The Town and Country Planning (General Permitted Development) (England) Order 2015

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes to legislation:

The Town and Country Planning (General Permitted Development) (England) Order 2015, PART 8 is up to date with all changes known to be in force on or before 18 May 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

PART 8E+WTransport related development

Modifications etc. (not altering text)

C1 Sch. 2 Pt. 8 Class B applied (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), arts. 1, 9(4) (with arts. 35, 36)

Class A – railway or light railway undertakingsE+W

Permitted developmentE+W

A.  Development by railway undertakers on their operational land, required in connection with the movement of traffic by rail.

Development not permittedE+W

A.1  Development is not permitted by Class A if it consists of or includes—

(a)the construction of a railway;

(b)the construction or erection of a hotel, railway station or bridge; or

(c)the construction or erection otherwise than wholly within a railway station of—

(i)an office, residential or educational building, or a building used for an industrial process, or

(ii)a car park, shop, restaurant, garage, petrol filling station or other building or structure provided under transport legislation.

Interpretation of Class AE+W

A.2  For the purposes of Class A, references to the construction or erection of any building or structure include references to the reconstruction or alteration of a building or structure where its design or external appearance would be materially affected.

Class B – dock, pier, harbour, water transport, canal or inland navigation undertakingsE+W

Permitted developmentE+W

B.  Development on operational land by statutory undertakers or their lessees [F1or agents of development (including the erection or alteration of an operational building)] in respect of dock, pier, harbour, water transport, or canal or inland navigation undertakings, required—

(a)for the purposes of shipping, F2...

(b)in connection with the embarking, disembarking, loading, discharging or transport of passengers, livestock or goods at a dock, pier or harbour, or with the movement of traffic by canal or inland navigation or by any railway forming part of the undertaking [F3, or

(c)in connection with the provision of services and facilities]

Development not permittedE+W

B.1  Development is not permitted by Class B if it consists of or includes—

(a)the construction or erection of a hotel, or of a bridge or other building not required in connection with the handling of traffic; or

(b)the construction or erection otherwise than wholly within the limits of a dock, pier or harbour of—

(i)an educational building, F4...

(ii)a car park, shop, restaurant, garage, petrol filling station or other building provided under transport legislation [F5,

(c)where the development falls within paragraph B(c)—

(i)the erection of a building other than an operational building; or

(ii)the alteration or reconstruction of a building other than an operational building, where its design or external appearance would be materially affected].

[F6ConditionE+W

B.1A.(1) Development is permitted by Class B subject to the condition that the relevant statutory undertaker consults the local planning authority before carrying out any development, unless that development falls within the description in paragraph B.3.]

Interpretation of Class BE+W

B.2  For the purposes of Class B—

(a)references to the construction or erection of any building or structure include references to the reconstruction or alteration of a building or structure where its design or external appearance would be materially affected, and

(b)the reference to operational land includes land designated by an order made under section 14 or 16 of the Harbours Act 1964 (orders for securing harbour efficiency etc., and orders conferring powers for improvement, construction etc., of harbours) M1, and which has come into force, whether or not the order was subject to the provisions of the Statutory Orders (Special Procedure) Act 1945 M2.

Marginal Citations

M21945 c. 18. An order is subject to special parliamentary procedure under the Act if it is one which the Secretary of State makes which authorises the compulsory purchase of land (see paragraph 22 of Schedule 3 to the Harbours Act 1964).

[F7B.3.  Development falls within this paragraph if—

(a)it is urgently required for the efficient running of the dock, pier, harbour, water transport, canal or inland navigation undertaking, and

(b)it consists of the carrying out of works, or the erection or construction of a structure or of an ancillary building, or the placing on land of equipment, and the works, structure, building, or equipment do not exceed 4 metres in height or 200 cubic metres in capacity.]

Class C – works to inland waterwaysE+W

Permitted developmentE+W

C.  The improvement, maintenance or repair of an inland waterway (other than a commercial waterway or cruising waterway) to which section 104 of the Transport Act 1968 (classification of waterways)M3applies, and the repair or maintenance of a culvert, weir, lock, aqueduct, sluice, reservoir, let-off valve or other work used in connection with the control and operation of such a waterway.

Marginal Citations

M31968 c. 73, was amended by S.I. 2012/1659; there are other amendments not relevant to this Order.

Class D – dredging by transport undertakingsE+W

Permitted developmentE+W

D.  The use of any land by statutory undertakers in respect of dock, pier, harbour, water transport, canal or inland navigation undertakings for the spreading of any dredged material.

Class E – development for the aid of shippingE+W

Permitted developmentE+W

E.  Development required for the purposes of the functions of a general or local lighthouse authority under the Merchant Shipping Act 1995 M4 and any other statutory provision made with respect to a local lighthouse authority, or in the exercise by a local lighthouse authority of rights, powers or duties acquired by usage prior to the 1995 Act.

Marginal Citations

M41995 c. 21. See in particular section 193 as to the meaning of a general and a local lighthouse authority and Part 8 of the Act in general; relevant amendments are made by sections 19 and 20 of, and Schedule 6 to, the Merchant Shipping and Maritime Security Act 1997 (c. 28), sections 8 and 9 of the Marine Navigation Act 2013 (c. 23), Schedule 8 to the Public Service Pensions Act 2013 (c. 25) and S.I. 2003/2867.

Development not permittedE+W

E.1  Development is not permitted by Class E if it consists of or includes the erection of offices, or the reconstruction or alteration of offices where their design or external appearance would be materially affected.

Class F – development at an airportE+W

Permitted developmentE+W

F.  The carrying out on operational land by a relevant airport operator or its agent of development (including the erection or alteration of an operational building) in connection with the provision of services and facilities at a relevant airport.

Development not permittedE+W

F.1  Development is not permitted by Class F if it would consist of or include—

(a)the construction or extension of a runway;

(b)the construction of a passenger terminal the floor space of which would exceed 500 square metres;

(c)the extension or alteration of a passenger terminal, where the floor space of the building as existing at 5th December 1988 or, if built after that date, of the building as built, would be exceeded by more than 15%;

(d)the erection of a building other than an operational building; or

(e)the alteration or reconstruction of a building other than an operational building, where its design or external appearance would be materially affected.

ConditionE+W

F.2  Development is permitted by Class F subject to the condition that the relevant airport operator consults the local planning authority before carrying out any development, unless that development falls within the description in paragraph F.4.

Interpretation of Class FE+W

F.3  For the purposes of paragraph F.1, floor space is calculated by external measurement and without taking account of the floor space in any pier or satellite.

F.4  Development falls within this paragraph if—E+W

(a)it is urgently required for the efficient running of the airport, and

(b)it consists of the carrying out of works, or the erection or construction of a structure or of an ancillary building, or the placing on land of equipment, and the works, structure, building, or equipment do not exceed 4 metres in height or 200 cubic metres in capacity.

Class G – air traffic services development at an airportE+W

Permitted developmentE+W

G.  The carrying out on operational land within the perimeter of a relevant airport by a relevant airport operator or its agent of development in connection with the provision of air traffic services.

Class H – air traffic services development near an airportE+W

Permitted developmentE+W

H.  The carrying out on operational land outside but within 8 kilometres of the perimeter of a relevant airport by a relevant airport operator or its agent of development in connection with the provision of air traffic services.

Development not permittedE+W

H.1  Development is not permitted by Class H if—

(a)any building erected would be used for a purpose other than housing equipment used in connection with the provision of air traffic services;

(b)any building erected would exceed a height of 4 metres; or

(c)it would consist of the installation or erection of any radar or radio mast, antenna or other apparatus which would exceed 15 metres in height, or, where an existing mast, antenna or apparatus is replaced, the height of that mast, antenna or apparatus, if greater.

Class I – development by an air traffic services licence holder within an airportE+W

Permitted developmentE+W

I.  The carrying out by an air traffic services licence holder or its agents within the perimeter of an airport of development in connection with the provision of air traffic services.

Class J – development by an air traffic services licence holder on operational landE+W

Permitted developmentE+W

J.  The carrying out on operational land of an air traffic services licence holder by that licence holder or its agents of development in connection with the provision of air traffic services.

Development not permittedE+W

J.1  Development is not permitted by Class J if—

(a)any building erected would be used for a purpose other than housing equipment used in connection with the provision of air traffic services;

(b)any building erected would exceed a height of 4 metres; or

(c)it would consist of the installation or erection of any radar or radio mast, antenna or other apparatus which would exceed 15 metres in height, or, where an existing mast, antenna or apparatus is replaced, the height of that mast, antenna or apparatus, if greater.

Class K – development by an air traffic services licence holder in an emergencyE+W

Permitted developmentE+W

K.  The use of land by or on behalf of an air traffic services licence holder in an emergency to station moveable apparatus replacing unserviceable apparatus.

ConditionE+W

K.1  Development is permitted by Class K subject to the condition that on or before the expiry of a period of 6 months beginning with the date on which the use began, the use ceases, and any apparatus is removed, and the land is restored to its condition before the development took place, or to any other condition as may be agreed in writing between the local planning authority and the developer.

Class L – development by an air traffic services licence holder involving moveable structuresE+W

Permitted developmentE+W

L.  The use of land by or on behalf of an air traffic services licence holder to provide services and facilities in connection with the provision of air traffic services and the erection or placing of moveable structures on the land for the purposes of that use.

ConditionE+W

L.1  Development is permitted by Class L subject to the condition that, on or before the expiry of the period of 6 months beginning with the date on which the use began, the use ceases, and any structure is removed, and the land is restored to its condition before the development took place, or to any other condition as may be agreed in writing between the local planning authority and the developer.

Class M – development by the Civil Aviation Authority for surveys etc.E+W

Permitted developmentE+W

M.  The use of land by or on behalf of the Civil Aviation Authority for the stationing and operation of apparatus in connection with the carrying out of surveys or investigations.

ConditionE+W

M.1  Development is permitted by Class M subject to the condition that on or before the expiry of the period of 6 months beginning with the date on which the use began, the use ceases, and any apparatus is removed, and the land is restored to its condition before the development took place, or to any other condition as may be agreed in writing between the local planning authority and the developer.

Class N – use of airport buildings managed by relevant airport operatorsE+W

Permitted developmentE+W

N.  The use of buildings within the perimeter of an airport managed by a relevant airport operator for purposes connected with air transport services or other flying activities at that airport.

Interpretation of Part 8E+W

O.  For the purposes of Part 8—

air traffic services” has the same meaning as in section 98 of the Transport Act 2000 (air traffic services) M5;

air traffic services licence holder” means a person who holds a licence under Chapter 1 of Part 1 of the Transport Act 2000 M6;

air transport services” has the same meaning as in section 82 of the Airports Act 1986 M7;

operational building” means [F8, for the purposes of Class F,] a building, other than a hotel, required in connection with the movement or maintenance of aircraft, or with the embarking, disembarking, loading, discharge or transport of passengers, livestock or goods at a relevant airport;

relevant airport” means an airport to which Part 5 of the Airports Act 1986 (status of certain airport operators as statutory undertakers etc.) M8 applies;

relevant airport operator” means a relevant airport operator within the meaning of section 57A of the Airports Act 1986 (scope of Part 5); and

transport legislation” means section 14(1)(d) of the Transport Act 1962 (supplemental provisions relating to the Boards' powers) M9 or section 10(1)(x) of the Transport Act 1968 (general powers of Passenger Transport Executive) M10.

Textual Amendments

Marginal Citations

M6See in particular sections 5 to 7 and 40 (section 5 was amended by S.I. 2009/1941 and 2011/205).

M81986 c. 31. See section 57A(2); section 57A was substituted for section 57 by Schedule 8 to the Civil Aviation Act 2012 (c. 19). There are other amendments to Part 5 but none are relevant to this Order.

M101968 c. 73, relevant amendments are made by Schedule 3 to the Transport Act 1985 (c. 67), Schedule 4 to the Local Transport Act 2008 (c. 26) and S.I. 2014/866.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill