6.—(1) The Company may construct and maintain the scheduled works.
(2) Subject to article 7 (power to deviate), the scheduled works may only be constructed in the lines or situations shown on the works plans and in accordance with the levels shown on the sections.
(3) Subject to paragraph (5), the Company may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, namely—
(a)works for the strengthening, alteration or demolition of any building;
(b)works to alter the position of apparatus, including mains, sewers, drains and cables;
(c)works to erect and construct such offices and other buildings, electrical plant and machinery, apparatus, and other works and conveniences as the Company thinks fit;
(d)make, provide and maintain all such approaches, lifts, stairs, escalators, ramps, passages, adits, head walls, retaining structures, means of access, shafts and stages as the Company thinks fit;
(e)railway lines, electrification and signalling works and telecommunications works;
(f)works to strengthen any subway;
(g)works to alter the course of, or otherwise interfere with watercourses and wells;
(h)landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of the scheduled works; and
(i)works for the benefit or protection of land or premises affected by the scheduled works.
(4) Subject to paragraph (5), the Company may carry out such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, other than works that would interfere with a navigable watercourse.
(5) Paragraphs (3) and (4) only authorise the carrying out or maintenance of works outside of the limits of deviation if such works are carried out—
(a)on any of the streets specified in Schedule 2 to this Order (streets subject to street works); or
(b)on land specified in columns (1) and (2) of Schedule 8 (land of which temporary possession may be taken) for the purposes specified in column (3) of that Schedule.
(6) In constructing Works Nos.1, 4 and 19 the Company may carry out pile interception works.
7. In constructing or maintaining any of the scheduled works, the Company may—
(a)deviate laterally from the lines or situations shown on the works plans to the extent of the limits of deviation for that work; and
(b)deviate vertically from the levels shown on the sections—
(i)to any extent not exceeding 3 metres upwards; or
(ii)to any extent downwards as may be found to be necessary or convenient.
8. The Company may, in the construction of Work No. 1, and within the limits of deviation alter and extend Bank station with all necessary works and conveniences connected with that Work, including the construction of a new passenger platform, enlarged passenger circulating areas and a new station entrance on Cannon Street, in the City of London.
9.—(1) The Company may for the purposes of the construction of the authorised works alter the layout of any street within the Order limits and the layout of any street abutting the Order limits or which has a junction with such a street and without limitation on the scope of this power the Company may—
(a)increase the width of the carriageway of the street by reducing the width of any kerb, footway, cycle track or verge within the street;
(b)alter the level or increase the width of any such kerb, footway, cycle track or verge;
(c)reduce the width of the carriageway of the street; and
(d)carry out works for the provision, removal, suspension or alteration of parking places, loading bays, bus lanes, bus stop clearways and bus laybys.
(2) The powers conferred by paragraph (1) in relation to any street abutting the Order limits or which has a junction with such a street must not be exercised without the consent of the street authority, but such consent must not be unreasonably withheld although it may be given subject to reasonable conditions including in relation to paragraph (3)(b) conditions to preserve the integrity of the City of London Corporation’s Traffic and Environmental Zone.
(3) Without limitation on the scope of the powers conferred under this article, the Company may—
(a)temporarily remove or relocate bollards, gates or any other obstruction preventing the passage of vehicular traffic along and over Sherborne Lane delineated on the land plan and shown numbered 91;
(b)temporarily remove or relocate bollards, gates or any other obstruction preventing the passage of vehicular traffic along and over the designated land; and
(c)provide a controlled pedestrian crossing in Cannon Street within the Order limits.
(4) In this article—
(a)“the designated land” means—
(i)the unnamed street off Laurence Pountney Lane delineated on the land plan and shown numbered 128 and 129; and
(ii)land at the junction of Upper Thames Street with Suffolk Lane delineated on the land plan and shown numbered 186 and 187; and
(b)“the City of London Corporation’s Traffic and Environmental Zone” means the security and surveillance cordon implemented by the City of London and Tower Hamlets (Prescribed Routes) Traffic Order 1994(1), the City of London (Prescribed Routes) (No1) Traffic Order 1998(2), the City of London, Hackney, Islington and Tower Hamlets (Prescribed Routes) Traffic Order 2000(3), and the City of London (Prescribed Routes) (No1) Traffic Order 2005 (4).
10.—(1) The Company may, for the purposes of or in connection with the construction of the authorised works, alter, move, remove, place and maintain in any street within and abutting the Order limits or which has a junction with such a street, any work, equipment or apparatus including foundations, road islands, bollards, substations, electric lines, closed circuit television monitoring equipment and any other electrical equipment or other apparatus.
(2) In this article—
(a)“apparatus” has the same meaning as in Part 3 of the 1991 Act;
(b)“electric line” has the meaning given by section 64(1) of the Electricity Act 1989(5); and
(c)the reference to any work, equipment, apparatus or other thing in a street includes a reference to any work, equipment, apparatus or other thing under, over, along or upon the street.
11.—(1) The Company may, for the purposes of the construction of the authorised works, enter upon so much of any of the streets specified in Schedule 2 (streets subject to street works) as is within and abutting the Order limits or which has a junction with such a street and may—
(a)break up or open the street, or any sewer, drain or tunnel under it, or tunnel or bore under the street;
(b)place apparatus in the street;
(c)maintain apparatus in the street or change its position; and
(d)execute any works required for or incidental to any works referred to in sub-paragraphs (a), (b) and (c).
(2) This article is subject to paragraph 3 of Schedule 10 (provisions relating to statutory undertakers etc.).
(3) In this article “apparatus” has the same meaning as in Part 3 of the 1991 Act.
12.—(1) Subject to the provisions of this article, the Company may, in connection with the construction of the authorised works, stop up each of the streets specified in columns (1) and (2) of Schedule 3 (streets to be stopped up) to the extent specified in column (3) of that Schedule.
(2) No street specified in columns (1) and (2) of Schedule 3 (being a street to be stopped up for which no substitute is to be provided) is to be wholly or partly stopped up under this article unless the condition specified in paragraph (3) is satisfied in relation to all the land which abuts on either side of the street to be stopped up.
(3) The condition referred to in paragraph (2) is that—
(a)the Company is in possession of the land; or
(b)there is no right of access to the land from the street concerned; or
(c)there is reasonably convenient access to the land otherwise than from the street concerned; or
(d)the owners and occupiers of the land have agreed to the stopping up.
(4) Where a street has been stopped up under this article—
(a)all rights of way over or along the street so stopped up are extinguished; and
(b)the Company may appropriate and use for the purposes of its railway undertaking so much of the street so stopped up.
(5) Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(6) This article is subject to paragraph 2 of Schedule 10 (provisions relating to statutory undertakers etc.) and paragraph 4 of Schedule 11 (protection for electricity, gas, water and sewerage undertakers).
13.—(1) The Company, during and for the purposes of the construction of the authorised works, may temporarily stop up, alter or divert any street and may for any reasonable time—
(a)divert the traffic from the street; and
(b)subject to paragraph (2), prevent all persons from passing along the street.
(2) The Company must provide reasonable access for pedestrians going to or from premises abutting a street affected by the exercise of the powers conferred by this article (or to and from any other premises accessible for pedestrians from, and only from that street) if there would otherwise be no such access.
(3) Without limitation on the scope of paragraph (1), the Company may exercise the powers conferred by this article in relation to the streets specified in columns (1) and (2) of Schedule 4 (streets to be temporarily stopped up) to the extent specified in column (3) of that Schedule.
(4) The Company must not exercise the powers conferred by this article—
(a)in relation to any street specified as mentioned in paragraph (3) without first consulting the street authority; and
(b)in relation to any other street without the consent of the street authority which may attach reasonable conditions to any consent, but such consent must not be unreasonably withheld.
(5) Without limitation on the scope of the powers conferred under this article, any part of Arthur Street, Martin Lane and that part of King William Street shown shaded on the works plan which is stopped up under this article may be used as a work site for the purposes of the construction of the authorised works.
(6) Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
14. The Company may, for the purposes of the construction of the authorised works—
(a)form and lay out means of access, or improve existing means of access, in the location specified in columns (1) and (2) of Schedule 5 (access to works) at the points marked ‘A’ on the access to works and permanent stopping up of streets plan; and
(b)with the approval of the highway authority after consultation with the local planning authority, such approval not to be unreasonably withheld (but may be subject to reasonable conditions), form and lay out such other means of access or improve existing means of access, at such locations within the Order limits as the Company reasonably requires for the purposes of the authorised works.
15.—(1) Any street to be constructed under this Order must be completed to the reasonable satisfaction of the highway authority and must be maintained by and at the expense of the Company for a period of 12 months from its completion and from the expiry of that period by and at the expense of the highway authority.
(2) Where a street is altered or diverted under this Order, the altered or diverted part of the street must be completed to the reasonable satisfaction of the street authority, and must be maintained by and at the expense of the Company for a period of 12 months from its completion and at the expiry of that period by and at the expense of the street authority.
(3) Paragraphs (1) and (2) do not apply in relation to the structure of any bridge or tunnel carrying a street over or under any railway of the Company.
(4) In any action against the Company in respect of loss or damage resulting from any failure by it to maintain a street under this article, it is a defence (without affecting any other defence or the application of the law relating to contributory negligence) to prove that the Company had taken such care as in all the circumstances was reasonably required to secure that the part of the street to which the action relates was not dangerous to traffic.
(5) For the purposes of a defence under paragraph (4), the court must in particular have regard to the following matters—
(a)the character of the street and the traffic which was reasonably to be expected to use it;
(b)the standard of maintenance appropriate for a street of that character and used by such traffic;
(c)the state of repair in which a reasonable person would have expected to find the street;
(d)whether the Company knew, or could reasonably have been expected to know, that the condition of the part of the street to which the action relates was likely to cause danger to users of the street;
(e)where the Company could not reasonably have been expected to repair that part of the street before the cause of action arose, what warning notices of its condition had been displayed,
but for the purposes of such a defence it is not relevant to prove that the Company had arranged for a competent person to carry out or supervise the maintenance of the part of the street to which the action relates unless it is also proved that the Company had given the competent person proper instructions with regard to the maintenance of the street and that the competent person had carried out those instructions.
16.—(1) A street authority and the Company may enter into agreements with respect to—
(a)the construction of any new street (including any structure carrying the street over or under a railway) under the powers conferred by this Order;
(b)the maintenance of the structure of any bridge or tunnel carrying a street over or under a railway;
(c)any stopping up, alteration or diversion of a street under the powers conferred by this Order; or
(d)the execution in the street of any of the works referred to in article 11(1) (power to execute street works).
(2) Such an agreement may, without limitation on the scope of paragraph (1)—
(a)make provision for the street authority to carry out any function under this Order which relates to the street in question; and
(b)contain such terms as to payment and otherwise as the parties consider appropriate.
17.—(1) The Company may use any watercourse or any public sewer or drain for the drainage of water in connection with the construction, operation or maintenance of the authorised works and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain.
(2) Any dispute arising from the exercise of the powers conferred by paragraph (1) to connect to or use a public sewer or drain is to be determined as if it were a dispute under section 106 of the Water Industry Act 1991(6).
(3) The Company must not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld.
(4) The Company must not make any opening into any public sewer or drain except—
(a)in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and
(b)where that person has been given the opportunity to supervise the making of the opening.
(5) (a) The Company must not, in the exercise of the powers conferred by this article, damage or interfere with the bed or banks of any watercourse forming part of a main river.
(6) The Company must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under the powers conferred by this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.
(7) Nothing in this article overrides the requirement for an environmental permit under regulation 12(1)(b) of the Environmental Permitting (England and Wales) Regulations 2010(7).
(8) If a person who receives an application for consent or approval fails to notify the Company of a decision within 28 days of receiving an application for consent under paragraph (3) or approval under paragraph (4)(a) that person is deemed to have granted consent or given approval, as the case may be.
(9) In this article—
(a)“public sewer or drain” means a sewer or drain which belongs to the Environment Agency, a local authority or a sewerage undertaker; and
(b)other expressions, excluding watercourse, used both in this article and in the Water Resources Act 1991(8) have the same meaning as in that Act.
18.—(1) Subject to the following provisions of this article, the Company may at its own expense carry out such protective works to—
(a)any building; or
(b)any road; or
(c)any apparatus of a statutory undertaker
lying within the Order limits as the Company considers to be necessary or expedient.
(2) Protective works may be carried out—
(a)at any time before or during the construction in the vicinity of the building, road or apparatus of any part of the authorised works; or
(b)after the completion of the construction of that part of the authorised works in the vicinity of the building, road or apparatus at any time up to the end of the period of 5 years beginning with the day on which that part of the authorised works is first opened for use.
(3) For the purpose of determining how the functions under this article are to be exercised the Company may (subject to paragraph (5)) enter and survey any building, go onto and survey any road or access and survey any apparatus falling within paragraph (1) and any land within the curtilage of the building or in which the apparatus is located.
(4) For the purpose of carrying out protective works under this article to a building, road or apparatus the Company may (subject to paragraphs (5) and (6))—
(a)enter the building, go onto the road or access the apparatus and any land within the curtilage of the building or in which the apparatus is located; and
(b)where the works cannot be carried out reasonably conveniently without entering land which is adjacent to the building (but outside its curtilage) or adjacent to the road or land in which the apparatus is located, enter the adjacent land (but not any building erected on it).
(5) Before exercising—
(a)a right under paragraph (1) to carry out protective works to a building, road or apparatus;
(b)a right under paragraph (3) to enter a building, go onto a road or access apparatus and land within the curtilage of the building or in which the apparatus is located; and land within its curtilage;
(c)a right under paragraph (4)(a) to enter a building, go onto a road or access apparatus and land within the curtilage of the building or in which the apparatus is located; or
(d)a right under paragraph (4)(b) to enter land,
the Company must, except in the case of emergency, serve on the owners and occupiers of the building or land or the owner of the road or apparatus not less than 14 days’ notice of its intention to exercise that right and, in a case falling within sub-paragraph (a) or (c), specifying the protective works proposed to be carried out.
(6) Where a notice is served under paragraph (5)(a), (c) or (d), the owner or occupier of the building or land or the owner of the road or apparatus concerned may, by serving a counter-notice within the period of 10 days beginning with the day on which the notice was served, require the question whether it is necessary or expedient to carry out the protective works or to enter the building or land to be referred to arbitration under article 50 (arbitration).
(7) The Company must compensate the owners and occupiers of any building or land or the owner of the road or apparatus in relation to which the powers conferred by this article have been exercised for any loss or damage arising to them by reason of the exercise of those powers.
(8) Where—
(a)protective works are carried out under this article to a building, road or apparatus falling within paragraph (1); and
(b)within the period of 5 years beginning with the day on which the part of the authorised works constructed in the vicinity of the building is first opened for use it appears that the protective works are inadequate to protect the building, road or apparatus against damage caused by the construction or operation of that part of the authorised works,
the Company must compensate the owners and occupiers of the building for any loss or damage sustained by them.
(9) Without affecting article 49 (no double recovery) nothing in this article relieves the Company from any liability to pay compensation under section 10(2) of the 1965 Act.
(10) Any compensation payable under paragraph (7) or (8) is to be determined, in case of dispute, under Part 1 of the 1961 Act.
(11) In this article—
“protective works” in relation to a building, road or apparatus means—
underpinning, strengthening and any other works the purpose of which is to prevent damage which may be caused to the building, road or apparatus by the construction, maintenance or operation of the authorised works; and
any works the purpose of which is to remedy any damage which has been caused to the building, road or apparatus by the construction, maintenance or operation of the authorised works; and
“road” includes any structures supporting the road.
19.—(1) The Company may for the purposes of this Order—
(a)survey or investigate any land shown within the Order limits or which may be affected by the authorised works;
(b)without limitation on the scope of sub-paragraph (a), make trial holes in such positions as the Company thinks fit on the land to investigate the nature of the surface layer and subsoil and remove soil samples;
(c)without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land;
(d)place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes; and
(e)enter on the land for the purpose of exercising the powers conferred by sub-paragraphs (a) to (d).
(2) In connection with any apparatus which may be placed or left on land under the powers conferred by paragraph (1)(d) of this article, the Company may, subject to payment, connect to and use any electrical supply on the land for the purposes of powering such apparatus.
(3) No land may be entered or equipment placed or left on or removed from the land under paragraph (1), unless at least 7 days’ notice has been served on every owner and occupier of the land.
(4) Any person entering land under this article on behalf of the Company—
(a)must, if so required, before or after entering the land produce written evidence of authority to do so; and
(b)may take onto the land such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes.
(5) No trial holes are to be made under this article—
(a)in a carriageway or footway without the consent of the highway authority; or
(b)in a private street without the consent of the street authority,
but such consent must not be unreasonably withheld.
(6) The Company must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the powers conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(7) Nothing in this article overrides the requirement for scheduled monument consent under the Ancient Monuments and Archaeological Areas Act 1979(9).
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys