Articles 13 and 17
SCHEDULE 3E+W+SCLASSIFICATIONS OF ROADS, ETC.
PART 1E+W+SSPECIAL ROADS
Commencement Information
I1Sch. 3 Pt. 1 in force at 22.12.2017, see art. 1
(1) Area | (2) Length of road |
---|---|
Ashford Borough | M20 eastbound off slip onto Junction 10a between point D and point E on the classification of roads plans, comprising 307 metres. |
Ashford Borough | M20 eastbound on slip onto the M20 from Junction 10a between point K and point L on the classification of roads plans, comprising 379 metres. |
Ashford Borough | M20 westbound off slip onto Junction 10a between point N and point M on the classification of roads plans, comprising 340 metres. |
Ashford Borough | M20 westbound on slip onto the M20 from Junction 10a between point G and point F on the classification of roads plans, comprising 463 metres. |
PART 2E+W+STRUNK ROADS
Commencement Information
I2Sch. 3 Pt. 2 in force at 22.12.2017, see art. 1
(1) Area | (2) Length of road |
---|---|
Ashford Borough | In the event of construction of the A2070 Option A only, A2070 link road between point Q and point R on the classification of roads plans, comprising 693 metres. |
Ashford Borough | In the event of construction of the A2070 Option A only, A2070 link road between point S and point T on the classification of roads plans, comprising 722 metres. |
Ashford Borough | In the event of construction of the A2070 Option B only, A2070 link road between point Q and point CC on the classification of roads plans, comprising 338 metres. |
Ashford Borough | In the event of construction of the A2070 Option B only, A2070 link road between point II and point R on the classification of roads plans, comprising 288 metres. |
Ashford Borough | In the event of construction of the A2070 Option B only, A2070 link road between point S and point DD on the classification of roads plans, comprising 363 metres. |
Ashford Borough | In the event of construction of the A2070 Option B only, A2070 link road between point HH and point T on the classification of roads plans, comprising 288 metres. |
Ashford Borough | In the event of construction of the A2070 Option B only, Stour Park roundabout circulatory carriageway, comprising 200 metres. |
Ashford Borough | A2070 Bad Munstereifel Road between point U and point V on the classification of roads plans, comprising 237 metres. |
Ashford Borough | A2070 Bad Munstereifel Road between point W and point X on the classification of roads plans, comprising 225 metres. |
Ashford Borough | A2070 link road roundabout circulatory carriageway, comprising 200 metres. |
Ashford Borough | A2070 Bad Munstereifel Road, between point Y and point Z on the classification of roads plans, comprising 354 metres. |
Ashford Borough | A2070 Bad Munstereifel Road, between point AA and point BB on the classification of roads plans, comprising 348 metres. |
Ashford Borough | M20 Junction 10a roundabout circulatory carriageway, comprising 490 metres. |
PART 3E+W+SCLASSIFIED ROADS
Commencement Information
I3Sch. 3 Pt. 3 in force at 22.12.2017, see art. 1
(1) Area | (2) Length. of road |
---|---|
Ashford Borough | A20 Hythe Road between point A and points B and C on the classification of roads plans, comprising 186 metres. |
Ashford Borough | A20 Hythe Road between points H and I and point J on the classification of roads plans, comprising 249 metres. |
PART 4E+W+SUNCLASSIFIED ROADS
Commencement Information
I4Sch. 3 Pt. 4 in force at 22.12.2017, see art. 1
(1) Area | (2) Length. of road |
---|---|
Ashford Borough | Kingsford Street between point O and point P on the classification of roads plans, comprising 151 metres. |
Ashford Borough | In the event of construction of the A2070 Option B only, spur to Stour Park site between point FF and points EE and GG on the classification of roads plans, comprising 68 metres. |
PART 5E+W+SSPEED LIMITS
Commencement Information
I5Sch. 3 Pt. 5 in force at 22.12.2017, see art. 1
(1) Parish(es) | (2) Road name, number and length | (3) Speed Limit |
---|---|---|
Ashford, Mersham | A20, Hythe Road. From a point 40 metres north west of the M20 Junction 10a circulatory carriageway along its length to where it joins the M20 Junction 10a circulatory carriageway for a total distance of 40 metres. As shown on sheet 2 of the speed limit plans. | 40 miles per hour |
Mersham | A20, Hythe Road. From where the A20 diverges/merges with the M20 Junction 10a circulatory carriageway along its length to a point 45 metres east of this location. As shown on sheet 2 of the speed limit plans. | 40 miles per hour |
Mersham | A20, Hythe Road. From a point 45 metres east of the location where the A20 diverges/merges with the M20 Junction 10a circulatory carriageway to a point 11 metres from the centre line of the junction of the A20 with Bockham Lane, a length of 386 metres. As shown on sheet 2 of the speed limit plans. | 50 miles per hour |
Mersham | M20 Junction 10a circulatory carriageway. For the whole length of the circulatory carriageway around the M20 Junction 10a roundabout, a length of 490 metres. As shown on sheets 2 and 3 of the speed limit plans. | 40 miles per hour |
Ashford, Mersham | M20 eastbound off slip onto Junction 10a. From the start of the diverge with the M20 main carriageway along its length to the point where it merges with the new Junction 10a circulatory carriageway, a length of 307 metres. As shown on sheets 1 and 2 of the speed limit plans. | 70 miles per hour |
Ashford, Mersham | M20 eastbound on slip onto the M20 from Junction 10a. From the start of the diverge from the new Junction 10a circulatory carriageway along its length to its merge with the M20 main carriageway, a length of 379 metres. As shown on sheet 2 of the speed limit plans. | 70 miles per hour |
Mersham | M20 westbound off slip onto Junction 10a. From the start of the diverge with the M20 main carriageway along its length to its merge with the new Junction 10a circulatory carriageway, a length of 340 metres. As shown on sheet 2 of the speed limit plans. | 70 miles per hour |
Mersham | M20 westbound on slip onto the M20 from Junction 10a. From the start of the diverge from the new Junction 10a circulatory carriageway along its length to its merge with the M20 main carriageway, a length of 463 metres. As shown on sheets 1 and 3 of the speed limit plans. | 70 miles per hour |
Mersham, Sevington | Kingsford Street. From a point 46 metres south-west of the current junction between Kingsford Street and Highfield Lane for a length of 137 metres to the point where the newly re-aligned road joins existing Kingsford Street. As shown on sheet 2 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option A only. New A2070 link road (westbound). From the diverge of the link road from the M20 Junction 10a circulatory carriageway heading west along its length to its merge with the new A2070 roundabout circulatory carriageway for a distance of 722 metres. As shown on sheets 2 and 3 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option A only. New A2070 link road (eastbound). From the diverge of the link road from the new A2070 roundabout circulatory carriageway heading east along its length to its merge with the M20 Junction 10a circulatory carriageway for a distance of 693 metres. As shown on sheets 2 and 3 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (westbound). From the diverge of the link road from the M20 Junction 10a circulatory carriageway heading west along its length to its merge with the new Stour Park roundabout circulatory carriageway for a distance of 363 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (westbound). From the diverge of the link road from the new Stour Park roundabout circulatory carriageway heading west along its length to its merge with the new A2070 roundabout circulatory carriageway for a distance of 288 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (eastbound). From the diverge of the link road from the new A2070 roundabout circulatory carriageway heading east along its length to its merge with the new Stour Park roundabout circulatory carriageway for a distance of 288 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (eastbound). From the diverge of the link road from the new Stour Park roundabout circulatory carriageway heading east along its length to its merge with the M20 Junction 10a circulatory carriageway for a distance of 338 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New Stour Park roundabout circulatory carriageway. For the whole length of the circulatory carriageway around the new Stour Park roundabout, a length of 200 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Sevington | New A2070 roundabout circulatory carriageway. For the whole length of the circulatory carriageway around the new A2070 roundabout, a length of 200 metres. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Ashford, Sevington | A2070 Bad Munstereifel Road (southbound). From a point 74 metres south of the diverge from the M20 Junction 10 circulatory carriageway along its length to where it joins the A2070 roundabout circulatory carriageway for a total distance of 370 metres. As shown on sheets 1 and 3 of the speed limit plans. | 40 miles per hour |
Ashford, Sevington | A2070 Bad Munstereifel Road (northbound). From where it leaves the A2070 roundabout circulatory carriageway along its length to a point 70 metres south of the merge to the M20 Junction 10 circulatory carriageway for a total distance of 394 metres. As shown on sheets 1 and 3 of the speed limit plans. | 40 miles per hour |
Sevington | A2070 Bad Munstereifel Road (southbound). From where it leaves the A2070 roundabout circulatory carriageway along its length to a point 27 metres south of the centreline of the junction with Church Road for a total distance of 394 metres. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Sevington | A2070 Bad Munstereifel Road (northbound). From a point 27 metres south of the centreline of the junction with Church Road along its length to where it joins the A2070 roundabout circulatory carriageway for a total distance of 395 metres. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Sevington | Barrey Road. From the junction with the A2070 to a point 46 metres to the west. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
PART 6E+W+STRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS)
Commencement Information
I6Sch. 3 Pt. 6 in force at 22.12.2017, see art. 1
(1) Parish(es) | (2) Road name, number and length | (3) Measures |
---|---|---|
Ashford, Sevington | A2070 Bad Munstereifel Road (northbound). From point A to point B on sheets 1 and 3 of the traffic regulation measures plans, for a total distance of 369 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Ashford, Sevington | A2070 Bad Munstereifel Road (southbound). From point E to point F on sheets 1 and 3 of the traffic regulation measures plans, for a total distance of 369 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington | A2070 Bad Munstereifel Road (northbound). From point K to point L on sheet 3 of the traffic regulation measures plans, for a total distance of 341 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington | A2070 Bad Munstereifel Road (southbound). From point M to point N on sheet 3 of the traffic regulation measures plans, for a total distance of 333 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington | New A2070 roundabout circulatory carriageway. For the whole length of the circulatory carriageway around the new A2070 roundabout, a length of 200 metres. As shown on sheet 3 of the traffic regulation measures plans. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option A only. New A2070 link road (eastbound). From point H to point G on sheets 2 and 3 of the traffic regulation measures plans, for a total distance of 636 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option A only. New A2070 link road (westbound). From point I to point J on sheets 2 and 3 of the traffic regulation measures plans, for a total distance of 657 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option B only. New A2070 link road (eastbound). From point H to point R on sheet 4 of the traffic regulation measures plans, for a total distance of 288 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option B only. New A2070 link road (eastbound). From point O to point G on sheet 4 of the traffic regulation measures plans, for a total distance of 282 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option B only. New A2070 link road (westbound). From point I to point P on sheet 4 of the traffic regulation measures plans, for a total distance of 302 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option B only. New A2070 link road (westbound). From point Q to point J on sheet 4 of the traffic regulation measures plans, for a total distance of 288 metres. | Clearway (to include verges, hard shoulders and slip roads) |
Sevington, Mersham | In the event of construction of the A2070 Option B only. New Stour Park roundabout circulatory carriageway. For the whole length of the circulatory carriageway around the new Stour Park roundabout, a length of 200 metres. As shown on sheet 4 of the traffic regulation measures plans. | Clearway (to include verges, hard shoulders and slip roads) |
PART 7E+W+SREVOCATIONS & VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS
Commencement Information
I7Sch. 3 Pt. 7 in force at 22.12.2017, see art. 1
(1) Parish(es) | (2) Road name, number and length | (3) Title of Order | (4) Revocations or Variations |
---|---|---|---|
Ashford, Sevington | A2070 Bad Munstereifel Road. From point C to point D on sheets 1 and 3 of the traffic regulation measures plans, a total distance of 748 metres. | The Kent County Council (Various Road, Ashford) (Prohibition of Waiting) (Clearway) Order 1995 | Order to be varied to remove the existing clearway over this length. |
PART 8E+W+SFOOTPATHS, CYCLE TRACKS AND FOOTWAYS
Commencement Information
I8Sch. 3 Pt. 8 in force at 22.12.2017, see art. 1
(1) Area | (2) Length of Footpath/Cycle track/Footway |
---|---|
Ashford Borough | 337 metres combined footway and cycle track from point A to point B on the rights of way and access plans. |
Ashford Borough | 90 metres combined footway and cycle track from point C to point D on the rights of way and access plans. |
Ashford Borough | 288 metres cycle track with a right of way on foot from point E to point F on the rights of way and access plans. |
Ashford Borough | In the event of construction of the A2070 Option A only, 1298 metres combined footway and cycle track from point F to point G on the rights of way and access plans. |
Ashford Borough | In the event of construction of the A2070 Option B only, 874 metres combined footway and cycle track from point F to point N on the rights of way and access plans. |
Ashford Borough | In the event of construction of the A2070 Option B only, 537 metres combined footway and cycle track from point O to point G on the rights of way and access plans. |
Ashford Borough | 425 metres cycle track with a right of way on foot from point G to point H on the rights of way and access plans. |
Ashford Borough | 50 metres footpath from point I to point K on the rights of way and access plans. |
Ashford Borough | 291 metres cycle track with a right of way on foot from point J to point K on the rights of way and access plans. |
Ashford Borough | 210 metres combined footway and cycle track from point K to point L on the rights of way and access plans. |
Ashford Borough | 81 metres combined footway and cycle track from point M to point N on the rights of way and access plans. |