Article 29
SCHEDULE 5CONVERSION FACTORS FOR SURPLUS ACTIONS THAT ARE TO BE CREDITED AGAINST A SUPPLIER’S TOTAL HOME HEATING COST REDUCTION OBLIGATION
This
Atodlen has no associated
Memorandwm Esboniadol
1. The following table has effect for the purpose of determining the relevant conversion factor for a measure under article 29(3)(a)—
Measure | Conversion factor | ||
---|---|---|---|
A measure to improve the insulating properties of non-gas fuelled premises | 1.35 | ||
Repair of a qualifying boiler at non-gas fuelled premises | 1.45 | ||
Replacement of a boiler— | 0.95 | ||
(a) | which was not a qualifying boiler; and | ||
(b) | by a boiler which was not accompanied at the time installation was completed by a qualifying warranty | ||
Replacement of a qualifying boiler by another boiler— | 0.75 | ||
(a) | where both the boiler being replaced and the replacement boiler were fuelled by mains gas; and | ||
(b) | the replacement boiler was not accompanied at the time installation was completed by a qualifying warranty | ||
Replacement of a qualifying boiler by another boiler— | 0.8 | ||
(a) | where both the boiler being replaced and the replacement boiler were fuelled by mains gas; and | ||
(b) | the replacement boiler was accompanied at the time installation was completed by a qualifying warranty | ||
Replacement of a qualifying boiler— | 1.4 | ||
(a) | at non-gas fuelled premises; and | ||
(b) | by a boiler which was not accompanied at the time installation was completed by a qualifying warranty | ||
Replacement of a qualifying boiler— | 1.45 | ||
(a) | at non-gas fuelled premises; and | ||
(b) | by— | ||
(i) | a boiler which was accompanied at the time installation was completed by a qualifying warranty; or | ||
(ii) | a measure other than a boiler or an electric storage heater |
2. In this Schedule—
(a)a measure is installed at non-gas fuelled premises where it is installed at premises which—
(i)were non-gas fuelled prior to installation of the measure; and
(ii)remained non-gas fuelled when installation of the measure was complete; and
(b)premises are non-gas fuelled where the main space heating system for the premises is not—
(i)fuelled by mains gas; or
(ii)a district heating system.