The Energy Performance of Buildings (England and Wales) Regulations 2012

Changes over time for: Section 2

 Help about opening options

Version Superseded: 06/04/2018

Status:

Point in time view as at 06/04/2017. This version of this provision has been superseded. Help about Status

Close

Status

You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.

Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.

Changes to legislation:

There are currently no known outstanding effects for the The Energy Performance of Buildings (England and Wales) Regulations 2012, Section 2. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

InterpretationE+W

This adran has no associated Memorandwm Esboniadol

2.—(1) In these Regulations—

[F1Green Deal Framework Regulations” means the Green Deal Framework (Disclosure, Acknowledgment, Redress etc.) Regulations 2012;]

accreditation scheme” means a scheme approved by the Secretary of State in accordance with—

(a)

regulation 22; F2...

(b)

F3...

air-conditioning system” means a combination of all the components required to provide a form of air treatment in which the temperature is controlled or can be lowered, and includes systems which combine such air treatment with the control of ventilation, humidity and air cleanliness;

[F4“asset rating” means an energy performance indicator determined from the amount of energy estimated to meet the different needs associated with a standardised use of a building;]

F5...

building” means a roofed construction having walls, for which energy is used to condition the indoor climate [F6, and (other than in regulations 9(4) and 11) reference to a building includes reference to a building unit in that building] ;

building envelope” means the integrated elements of a building which separate its interior from the outdoor environment;

building unit” means a section, floor or apartment within a building which is designed or altered to be used separately;

bulk access data” means any data entered onto a register as required by regulation 27(2) [F7, (3) or (4B)] ;

[F8“display energy certificate” means a certificate which—

(a)

complies with regulation 15; or

(b)

in the case of a certificate issued in respect of an excluded building under regulation 15A, complies with regulation 15A(2);]

dwelling” means a building or part of a building occupied or intended to be occupied as a separate dwelling;

energy assessor” means an individual who is a member of an accreditation scheme;

[F9“energy efficiency improvement” has the meaning given in section 2(4) of the Energy Act 2011;]

energy from renewable sources” means energy from renewable non-fossil sources, namely wind, solar, aerothermal, geothermal, hydrothermal and ocean energy, hydropower, biomass, landfill gas, sewage treatment plant gas and biogases;

[F10“energy performance” in relation to a building means the calculated or measured amount of energy needed to meet the energy demand associated with a typical use of the building, which includes, inter alia, energy used for heating, cooling, ventilation, hot water and lighting;]

[F10energy performance certificate” means a certificate which—

(a)

in the case of a certificate entered on the register before 9th January 2013 complied with the requirements of regulation 11(1) of the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 M1;

(b)

in the case of a certificate entered on the register on or after 9th January 2013 complies with the requirements of regulation 9(1) of these Regulations; F11...

(ba)

[F12in the case of a certificate issued in respect of an excluded building under regulation 9A, complies with the requirements of regulation 9A(2) of these Regulations; or]

(c)

[F13in the case of a certificate entered on the register before 6th April 2016] complies with the requirements of regulation 29 M2 of the Building Regulations 2010;

[F14“excluded building” means a building owned, occupied or used by or for the purposes of—

(a)

the Security Service, the Secret Intelligence Service or the Government Communications Headquarters;

(b)

any of the armed forces;

(c)

the Royal Family;

(d)

a prison;

(e)

a contracted out prison within the meaning of the Criminal Justice Act 1991; or

(f)

a young offender institution;]

general access data” means information that is required by these Regulations to be included in an energy performance certificate, a display energy certificate, an inspection report, or a recommendation report;

[F15“green deal disclosure obligations” means the obligations to provide an energy performance certificate in section 12 of the Energy Act 2011 and Part 7 of the Green Deal Framework Regulations;

“green deal information” means the information about a green deal plan that is required by regulation 9(1)(ea) to be included in an energy performance certificate for a green deal property;]

green deal plan” means an energy plan which is a green deal plan in accordance with section 1(3) of the Energy Act 2011;

[F16“green deal property” has the meaning given in section 12(5)(b) of the Energy Act 2011;]

[F17“green deal relevant person” means a person who is authorised as—

(a)

a green deal provider; or

(b)

a green deal assessor certification body,

in accordance with Part 2 of the Green Deal Framework Regulations;.]

[F18“inspection report” means a report—

(a)

issued by an energy assessor in accordance with regulation 19(1); or

(b)

in the case of a report issued in respect of an excluded building, issued by an energy assessor in accordance with regulation 19A(2);]

keeper of the register” means the Secretary of State, or the person keeping a register on the Secretary of State's behalf;

nominated date”, in relation to a display energy certificate, means a date no later than three months after the end of the period over which the operational rating is calculated, which is nominated by the energy assessor who issued the certificate;

[F19“operational rating” means an energy performance indicator determined from the amount of energy consumed during the occupation of a building over a period of time and the energy demand associated with a typical use of the building over that period;]

[F20“payment period” has the meaning given in regulation 2(1) of the Green Deal Framework Regulations;]

penalty charge notice” means a notice given pursuant to regulation 36;

personal data” has the meaning given in section 1(1) of the Data Protection Act 1998 M3;

register” means a register required to be maintained under regulation 27;

“relevant person” (other than in the phrase “green deal relevant person”) means—

(a)

in relation to a building which is to be sold, the seller;

(b)

in relation to a building which is to be rented out, the prospective landlord;

(c)

in relation to an air-conditioning system, the person who has control of the operation of the system; and

(d)

in relation to a building which is constructed, the person who carries out the construction;

report reference number” means the unique number assigned by the keeper of the register to each energy performance certificate [F21issued by an energy assessor under regulation 9] or display energy certificate [F22issued by an energy assessor under regulation 15];

total useful floor area” means the gross floor area as measured in accordance with the guidance issued from time to time by the Royal Institution of Chartered Surveyors or by any body replacing that Institution.]

Textual Amendments

Marginal Citations

M1S.I. 2007/991, revoked by these Regulations (see regulation 46 and Schedule 3).

M2Regulation 29 of the Building Regulations 2010 was amended by S.I. 2012/809 and by S.I. 2012/3119.

M31998 c.29. Section 1(1) was amended by section 68 of and Schedule 8 to the Freedom of Information Act 2000 (c.36), and by S.I. 2004/3089. There are other amendments to section 1 of the Data Protection Act 1998 which are not relevant to these Regulations.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill