Chwilio Deddfwriaeth

The Town and Country Planning (General Permitted Development) (England) Order 2015

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)
 Help about advanced features

Nodweddion Uwch

Changes over time for: Paragraph AB.1

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Town and Country Planning (General Permitted Development) (England) Order 2015, Paragraph AB.1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F1Development not permittedE+W
This adran has no associated Memorandwm Esboniadol

AB.1.  Development is not permitted by Class AB if—

[F2(za)the permission to use the building as a dwellinghouse has been granted only by virtue of Class MA of Part 3 of this Schedule;]

(a)the building was constructed before 1st July 1948 or after 5th March 2018;

(b)on 5th March 2018 the building was in a use other than—

(i)a use or mixed use within paragraph AB(2)(a) or (b); or

(ii)a use falling within Class C3 of the Schedule to the Use Classes Order;

(c)the additional storeys are constructed other than on the principal part of the building;

(d)the floor to ceiling height of any additional storey, measured internally, would exceed the lower of—

(i)3 metres; or

(ii)the floor to ceiling height, measured internally, of any storey of the principal part of the existing building;

(e)the new dwellinghouses are not flats;

(f)the height of the highest part of the roof of the extended building (not including plant) would be greater than 18 metres;

(g)the height of the highest part of the roof of the extended building would exceed by more than 3.5 metres the height of the highest part of the roof of every other building in the row of terrace buildings of which it forms part (not including plant, in each case);

(h)the height of the highest part of the roof of the extended building would exceed the height of the highest part of the roof of the existing building (not including plant, in each case) by more than—

(i)3.5 metres, where the existing building consists of one storey; or

(ii)7 metres, where the existing building consists of more than one storey;

(i)the existing building has been enlarged by the addition of one or more storeys above the original building, whether in reliance on permission granted under this Part or otherwise;

(j)development under Class AB(3)(a) would include the provision of visible support structures on or attached to the exterior of the building upon completion of the development;

(k)development under Class AB(3)(a) would consist of engineering operations other than works within the existing curtilage of the building to—

(i)strengthen existing walls;

(ii)strengthen existing foundations; or

(iii)install or replace water, drainage, electricity, gas or other services;

(l)in the case of Class AB(3)(b) development there is no existing plant on the building;

(m)in the case of Class AB(3)(b) development the height of any replaced or additional plant as measured from the lowest surface of the new roof on the principal part of the extended building would exceed the height of any existing plant as measured from the lowest surface of the existing roof on the principal part of the existing building;

(n)development under Class AB(3)(c) would extend beyond the curtilage of the existing building;

(o)development under Class AB(3)(d) would—

(i)extend beyond the curtilage of the existing building;

(ii)be situated on land forward of a wall forming the principal elevation of the existing building; or

(iii)be situated on land forward of a wall fronting a highway and forming a side elevation of the existing building; or

(p)the land or site on which the building is located, is or forms part of—

(i)article 2(3) land;

(ii)a site of special scientific interest;

(iii)a listed building or land within its curtilage;

(iv)a scheduled monument or land within its curtilage;

(v)a safety hazard area;

(vi)a military explosives storage area; or

(vii)land within 3 kilometres of the perimeter of an aerodrome.]

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill