insert—

“carbon dioxide storage site” means a facility—

(a)

for the storage of carbon dioxide (with a view to its permanent disposal, or as an interim measure prior to its permanent disposal); and

(b)

in respect of the use of which a person is required to have a licence under section 18 of the Energy Act 2008;; and

“controlled carbon dioxide pipeline” means any controlled pipeline or one of a network of controlled pipelines—

(a)

which is used to convey carbon dioxide to a carbon dioxide storage site, or

(b)

which is not being used for any purpose but which is intended to be used to convey carbon dioxide to such a site;; and

(b)for the definition of “controlled petroleum pipeline”, substitute—

“controlled petroleum pipeline” means any controlled pipeline or one of a network of controlled pipelines—

(a)

which is operated or constructed as part of a petroleum production project and is not a controlled carbon dioxide pipeline; or

(b)

which is used to convey petroleum from the site of one or more such projects—

(i)

directly to premises, in order for that petroleum to be used at those premises for power generation or for an industrial process;

(ii)

directly to a place outside Great Britain;

(iii)

directly to a terminal; or

(iv)

indirectly to a terminal by way of one or more other terminals, whether or not such intermediate terminals are of the same kind as the final terminal;.

Commencement Information

I11Sch. para. 11 in force at 16.9.2011, see reg. 1

12.  In paragraph 4 of Schedule 2—U.K.

(a)in sub-paragraph (1), at the beginning, insert “Subject to sub-paragraph (1A),”; and

(b)after sub-paragraph (1), insert—

(1A) This paragraph does not apply to the extent that the powers conferred by regulation 7 of the Storage of Carbon Dioxide (Access to Infrastructure) Regulations 2011 are exercisable in relation to the matters mentioned in sub-paragraph (1)(a) or (b)..

Commencement Information

I12Sch. para. 12 in force at 16.9.2011, see reg. 1

(1)

Section 9 was amended by paragraph 6 of the Schedule to the Deregulation (Pipe-lines) Order 1999. paragraph 1 of Schedule 1 to the Gas (Third Party Access and Accounts) Regulations 2000 (S.I. 2000/1937) and section 151(1) of the Energy Act 2004 (c. 20), . It was modified, in respect of the maximum fine, by sections 37, 38 and 46 of Criminal Justice Act 1982. An amendment by Schedule 23 to the Energy Act 2004 (c. 20) is not yet in force.

(2)

Section 9A was inserted by paragraph 7 of the Schedule to the Deregulation (Pipe-lines) Order 1999 and was amended by paragraph 2 of Schedule 1 to the Gas (Third Party Access and Accounts) Regulations 2000 and section 151(1) of the Energy Act 2004. An amendment by Schedule 23 to the Energy Act 2004 (is not yet in force.

(3)

Section 10(1) was amended by paragraph 3 of Schedule 1 to the Gas (Third Party Access and Accounts) Regulations 2000 and by section 151(2) of the Energy Act 2004.

(4)

Section 65(2) was amended by paragraph 8 of Schedule 1 to the Gas (Third Party Access and Accounts) Regulations 2000.

(5)

Section 66(1) has been amended by regulation 2(2)(b) of the Pipe-lines (Metrication) Regulations 1992 (S.I. 1992/449), by paragraph 15(b) of the Schedule to the Deregulation (Pipe-lines) Order 1999 and paragraphs 5 and 7 of Schedule 2 to the Planning Act 2008. There are other amendments which are not relevant to these Regulations.

(6)

Section 15 was amended by paragraph 1 of Schedule 4 to the Gas (Third Party Access and Accounts) Regulations 2000.

(7)

Section 16(1) was amended by paragraph 2 of Schedule 4 to the Gas (Third Party Access and Accounts) Regulations 2000.

(8)

Section 17(1A) was inserted by paragraph 3 of Schedule 4 to the Gas (Third Party Access and Accounts) Regulations 2000 and was amended by section 151(5)(a) of the Energy Act 2004.

(9)

Section 28(1) has been amended but the amendments are not relevant to these Regulations.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill