Article 3
In the County Borough of Rhondda Cynon Taf—
A nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act consisting of a generating station with a gross rated electrical output of up to 299MWe comprising—
Numbered work 1 development comprising the demolition of all existing buildings and structures, including foundations, hardstanding and services,
Numbered work 2A development comprising—
up to 5 gas turbine generators; and
up to 5 exhaust gas emission flue stacks,
Numbered work 2B development comprising—
an administration building;
a store;
a control room/office/workshop;
telemetry apparatus;
black start diesel generator;
a natural gas receiving station and gas treatment compound containing—
a pipeline inspection gauge (PIG) receiving facility;
isolation valves, metering, heating, filtering, compression, pressure regulation equipment;
electricity supply kiosk; and
control and instrumentation kiosks,
Numbered work 2C development comprising a switchyard / banking compound containing up to eight transformers, switchgear building and other plant required to manage the transmission of electricity,
Numbered work 2D development comprising a construction and maintenance compound including new hardstanding,
Numbered work 2E development comprising—
security infrastructure, including cameras, perimeter fencing and a gatehouse;
site lighting infrastructure, including perimeter lighting columns;
internal roadways, car parking, pedestrian network, cycle parking, hardstanding and water treatment trailers;
site drainage, attenuation pond and waste management infrastructure;
electricity, water, wastewater and telecommunications and other services;
a raw / fire water tank and demineralised water storage tank;
landscaping including tree planting, fencing and other boundary treatments and ecological mitigation (including bat mitigation structure);
tree and hedge removal;
high voltage and low voltage cabling, equipment and controls and associated telemetry and electrical protection auxiliary cabling;
underground gas pipeline connection, associated telemetry and cathodic protection test / transformer rectifier unit; and
other ancillary equipment,
Numbered work 2F development comprising new or modified permanent means of access to numbered work 2 including permanent road surface, drainage, gates and fencing,
Numbered work 2G development comprising the maintenance strengthening or re-laying in a new location of the existing culvert forming that part of ordinary watercourse River Camnant within the Order limits, such works subject to maintaining the existing flow rate.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys