Chwilio Deddfwriaeth

The London Underground (Northern Line Extension) Order 2014

Changes over time for: Cross Heading: Principal powers

 Help about opening options

Alternative versions:

Status:

Point in time view as at 15/12/2014.

Changes to legislation:

There are currently no known outstanding effects for the The London Underground (Northern Line Extension) Order 2014, Cross Heading: Principal powers. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Principal powersE+W+S

Power to construct and maintain worksE+W+S

4.—(1) LUL may construct and maintain the scheduled works.

(2) Subject to article 5 (power to deviate), the scheduled works may only be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.

(3) Subject to paragraph (6), LUL may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, namely—

(a)works required for the strengthening, improvement, repair or reconstruction of any street;

(b)works for the strengthening, alteration or demolition of any building;

(c)works to erect and construct offices, head houses and other buildings, machinery, apparatus, works and conveniences;

(d)railway electrification and signalling works;

(e)station services and finishes;

(f)means of access, including footpaths;

(g)retaining walls, wing walls, shafts, drainage works and culverts;

(h)works to remove or alter the position of any street furniture or apparatus, including mains, sewers, drains, pipes, cables and lights;

(i)works to alter the course of, or otherwise interfere with, watercourses;

(j)landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised works;

(k)facilities and works for the benefit or protection of land or premises affected by the authorised works; and

(l)the felling of trees.

(4) Subject to paragraph (6), LUL may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the authorised works.

(5) LUL may remove any works constructed by it under this Order which have been constructed as temporary works or which it no longer requires.

(6) Paragraphs (3) and (4) only authorise the carrying out or maintenance of works—

(a)within the Order limits; or

(b)within the boundaries of any street abutting the Order limits or which has a junction with such a street.

(7) The powers conferred by this article may not be exercised within the boundaries of a street outside of the Order limits without the consent of the street authority but that consent must not be unreasonably withheld.

(8) In constructing and maintaining the scheduled works LUL may lay and install such number of railway lines, switches and crossings as may be necessary or expedient.

(9) The following enactments do not apply to anything done under or in pursuance of this Order—

(a)sections 70 and 73 of the 1968 Act (works not to be constructed, etc., without works licence and licensing of dredging, etc.); and

(b)section 109 of the Water Resources Act 1991(1), section 23 of the Land Drainage Act 1991(2) and any byelaws made under those Acts.

(10) Nothing in section 3 of the London Squares Preservation Act 1931(3) (protection of squares) has effect in relation to anything done for the purposes of or in connection with the exercise of any of the powers conferred by this Order with respect to works.

(11) Nothing in any agreement under section 9 of that Act (agreements between local authority and owner of a protected square) has effect to prohibit, restrict or impose any condition on the exercise of the powers conferred by this Order with respect to works.

(12) The authorised works may be constructed and maintained under the powers conferred by this article regardless of anything contained in, or done under, Part 1 of, or Schedule 2 to, the Commons Act 2006(4).

(13) (a) The provisions of the 2009 Act listed in sub-paragraph (b) that relate to marine licences and the enforcement of marine licences apply in relation to any works approved by the Marine Management Organisation under paragraph 78 of Schedule 8 (protective provisions) or determined under paragraph 85 of Schedule 8. Any such approval or determination is to be treated for the purposes of the application of those provisions listed in sub-paragraph (b) as a marine licence and any requirement of such approval or determination is to be treated for those same purposes as a condition attached to a marine licence under section 71(1) of the 2009 Act.

(b)The provisions of the 2009 Act referred to in sub-paragraph (a) are:

(i)section 65 (requirement for a licence);

(ii)Chapter 3 (enforcement) of Part 4 (marine licensing);

(iii)Chapter 2 (common enforcement powers) of Part 8 (enforcement); and

(iv)section 263 (power to require information relating to certain substances and objects),

and all other provisions of the 2009 Act that apply for the purposes of the provisions listed above.

Commencement Information

I1Art. 4 in force at 15.12.2014, see art. 1

Power to deviateE+W+S

5.—(1) In constructing or maintaining any of the scheduled works, LUL may—

(a)deviate laterally from the lines or situations shown on the deposited plans within the limits of deviation and within the limits of land to be used only temporarily; and

(b)deviate vertically from the levels shown on the deposited sections—

(i)to any extent upwards not exceeding 3 metres except in relation to the parts of the scheduled works referred to in column (1) of the table below, where the extent of permitted upwards deviation for each such part is set out in the corresponding entry in column (2) of that table; and

(ii)to any extent downwards as may be found to be necessary or convenient.

(1)

Part of scheduled work

(2)

Upwards vertical deviation limit

Work No. 7 (excluding head house)0.5 metres
Work No. 8 (shaft and adit)0.5 metres
Work No. 8 (hatch at top of shaft)Ground level

(2) Without limitation on the scope of paragraph (1), in constructing or maintaining the scheduled works LUL may within the limits mentioned in paragraph (1)—

(a)deviate from their points of commencement and termination shown on the deposited plans and the deposited sections; and

(b)deviate from the design of any tunnel or tunnel structure shown on the deposited sections and vary the number of tunnels and tunnel structures shown on the deposited sections.

(3) Regardless of the provisions of this article, Work No. 10 may not deviate laterally into any part of the land in the London Borough of Wandsworth numbered 10006 on the deposited plans.

Commencement Information

I2Art. 5 in force at 15.12.2014, see art. 1

StationsE+W+S

6.—(1) LUL may construct, maintain and operate stations on the specified lands, or on some of them, and LUL may construct, maintain and operate all necessary works and conveniences connected with those stations.

(2) The works and conveniences referred to in paragraph (1) include the ventilation shafts shown on the deposited sections.

(3) Nothing contained in the Covent Garden Market Act 1966(5) applies to any station provided by LUL under the powers conferred by this article.

(4) In paragraph (1) “the specified lands” means the land in the London Borough of Lambeth numbered 30331, 30332, 30341, 30355, 30369, 40014, 40017, 40105, 40110, 40115, 40120, 40135, 40140 and 40145 on the deposited plans and the land in the London Borough of Wandsworth numbered 20200, 20201, 20205, 20215 and 20235 on the deposited plans.

Commencement Information

I3Art. 6 in force at 15.12.2014, see art. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill