The Renewables Obligation (Amendment) Order 2014

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

RO input electricity, RO output electricity and ineligible renewable sources

This adran has no associated Memorandwm Esboniadol

6.—(1) In the heading to Part 5 of the 2009 Order, before “renewable output” insert “RO eligible”.

(2) In Part 5 of the 2009 Order, before article 24 insert—

RO input electricity, RO output electricity and ineligible renewable sources

23A.(1) This article applies for the purposes of this Part.

(2) In any month where the total installed capacity of a generating station does not include any excluded capacity, “RO input electricity”, in relation to that station, means the total input electricity of the station during that month.

(3) Subject to paragraphs (4) and (5), in any month where the total installed capacity of a generating station includes excluded capacity, the “RO input electricity” of the station is equal to where—

(a)A is the total input electricity of the station during that month,

(b)B is the total installed capacity of the excluded capacity, and

(c)C is the total installed capacity of the station.

(4) Subject to paragraph (5), in any month where the total installed capacity of a generating station includes excluded capacity and electricity which is used by the station solely for purposes directly related to the operation of the excluded capacity is measured separately from the remainder of the electricity used by the station, the “RO input electricity” of the station is equal to where—

(a)A is the total input electricity of the station during that month, and

(b)D is the total amount of electricity measured as being used by the station solely for purposes directly related to the operation of the excluded capacity during that month.

(5) In any month where—

(a)the total installed capacity of a generating station includes excluded capacity,

(b)all of the electricity which is used by the station for purposes directly related to the operation of the RO capacity is measured separately from the remainder of the electricity used by the station, and

(c)the station does not generate electricity wholly or partly from hydrogen (other than hydrogen that constitutes fossil fuel),

“RO input electricity”, in relation to that station, means the total amount of electricity measured as being used by the station for purposes directly related to the operation of the RO capacity during that month.

(6) In any month where the total installed capacity of a generating station does not include any excluded capacity, “RO output electricity”, in relation to that station, means the total output electricity of the station during that month.

(7) Subject to paragraph (8), in any month where the total installed capacity of a generating station includes excluded capacity and all of the electricity generated by the excluded capacity is measured separately from any electricity generated by the station using RO capacity, the “RO output electricity” of the station is equal to where—

(a)E is the total output electricity of the station during that month, and

(b)F is the total amount of electricity measured as being generated by the excluded capacity during that month.

(8) In any month where the total installed capacity of a generating station includes excluded capacity and all of the electricity generated by the station using RO capacity is measured separately from any electricity generated by the station using excluded capacity, “RO output electricity”, in relation to that station, means the total amount of electricity measured as being generated by the RO capacity during that month.

(9) Electricity is generated from an ineligible renewable source if it is generated using the RO capacity of a generating station and—

(a)it is generated from landfill gas (other than electricity generated by a generating station to which article 29 applies, generated using pre-2013 capacity, generated in the way described in Schedule 2 as “closed landfill gas”, or generated using the heat from a turbine or engine),

(b)where one or more of the criteria set out in articles 36 to 40 have to be satisfied before ROCs can be issued in respect of the station’s RO eligible renewable output, it is electricity in respect of which any of those criteria are not satisfied, or

(c)it is electricity in respect of which ROCs are not to be issued by virtue of Part 4.

(10) In this article, references to “operation” include fuel handling, fuel preparation, maintenance and the pumping of water..

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill