Articles 25 and 31
(1) | (2) | |
---|---|---|
Plot reference number shown on land plans | Purpose for which rights over land may be acquired | |
1, 2B, 3B, 12B, 12C, 13B, 13D, 17B, 18, 19B, 21B, 25B, 26B, 29B, 32B, 33Bii, 36B, 41B, 43B, 44B, 46B, 49B, 52B | New right for the installation, inspection, maintenance, renewal, repair, replacement and use of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 3 | |
24B | New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 3 | |
60B, 62B, 63B | New right for the installation, inspection, maintenance, renewal, repair, replacement and use of up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 3 | |
2A, 3A, 4ii, 12A, 13A, 13C, 17A, 19A, 21A, 25A, 26A, 29A, 32A, 33Aii, 36A, 41A, 43A, 44A, 46A, 49A, 52C | New right for the installation, inspection, maintenance, renewal, repair, replacement and use of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 2 | |
24C | New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 2 | |
60A, 62A, 63A, 68 | New right for the installation, inspection, maintenance, renewal, repair, replacement and use of up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 2 | |
10, 11, 14, 15, 16, 24A, 28, 31, 35, 38, 39, 48, 50, 52A, 53, 54 | New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 2 and Bizco 3 | |
56 | New right for the installation, inspection, maintenance, renewal, repair and replacement of landscaping for the benefit of Bizco 2 and Bizco 3 | |
69, 70, 71, 72, 73 | New right for the construction of new connection bays within the National Grid substation containing isolation switchgear and electrical equipment for the connection of the export cables to the transmission network for the benefit of Bizco 2 and Bizco 3 | |
59, 64, 65, 66, 74, 75, 76, 77, 78 | New right for: | |
(a) | the construction, inspection, maintenance, renewal, repair and replacement of the new connection bays within the National Grid substation; and | |
(b) | the installation, inspection, maintenance, renewal, repair and replacement for up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications, | |
in each case for the benefit of Bizco 2 and Bizco 3 | ||
9D, 13B, 30C, 40C, 49B | New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 2 | |
67E | New right for: | |
(a) | the construction, inspection, maintenance, renewal, repair and replacement of the new connection bays within the National Grid substation; and | |
(b) | the installation, inspection, maintenance, renewal, repair and replacement for up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications, | |
in each case for the benefit of Bizco 2 | ||
9C, 13A, 23C, 27C, 34C, 49A | New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 3 | |
58G, 67C | New right for: | |
(a) | the construction, inspection, maintenance, renewal, repair and replacement of the new connection bays within the National Grid substation; and | |
(b) | the installation, inspection, maintenance, renewal, repair and replacement for up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications, | |
in each case for the benefit of Bizco 3 |